Registered No litigation declared Commercial project

Trade Square 4th to 7th Floor

By ATUL PROPERTIES

RG-MH-03071 · RERA P51800020821 · Last updated on MahaRERA portal: 30 Jul 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
12 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 0%
20 of 35Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 56 documents Report an error

Trade Square 4th to 7th Floor is a Commercial project by ATUL PROPERTIES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800020821 on 10 May 2019. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 18 months from the original filing. 15 of the 35 units on this registration are recorded sold or booked, and 12 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameTrade Square 4th to 7th Floor
  • TypeCommercial
  • Location
    • Mehra Compound
    • Sakinaka
    • Andheri East
    • Andheri
    • Mumbai Suburban
    • 400059
  • Pincode400059
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800020821
  • ReraGenie IDRG-MH-03071

Builder

  • NameATUL PROPERTIES
  • Entity typePartnership
  • PartnersLAIQ RAFIQUE SHAIKH, MAHTAB LAIQ SHAIKH, NATHALAL BHAGWANJI DELVADIA, Atul Nathabhai Patel
  • Declared earlier projects1 →

Key dates

1 months past promisethis monthRegisteredMay 2019First promiseMar 2025Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 May 2019
  • Promised completion30 Sep 2026
  • Revised completionRevised to 30 Sep 2026 (originally 30 Mar 2025)
  • Buildings2 building records
  • Documents filed56 files

Current status

43%15 of 35 units booked
100.0%Work done, per cost certificate

Figures as on 30 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing A 4th to 7th FloorNA6502020
Wing B 4th to 7th FloorNA6501515

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 30 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.

Wing A 4th to 7th Floor55%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing B 4th to 7th Floor55%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 30 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,755 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Sep 2025
LandownerVillageDistrict
Shradha RealtorsAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityMUNICIPAL CORPORATION OF GREATER MUMBAI
Permissible FSI4773.33
Proposed, not sanctioned4,773 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Centre Point, Andheri Kurla Rd, J B Nagar, Mumbai - 400 059
Estimated costRs 10.86 cr
Cost incurredRs 10.86 cr
Work done100.0%
BuildingWingEstimatedIncurred
Wing A 4th to 7th FloorNARs 5.21 crRs 5.21 cr
Wing B 4th to 7th FloorNARs 5.21 crRs 5.21 cr
-NARs 44.60 lakhRs 44.60 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPushkar Consultants
EngineerSufiyan Arif Khilji
EngineerSuresh Sable
EngineerJACOB BASTYAW DSOUZA
Engineerclint dos santoos
Chartered AccountantSANKET R SHAH & ASSOCIATES
Chartered AccountantKEVIN SHAH & ASSOCIATES
PartnerRole in project
ATUL PROPERTIES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA01072621652Mar 2025 → Sep 2026

Reason as filed by the promoterOC recived

Litigation declared9

CaseCourtStatus
AO/281/2016/2016High Court MumbaiPre Admission
AOST/9185/2016/2016High Court MumbaiPre Admission
AOST/9173/2016/2016High Court MumbaiPre Admission
AOST/9166/2016/2016High Court MumbaiPre Admission
AOST/9193/2016/2016High Court MumbaiPre Admission
103414/2013/2013City Civil Court MumbaiFor Chamber Summons Hearing
103415/2013/2013City Civil Court MumbaiFor Chamber Summons Hearing
103449/2013/2013City Civil Court MumbaiFor Chamber Summons Hearing
101189/2014/2014City Civil Court MumbaiFor Chamber Summons Hearing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000292530Jaguar Shipping and Logistics Pvt. Ltd.Atul Enterprises05/09/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Apr 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Apr 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Apr 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Apr 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed56

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A - Trade Square Apr 25 -Mar 26 Final.pdf30 Jul 2026
Withdrawal Update Form 1File: Form 1 June 25.pdf29 Jul 2026
Withdrawal Update Form 1File: Form 1 Sep 25.pdf29 Jul 2026
Withdrawal Update Form 1File: Pushkar Consultants 3.pdf29 Jul 2026
Withdrawal Update Form 1File: Pushkar Consultants 1.pdf29 Jul 2026
Withdrawal Update Form 1File: Pushkar Consultants 2.pdf29 Jul 2026
Withdrawal Update Form 2File: Form 2 - Trade Square Apr 25 - Jun 25.pdf29 Jul 2026
Withdrawal Update Form 2File: Form 2 - Trade Square Jul 25 - Sep 25.pdf29 Jul 2026
Withdrawal Update Form 2File: Form 2 - Trade Square Oct 25 - Dec 25.pdf29 Jul 2026
Withdrawal Update Form 2File: Form 2 - Trade Square Jan 26 - Mar 26.pdf29 Jul 2026
Withdrawal Update Form 2File: Form 2 - Trade Square Apr 26 - Jun 26.pdf29 Jul 2026
Withdrawal Update Form 3File: Form III Trade Square Apr 25 - Jun 25.pdf29 Jul 2026
Withdrawal Update Form 3File: Form III Trade Square Jul 25 - Sep 25.pdf29 Jul 2026
Withdrawal Update Form 3File: Form III Trade Square Oct 25 - Dec 25.pdf29 Jul 2026
Withdrawal Update Form 3File: Form III Trade Square Jan 26 - Mar 26.pdf29 Jul 2026
Withdrawal Update Form 3File: Form III Trade Square Apr 26 - Jun 26.pdf29 Jul 2026
Form 2A (FY 2024-2025)File: Form 2A - Trade Square Apr 24 -Mar 25 Final.pdf29 Jul 2026
Form 5 (FY 2024-2025)File: Form 5 Trade Square - March 2025.pdf29 Jul 2026
Certificates of CA (Form 3)File: Final Form III Trade Square - Dec 24.pdf29 Jan 2025
Certificates of CA (Form 3)File: Trade Square Form III Jun 24.pdf7 Nov 2024
Certificates of CA (Form 3)File: Trade Square Form III Sep 24.pdf7 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Trade Square FY 23-24.pdf28 Oct 2024
Certificates of CA (Form 3)File: Form III_Atul Properties.pdf24 Apr 2024
Certificates of CA (Form 3)File: Form III_Atul Properties Sept`22 comp.pdf13 Jan 2023
Certificates of CA (Form 3)File: Form III_Atul Properties Dec`22 comp.pdf13 Jan 2023
Certificates of CA (Form 3)File: Atul Properties June`22 Form III comp.pdf14 Nov 2022
Certificates of CA (Form 3)File: Atul Properties June`22 Form III comp.pdf14 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Atul Properties Form 5.pdf30 Sep 2022
Certificates of CA (Form 3)File: Form III_Atul Properties.pdf29 Apr 2022
Certificates of CA (Form 3)File: tinywow_compress_662746_compressed.pdf7 Feb 2022
Certificates of CA (Form 3)File: RERA Certificate (Form III) (Sept 21) Trade Square compresed.pdf7 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: fORM F 20-21.pdf1 Oct 2021
Declaration about Commencement CertificateFile: Trade Square.pdf21 Jun 2021
Disclosure of sold/ booked inventoryFile: Trade Square-compressed.pdf10 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate trade square- Form II.pdf24 May 2021
Certificates of CA (Form 3)File: Trade Squre 4th Floor to 7th Floor - Form - III.pdf24 May 2021
Certificates of CA (Form 3)File: Trade Squre 4th Floor to 7th Floor - Form - III.pdf24 May 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5.pdf1 Oct 2020
OtherFile: FORM 5.pdf30 Sep 2020
Certificates of CA (Form 3)File: FORM - III TRADE SQUARE.pdf23 Jul 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: IMG_20200722_0003.pdf22 Jul 2020
Certificates of CA (Form 3)File: Rera cer_sept 19_Trade seq.pdf2 Nov 2019
Proforma of Allotment letterFile: AFS.pdf2 May 2019
OtherFile: Self Declaration.pdf24 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate compressed.pdf16 Apr 2019
Certificates of CA (Form 3)File: CA Certificate compressed.pdf16 Apr 2019
Details of encumbrancesFile: No encumbrance Certificate.pdf4 Apr 2019
Declaration in FORM BFile: Form B.pdf4 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 1 Engineer Certificate.pdf4 Apr 2019
Building plan approvalFile: IOD Atul Properties.pdf3 Apr 2019
Layout approvalFile: Layout Approval.pdf3 Apr 2019
PAN CardFile: PAN Card Atul Properties.pdf3 Apr 2019
Copy of the legal title reportFile: Title Certificate Trade Square.pdf3 Apr 2019
Copy of Layout Approval (in case of layout)File: Layout Approval.pdf3 Apr 2019
Building Plan Approval (IOD)File: IOD Atul Properties.pdf3 Apr 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate compressed.pdf3 Apr 2019

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Blue MeadowsBehind Majas Depot Off. JVLR Andheri East Mumbai 93.139CompletedMar 2016Late, Jun 2016

How this compares with Mumbai Suburban

43%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 18 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Trade Square 4th to 7th Floor on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Andheri East6,700+ in Mumbai Suburban

2 kmTrade Square 4th to 7th Completed 58Lapsed / revoked 28Other 43Dot size: filed unitsN

Filed coordinates, straight-line distance. 129 registered projects within 2 km.

Builder: ATUL PROPERTIES

ATUL PROPERTIES has 1 registration on MahaRERA, including Trade Square 4th to 7th Floor. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Trade Square 4th to 7th Floor is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Trade Square 4th to 7th Floor?

The registered promoter entity is ATUL PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Trade Square 4th to 7th Floor?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Trade Square 4th to 7th Floor?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Trade Square 4th to 7th Floor?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Trade Square 4th to 7th Floor?

The professionals named in the filing: Architect: Pushkar Consultants; Engineer: Sufiyan Arif Khilji; Engineer: Suresh Sable; Engineer: JACOB BASTYAW DSOUZA; Engineer: clint dos santoos; Chartered Accountant: SANKET R SHAH & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Trade Square 4th to 7th Floor?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Trade Square 4th to 7th Floor. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Trade Square 4th to 7th Floor to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.