Registration lapsed No litigation declared Others project

Tower A to D on CTS no 104pt, 106pt, 224/1A, 224/1B in Village Ghodbunder, Mira Road

By RNA Corp Pvt. Ltd

RG-MH-24576 · RERA P51700008296 · Last updated on MahaRERA portal: 11 Jun 2019

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 87 months past the filed date
  • 8 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jul 2019Possession promised87 months past this date
12 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 96%
8Complaints at MahaRERAon this registration
Jump to the 72 documents Report an error

Tower A to D on CTS no 104pt, 106pt, 224/1A, 224/1B in Village Ghodbunder, Mira Road is a Others project by RNA Corp Pvt. Ltd in Thane, Maharashtra, registered with MahaRERA as P51700008296 on 18 Aug 2017. Possession was promised by 31 Jul 2019 and is now 87 months past that date. The completion date has moved by 12 months from the original filing. 8 complaints are on record with the regulator.

At a glance

Project

  • NameTower A to D on CTS no 104pt, 106pt, 224/1A, 224/1B in Village Ghodbunder, Mira Road
  • TypeOthers
  • Location
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700008296
  • ReraGenie IDRG-MH-24576

Builder

  • NameRNA Corp Pvt. Ltd
  • Entity typeCompany
  • Other registrations1 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

87 months past promisethis monthRegisteredAug 2017First promiseJul 2018Revised toJul 2019

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on18 Aug 2017
  • Promised completion31 Jul 2019
  • Revised completionRevised to 31 Jul 2019 (originally 31 Jul 2018)
  • Buildings2 building records
  • Documents filed72 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RNA VIVA Tower A and BNA220000
RNA VIVA Tower C and DNA220000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 11 Jun 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 96%.

RNA VIVA Tower A and B87%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises94%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks96%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.96%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.31%
RNA VIVA Tower C and D87%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises93%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks93%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.31%

Progress on shared amenities16

As on 11 Jun 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsYes40%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes35%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes30%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes20%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
Covered ParkingYes30%

Parking filed162

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots162
Closed/Covered138
Open Space24
BuildingClosed/CoveredOpen SpaceTotal
RNA VIVA Tower A and B691281
RNA VIVA Tower C and D691281

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,696 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI17400.0
Proposed, not sanctioned16,295 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKalanagar Branch 400051

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnish & Associates
EngineerH M Raje Structural Consultants Pvt Ltd
PartnerRole in project
RNA Corp Pvt. Ltd-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700000536Jul 2018 → Jul 2019

Reason as filed by the promoterThe proposed Residential Towers A to D - Stilt plus First floor part Podium plus 2nd to 19 Upper floors were proposed as per the prevailing MBMC norms. The building plans were approved and the CC was issued on13 November 2013. Till date a large portion of the construction work has been completed including finishes. Due to internal changes proposed within the approved footprint of the building an application for amended Building Plans was submitted to MBMC on 12/03/2008 for RNA Viva Project. Hence we are awaiting the approval from MBMC. We presume that approval /Occupation Certificate will requ

Litigation declared15

CaseCourtStatus
CC/186/2016/2016State Consumer Dispute Redressal Commission Maharashtra at MumbaiFor hearing on admission
CC/859/2016/2016State Consumer Dispute Redressal Commission Maharashtra at MumbaiEvidence of both the parties
RCS/371/2017/2017The Court of Civil Judge Senior Division ThaneFor filing written version
311 of 2017/2017High court BombayFor Admission
CC006000000000788 Mr Brian Aranha va RNA Corp Pvt Ltd/2017MahaRERA AuthorityDisposed off
428 of 2017 RNA Viva Residents Association Vs RNA Corp Pvt Ltd/2017Hon High Court BombayFor Hearing Admission
CC006000000000703 of 2017 PRADEEP S RAWAT Vs RNA Corp Pvt Ltd/2017MahaRERA AuthorityDisposed Off
CC006000000012804 Mr Sivasubramaniaraja Pil Mr ANIL KUMAR SINGH Mr SANDEEP K VANMALI Mr GAURISHANKAR GUPTA/2017MahaRERA AuthorityDisposed Off
CC006000000012673 CHANDRAGUPTA S MAURYA/2017MahaRERA AuthorityWe are in process of filling reply
CC006000000012609 0F 2017 Meenakshi Garg V/s RNA Corp Pvt ltd/2017MAHA RERA AuthorityDisposed Off
RERA Appellate Tribunal Appeal No 10337 of 2018 Mr Chandragupta Maurya Vs RNA Corp Pvt Ltd/2018RERA Appellate TribunalTo file our reply
RERA Appellate Tribunal Appeal No 12804 of 2018 Mr Anil Kumar Singh Vs RNA Corp Pvt Ltd/2018RERA Appellate TribunalTo file our reply
Comm Suit 610 Of 2017 Santec Fabricators V/s RNA Corp Pvt Ltd/2017High Court BombayDisposed Off
State Commission CC/286/2016 Omprakash Yadav V/s RNA Corp Pvt /2016State Commissison MaharashtraFor Evidence
State Commission CC/186/2016 Sanjay Sinha V/s RNA Corp Pvt Ltd/2016State Commission MaharashtraFor Evidence

Complaints filed with MahaRERA8

Case no.ComplainantRespondentFiled
CC006000000000703PRADEEP S RAWATANUBHAV ANIL KUMAR AGGARWAL11/11/2017
CC006000000000788Brian AranhaAnubhav Anilkumar Aggarwal23/09/2017
CC006000000012673CHANDRAGUPTA S MAURYARNA CORP PVT LTD02/01/2018
CC006000000012331James MenezesRna corp pvt ltd08/12/2017
CC006000000012609Meenakshi GargAnubhav Anil Kumar Agarwal30/12/2017
CC006000000056293VIKAS GARGANUBHAV ANILKUMAR AGGARWAL30/09/2018
CC006000000012804MR.ANIL KUMAR SINGHRNA CORP PVT LLTD10/01/2018
CC006000000057085Bhawana Patel and Vishal PatelRNA Corp Pvt Ltd29/11/2018

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Apr 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed72

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Viva Phase 1.pdf11 Jun 2019
OtherFile: Viva Environmental Clearance.pdf30 Aug 2018
Copy of the legal title reportFile: Project VIVA I - One Page Title Report.pdf26 Apr 2018
Proforma of Allotment letterFile: final -Viva-phI-22 3 18- AFS ready for print.pdf23 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: VIVA I Eng Certificate.pdf31 Jul 2017
Certificates of CA (Form 3)File: VIVA I Form 3 Part 1.pdf31 Jul 2017
Certificates of CA (Form 3)File: VIVA I Form 3 Part 2.pdf31 Jul 2017
OtherFile: Note 1.pdf31 Jul 2017
PAN CardFile: PAN Card.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate for VIVA I.pdf30 Jul 2017
Proforma of Allotment letterFile: VIVA I.pdf30 Jul 2017
Details of encumbrancesFile: Viva Encumbrances.pdf29 Jul 2017
Declaration in FORM BFile: VIVA I Form B.pdf29 Jul 2017
Layout approvalFile: 1 Block Plan.pdf28 Jul 2017
Copy of Layout Approval (in case of layout)File: 1 Block Plan.pdf28 Jul 2017
Building plan approvalFile: 20 Plot A Wing I GR and 2nd Fl.pdf27 Jul 2017
Building plan approvalFile: 19 Wing G and H 8 and 13 Refuge.pdf27 Jul 2017
Building plan approvalFile: 13 Plot A Wing E and F 4th Fl 5 11 14 and 17 Fl.pdf27 Jul 2017
Building plan approvalFile: 14 Wing E and F 5 11 14 and 17 Fl 6 9 12 15 and 18 Fl.pdf27 Jul 2017
Building plan approvalFile: 15 Plot A Wing E and F 8 and 13 Fl.pdf27 Jul 2017
Building plan approvalFile: 16 Plot A Wing G and H GRD and 1st Podium 2nd Fl.pdf27 Jul 2017
Building plan approvalFile: 17 Plot A Wing G and H 5 11 14 17 Fl.pdf27 Jul 2017
Building plan approvalFile: 18 Wing G and H 3 6 9 12 15 Fl 4 7 10 16 Fl.pdf27 Jul 2017
Building plan approvalFile: 6 Plot A Wing A to D and GRD 1st Fl.pdf27 Jul 2017
Building plan approvalFile: 7 Plot A Wing A to D and 2 and 3 Fl.pdf27 Jul 2017
Building plan approvalFile: 8 Plot A Wing A to D for 4Fl 4 and 11 and 14 and 17.pdf27 Jul 2017
Building plan approvalFile: 9 Wing A to D 6 9 12 15 and 18 Fl 7 10 16 and 19 Fl.pdf27 Jul 2017
Building plan approvalFile: 10 Plot A Wing A to D 8 and 13 Fl.pdf27 Jul 2017
Building plan approvalFile: 11 Wing E and F GRD and 1st Fl.pdf27 Jul 2017
Building plan approvalFile: 12 Plot A Wing E and F 2 and 3 Fl.pdf27 Jul 2017
Building plan approvalFile: 3 Ground Fl A to I.pdf27 Jul 2017
Building plan approvalFile: 2 Area Statement.pdf27 Jul 2017
Building plan approvalFile: 4 1st Fl Podium Plan.pdf27 Jul 2017
Building plan approvalFile: 5 2nd Fl Podium Plan.pdf27 Jul 2017
Building plan approvalFile: RNA Viva IOA and C C dt13 Nov 2013.pdf27 Jul 2017
Building plan approvalFile: 1 Block Plan.pdf27 Jul 2017
Building plan approvalFile: 23 Section Wing A B C D E and F.pdf27 Jul 2017
Building plan approvalFile: 24 Section Wing G and H.pdf27 Jul 2017
Building plan approvalFile: 25 Section Wing I.pdf27 Jul 2017
Building plan approvalFile: 21 Plot A Wing I 4 7 10 Fl 3 6 9 12 15 Fl.pdf27 Jul 2017
Building plan approvalFile: 22 Plot A Wing I 5 11 14 Fl 8 and 13 Fl.pdf27 Jul 2017
Building plan approvalFile: 23 Section Wing A B C D E and F.pdf27 Jul 2017
Copy of the legal title reportFile: Legal Opinion K A Suryanarayanan RNA Viva pg 1 to 8.pdf27 Jul 2017
Copy of the legal title reportFile: Legal Opinion K A Suryanarayanan RNA Viva pg 9 to 16.pdf27 Jul 2017
Building Plan Approval (IOD)File: RNA Viva IOA and C C dt13 Nov 2013.pdf27 Jul 2017
Building Plan Approval (IOD)File: 1 Block Plan.pdf27 Jul 2017
Building Plan Approval (IOD)File: 2 Area Statement.pdf27 Jul 2017
Building Plan Approval (IOD)File: 3 Ground Fl A to I.pdf27 Jul 2017
Building Plan Approval (IOD)File: 4 1st Fl Podium Plan.pdf27 Jul 2017
Building Plan Approval (IOD)File: 5 2nd Fl Podium Plan.pdf27 Jul 2017
Building Plan Approval (IOD)File: 6 Plot A Wing A to D and GRD 1st Fl.pdf27 Jul 2017
Building Plan Approval (IOD)File: 7 Plot A Wing A to D and 2 and 3 Fl.pdf27 Jul 2017
Building Plan Approval (IOD)File: 8 Plot A Wing A to D for 4Fl 4 and 11 and 14 and 17.pdf27 Jul 2017
Building Plan Approval (IOD)File: 9 Wing A to D 6 9 12 15 and 18 Fl 7 10 16 and 19 Fl.pdf27 Jul 2017
Building Plan Approval (IOD)File: 10 Plot A Wing A to D 8 and 13 Fl.pdf27 Jul 2017
Building Plan Approval (IOD)File: 11 Wing E and F GRD and 1st Fl.pdf27 Jul 2017
Building Plan Approval (IOD)File: 12 Plot A Wing E and F 2 and 3 Fl.pdf27 Jul 2017
Building Plan Approval (IOD)File: 13 Plot A Wing E and F 4th Fl 5 11 14 and 17 Fl.pdf27 Jul 2017
Building Plan Approval (IOD)File: 14 Wing E and F 5 11 14 and 17 Fl 6 9 12 15 and 18 Fl.pdf27 Jul 2017
Building Plan Approval (IOD)File: 15 Plot A Wing E and F 8 and 13 Fl.pdf27 Jul 2017
Building Plan Approval (IOD)File: 16 Plot A Wing G and H GRD and 1st Podium 2nd Fl.pdf27 Jul 2017
Building Plan Approval (IOD)File: 17 Plot A Wing G and H 5 11 14 17 Fl.pdf27 Jul 2017
Building Plan Approval (IOD)File: 18 Wing G and H 3 6 9 12 15 Fl 4 7 10 16 Fl.pdf27 Jul 2017
Building Plan Approval (IOD)File: 19 Wing G and H 8 and 13 Refuge.pdf27 Jul 2017
Building Plan Approval (IOD)File: 20 Plot A Wing I GR and 2nd Fl.pdf27 Jul 2017
Building Plan Approval (IOD)File: 21 Plot A Wing I 4 7 10 Fl 3 6 9 12 15 Fl.pdf27 Jul 2017
Building Plan Approval (IOD)File: 22 Plot A Wing I 5 11 14 Fl 8 and 13 Fl.pdf27 Jul 2017
Building Plan Approval (IOD)File: 23 Section Wing A B C D E and F.pdf27 Jul 2017
Building Plan Approval (IOD)File: 23 Section Wing A B C D E and F.pdf27 Jul 2017
Building Plan Approval (IOD)File: 24 Section Wing G and H.pdf27 Jul 2017
Building Plan Approval (IOD)File: 25 Section Wing I.pdf27 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC RNA Viva IOA and C C dt 13 Nov 2013.pdf27 Jul 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Tower A to D on CTS no 104pt, 106pt, 224/1A, on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mira-Bhayandar (M Corp.)7,600+ in Thane

2 kmTower A to D on CTS no 1Completed 106Lapsed / revoked 79Other 109Dot size: filed unitsN

Filed coordinates, straight-line distance. 294 registered projects within 2 km.

Builder: RNA Corp Pvt. Ltd

RNA Corp Pvt. Ltd has 2 registrations on MahaRERA, including Tower A to D on CTS no 104pt, 106pt, 224/1A, 224/1B in Village Ghodbunder, Mira Road and Tower E to I on CTS no 104pt, 106pt, 224/1A, 224/1B in Village Ghodbunder, Mira Road. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that Tower A to D on CTS no 104pt, 106pt, 224/1A, 224/1B in Village Ghodbunder, Mira Road shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Tower A to D on CTS no 104pt, 106pt, 224/1A, 224/1B in Village Ghodbunder, Mira Road is delayed beyond 31 Jul 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Tower A to D on CTS no 104pt, 106pt, 224/1A, 224/1B in Village Ghodbunder, Mira Road?

The registered promoter entity is RNA Corp Pvt. Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Tower A to D on CTS no 104pt, 106pt, 224/1A, 224/1B in Village Ghodbunder, Mira Road?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Tower A to D on CTS no 104pt, 106pt, 224/1A, 224/1B in Village Ghodbunder, Mira Road?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Tower A to D on CTS no 104pt, 106pt, 224/1A, 224/1B in Village Ghodbunder, Mira Road?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Tower A to D on CTS no 104pt, 106pt, 224/1A, 224/1B in Village Ghodbunder, Mira Road?

The professionals named in the filing: Architect: Anish & Associates; Engineer: H M Raje Structural Consultants Pvt Ltd. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Tower A to D on CTS no 104pt, 106pt, 224/1A, 224/1B in Village Ghodbunder, Mira Road?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Tower A to D on CTS no 104pt, 106pt, 224/1A, 224/1B in Village Ghodbunder, Mira Road. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Tower A to D on CTS no 104pt, 106pt, 224/1A, to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.