Registration lapsed No litigation declared Residential / Group Housing project

Three Sixty West

By Oasis Realty

RG-MH-24512 · RERA P51900012115 · Last updated on MahaRERA portal: 7 Apr 2022

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 52 months past the filed date
  • 6 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Jun 2022Possession promised52 months past this date
10 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 95%
6Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

Three Sixty West is a Residential / Group Housing project by Oasis Realty in Worli, 400025, registered with MahaRERA as P51900012115 on 1 Sep 2017. Possession was promised by 30 Jun 2022 and is now 52 months past that date. The completion date has moved by 12 months from the original filing. 6 complaints are on record with the regulator.

At a glance

Project

  • NameThree Sixty West
  • TypeResidential / Group Housing
  • Location
    • Dr. Annie Besant Road
    • Worli
    • 400025
  • Pincode400025
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900012115
  • ReraGenie IDRG-MH-24512

Builder

  • NameOasis Realty
  • Entity typeOthers
  • Named personsOberoi Constructions Limited, Sky Lark Buildcon Private LImited, Shree Vrunda Enterprises, Astir Realty LLP
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

52 months past promisethis monthRegisteredSep 2017First promiseJun 2021Revised toJun 2022

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on1 Sep 2017
  • Promised completion30 Jun 2022
  • Revised completionRevised to 30 Jun 2022 (originally 30 Jun 2021)
  • Buildings2 building records
  • Documents filed77 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower ANA710000
Tower BNA1090000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 7 Apr 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 95%.

Tower A74%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises79%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.81%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.59%
Tower B83%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure73%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises88%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks89%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.78%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.86%

Progress on shared amenities16

As on 7 Apr 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes87%
Storm Water DrainsYes96%
Landscaping & Tree PlantingYes90%
Street LightingYes90%
Community BuildingsYes99%
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes75%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes70%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
Tower A is proposed to comprise of upto 34 floors for Hotel usersYes0%

Parking filed1104

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,104
Closed/Covered1,104
BuildingClosed/CoveredTotal
Tower A168168
Tower B936936

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,406 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI149000.0
Proposed, not sanctioned119,747 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchManish Chambers, Commercial Complex, Sonawala Road, Goregaon East, Mumbai 400063

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectWesymor Consultants Pvt. Ltd.
EngineerLeslie E. Robertson Associates Consulting Engineers (India) Pvt Ltd (LERA)
PartnerRole in project
Oasis Realty-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900010231Jun 2021 → Dec 2021

Reason as filed by the promoter1. We have registered the said Project with the Maharashtra Real Estate Regulatory Authority (hereinafter referred to as "Authority") under the provisions of Real Estate (Regulation and Development) Act, 2016 (hereinafter referred to as "RERA") and the rules made thereunder. 2. The Authority has issued Certificate of Registration dated 1st September, 2017 with validity up to 30th December, 2020 and the same was suo moto extended up to 30th June, 2021 under the Authority’s circular dated 18th May, 2020 and a revised certificate dated 18th May, 2020 was issued by the Authority subsequently. 3. W

Litigation declared9

CaseCourtStatus
Contempt Petition No 2 of 2017/2017Bombay High CourtPending
Suit No 1705/2011Bombay City Civil Court at BombayPending
Long Cause Suit No 2411/2009Bombay City Civil Court at BombayPending
Complaint No 1310/2013Metropolitan Magistrate Sixty Second Court at DadarPending
62/2017Bombay High CourtPending
231/2018State Consumer Disputes Redressal CommissionPending
406 of 2020/2020High CourtPending
1750/2021High Court BombayPending
05/2021National Green Tribunal PunePending

Complaints filed with MahaRERA6

Case no.ComplainantRespondentFiled
CC006000000001408Dr. Bharti ChintakindiShri. Dilip Shrinivas Hate & others.22/10/2017
CC006000000198120Oasis RealtyAmit Oberoi27/08/2021
CC006000000209954Parle Agro Pvt LtdOasis Realty09/02/2022
CC006000000209955Parle Agro Pvt LtdOasis Realty09/02/2022
CC006000000209956Parle Agro Pvt LtdOasis Realty09/02/2022
CC006000000209957Parle Agro Pvt LtdOasis Realty09/02/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Nov 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TSW_June21.pdf7 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TSW_Sept21.pdf7 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Three Sixty West_Q2FY22.pdf17 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Three Sixty West_Q3FY22.pdf17 Jan 2022
Certificates of CA (Form 3)File: Three Sixty West CA Certificate Sep 2021 [Low Res].pdf14 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Oasis Realty Form 5 - 2021.pdf1 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Three Sixty West_Q1FY22.pdf17 Aug 2021
Declaration about Commencement CertificateFile: 360W_CC_Declaration.pdf12 Jul 2021
Disclosure of sold/ booked inventoryFile: 360W_Inventory Data.pdf12 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Three Sixty West_Engineers Certificate_Q4FY21-Updated.pdf6 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Three Sixty West_Quality Certificate_FY20.pdf2 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Three Sixty West_Quality Certificate_FY21.pdf2 Jul 2021
Certificates of CA (Form 3)File: Three Sixty West_CA Certificate_Q4FY21_Comp.pdf2 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Three Sixty West_Architect Certificate_Q4FY21_Compressed.pdf1 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Oasis Realty - Form 5_FY19.pdf1 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Oasis Realty - Form 5_FY20.pdf1 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Three Sixty West_Architect Certificate_Q2FY21.pdf25 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Three Sixty West_Architect Certificate_Q3FY21.pdf25 Jun 2021
Certificates of CA (Form 5)File: Oasis Realty - Form 5.pdf10 Mar 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Three Sixty West_Engineers Certificate_Q3FY21.pdf20 Feb 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Three Sixty West_Engineers Certificate_Q2FY21.pdf20 Feb 2021
Certificates of CA (Form 3)File: Three Sixty West_CA Certificate_Q4FY20.pdf20 Feb 2021
Certificates of CA (Form 3)File: Three Sixty West_CA Certificate_Q1FY21.pdf20 Feb 2021
Certificates of CA (Form 3)File: Three Sixty West_CA Certificate_Q2FY21.pdf20 Feb 2021
Certificates of CA (Form 3)File: Three Sixty West_CA Certificate_Q3FY21.pdf20 Feb 2021
Certificates of CA (Form 3)File: Three Sixty West_CA Certificate_Q4FY20.pdf4 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Three Sixty West_Architect Certificate_Q3FY20.pdf16 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Three Sixty West_Architect Certificate_Q4FY20.pdf16 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Three Sixty West_Architect Certificate_Q1FY21.pdf16 Sep 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Three Sixty West_Engineers Certificate_Q4FY20.pdf16 Sep 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Three Sixty West_Engineers Certificate_Q1FY21.pdf16 Sep 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Three Sixty West_Engineers Certificate_Q3FY20.pdf29 Mar 2020
Certificates of CA (Form 3)File: Three Sixty West_CA Certificate_Q3FY20.pdf29 Mar 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Three Sixty West_Architect Certificate_Q2FY20_Compressed.pdf25 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Three Sixty West_Engineers Certificate_Q2FY20.pdf25 Dec 2019
Certificates of CA (Form 3)File: Three Sixty West_CA Certificate_Q2FY20.pdf25 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Three Sixty West_Architect Certificate_Q1FY20.pdf16 Oct 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Three Sixty West_Engineers Certificate_Q1FY20.pdf16 Oct 2019
Certificates of CA (Form 3)File: Three Sixty West_CA Certificate_Q1FY20.pdf16 Oct 2019
Certificates of CA (Form 5)File: Form 5 360 West 201903.pdf30 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Three Sixty West_Engineers Certificate_Q4FY19.pdf22 Jul 2019
Certificates of CA (Form 3)File: Three Sixty West_CA Certificate_Q4FY19.pdf22 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Three Sixty West_Architect Certificate_Q4FY19.pdf10 Jul 2019
Certificates of CA (Form 3)File: Three Sixty West_CA Certificate_Q3FY19.pdf27 Mar 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Three Sixty West_Architect Certificate_Q3FY19.pdf26 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Three Sixty West_Engineers Certificate_Q3FY19.pdf26 Mar 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Three Sixty West-Architect-Certificate-Q2FY19.pdf9 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Three Sixty West_Engineers Certificate_Q2FY19.pdf31 Dec 2018
Certificates of CA (Form 3)File: Three Sixty West_CA Certificate_Q2FY19.pdf24 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Three Sixty West Q1FY19.pdf9 Oct 2018
Certificates of CA (Form 3)File: CA Certificate - Three Sixty West Q1FY19.PDF9 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Three Sixty West Q1FY19.pdf3 Oct 2018
Certificates of CA (Form 5)File: TSW - Form 5.pdf30 Sep 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Three Sixty West Q4FY18.pdf5 Jun 2018
Certificates of CA (Form 3)File: CA Certificate - Three Sixty West Q4FY18.pdf5 Jun 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Three Sixty West Q4FY18.pdf16 May 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Three Sixty West Q3FY18.pdf8 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Three Sixty West Q2FY18.pdf8 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Three Sixty West Q3FY18.pdf8 Mar 2018
Certificates of CA (Form 3)File: CA Certificate - Three Sixty West Q3FY18.PDF8 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Three Sixty West.pdf13 Dec 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Three Sixty West.pdf13 Dec 2017
Certificates of CA (Form 3)File: CA Certificate - Three Sixty West.PDF13 Dec 2017
Copy of the legal title reportFile: Three Sixty West - Updated Title Certificate.pdf24 Nov 2017
Layout approvalFile: Approved Layout.pdf31 Jul 2017
Building plan approvalFile: Three Sixty West - IOA.PDF31 Jul 2017
PAN CardFile: Oasis Realty - PAN.pdf31 Jul 2017
Copy of the legal title reportFile: Title Certificate.pdf31 Jul 2017
Details of encumbrancesFile: Three Sixty West - Encumbrance Certificate.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: Approved Layout.pdf31 Jul 2017
Building Plan Approval (IOD)File: Three Sixty West - IOA.PDF31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Three Sixty West - Commencement Certificate.pdf31 Jul 2017
Declaration in FORM BFile: Three Sixty West - Form B.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Three Sixty West - Architect Certificate.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Three Sixty West - Engineers Certificate.pdf31 Jul 2017
Certificates of CA (Form 3)File: Three Sixty West - CA Certificate.pdf31 Jul 2017
Proforma of Allotment letterFile: Agreement for Sale to be uploaded.pdf31 Jul 2017

Keep Three Sixty West on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Worli

2 kmThree Sixty WestCompleted 10Lapsed / revoked 9Other 8Dot size: filed unitsN

Filed coordinates, straight-line distance. 27 registered projects within 2 km.

Builder: Oasis Realty

Oasis Realty has 2 registrations on MahaRERA, including Three Sixty West and Oasis Elysian Wing C. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record.

Frequently asked questions

What does it mean that Three Sixty West shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Three Sixty West is delayed beyond 30 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Three Sixty West?

The registered promoter entity is Oasis Realty, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Three Sixty West?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Three Sixty West?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Three Sixty West?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Three Sixty West?

The professionals named in the filing: Architect: Wesymor Consultants Pvt. Ltd.; Engineer: Leslie E. Robertson Associates Consulting Engineers (India) Pvt Ltd (LERA). Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Three Sixty West?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Three Sixty West. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Three Sixty West to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.