THE VIVEK FLAT OWNERS CHS LTD
By YASH ASHOKA
RG-MH-51936 · RERA P51700014218 · Last updated on MahaRERA portal: 24 Mar 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- Completion date moved by 36 months
- 3 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
THE VIVEK FLAT OWNERS CHS LTD is a Residential / Group Housing project by YASH ASHOKA in Thane, Maharashtra, registered with MahaRERA as P51700014218 on 16 Nov 2017. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 36 months from the original filing.
At a glance
Project
- NameTHE VIVEK FLAT OWNERS CHS LTD
- TypeResidential / Group Housing
- Location
- NAUPADA
- Thane (M Corp.)
- Thane
- 400602
- Pincode400602
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700014218
- ReraGenie IDRG-MH-51936
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on16 Nov 2017
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 25 Dec 2022)
- Buildings1 building record
- Documents filed102 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| VIVEk SOC | NA | 14 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 24 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.
VIVEk SOC: 79% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 65% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 70% |
Progress on shared amenities15
As on 24 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 80% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 70% |
| Electrical meter room, sub-station, receiving station | Yes | 75% |
| Aggregate area of recreational Open Space | Yes | 75% |
| Open Parking | Yes | 85% |
Parking filed68
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar Godbole Mukadam & Associates |
| Engineer | Anant Sawant |
| Chartered Accountant | ANIL BABU SHETTY |
| Chartered Accountant | RAHUL N GHARAT |
| Partner | Role in project |
|---|---|
| YASH ASHOKA | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterOC Not Received From Thane Municipale Corporation
Reason as filed by the promoterDUE TO COVID 19 AND OTHER PERMISSIONS WE WERE UNABLE TO GET THE APPROVALES ON TIME THE EXTENTION IS FOR THE PURPOSE OF COMPLETING THE PROJECT ALONG WITH THE OCCUPANCY CERTIFICATE ON OR BEFORE 31.12.2023. WE THEREFORE REQUEST THE AUTHORITY TO PLEASE GRANT US THE EXTENSION.
Reason as filed by the promoterThe project has been delayed for two reasons. Initially, we planned to complete it by December 31, 2024. However, we encountered an issue with the parking facility, which caused a setback. Additionally, we have since received approval for the upper floors. Now, we are on the verge of completing the project and are targeting full occupancy certification and closing the project with MahaRERA by December 31, 2025. Therefore, we kindly request an extension until December 31, 2025.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Sep 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 26 Mar 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Sep 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 26 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed102
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2024-2025)File: Form 2A 2024-25_0001.pdf | 24 Mar 2026 |
| Form 2A (FY 2023-2024)File: Form 2A 2024-25 new_0001.pdf | 24 Mar 2026 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A Declaration about Separate Bank Account for Vivek soc_0001_0001.pdf | 28 Apr 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A Declaration about Separate Bank Account for Vivek soc_0001.pdf | 25 Apr 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: rERA bANK eSCROW aCCOUNT_0001.pdf | 25 Apr 2025 |
| Declaration in FORM BFile: Declatration Extention 31DEC.pdf | 22 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 Aril 24 to June 24 compressed (1).pdf | 22 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 July 24 to Sept 24 compressed 3.pdf | 22 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 Oct 24 to Dec 24 compressed 2.pdf | 22 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 Oct 24 to Dec 24_0001_0001.pdf | 22 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: sOLD uNSOLD iNVENTERY_0001.pdf | 22 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24_0001.pdf | 22 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 24_0001.pdf | 6 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 DEC 2024_0001.pdf | 6 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold List.pdf | 29 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Apr 24 to June 24 Arch_0001.pdf | 15 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 24 to Sept 24 Arch_0001.pdf | 15 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Apr 24 to June 24 RCC_0001.pdf | 15 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 July 24 to Sept 24 RCC_0001.pdf | 15 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2a vivek soc 23-24_0001.pdf | 20 Jun 2024 |
| Certificates of CA (Form 3)File: Form 3 vivek soc JAN 24 TO MAR 24_0001.pdf | 20 Jun 2024 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCES_0001.pdf | 28 May 2024 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCES_0001.pdf | 28 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Jan 24 to Mar 24 Arch_0001.pdf | 7 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Jan 24 to Mar 24 RCC_0001.pdf | 7 May 2024 |
| Declaration in FORM BFile: Declaration Form B.pdf | 1 Apr 2024 |
| Layout approvalFile: Sanction Plan 17th Floor.pdf | 26 Mar 2024 |
| Copy of Layout Approval (in case of layout)File: Sanction Plan 17th Floor.pdf | 26 Mar 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC 17th Floor.pdf | 26 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate.pdf | 13 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Vivek soc-compressed.pdf | 30 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2a vivek soc-compressed.pdf | 30 Dec 2023 |
| Certificates of CA (Form 3)File: Form 3 vivek soc-compressed.pdf | 30 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 vivek soc.pdf | 30 Dec 2023 |
| Declaration in FORM BFile: Form-B Declaration-compressed.pdf | 15 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1.pdf | 15 Jun 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 cOMPRESS.pdf | 15 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2 a 19-20.pdf | 15 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2a 20-21.pdf | 15 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2a 21-22.pdf | 15 Jun 2023 |
| Certificates of CA (Form 3)File: Form-3 15-06-23 cOMPRESS.pdf | 15 Jun 2023 |
| Declaration about Commencement CertificateFile: Declaraion about cc.pdf | 10 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 19-20 Engg certificate for quality assurance.pdf | 10 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2020-21 Engineer Certificate for Quality Assurance.pdf | 10 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 21-22 Engineer Certificate for Quality assurance.pdf | 10 May 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold.pdf | 22 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 17-18.pdf | 21 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 18-19.pdf | 21 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19-20.pdf | 21 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf | 21 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf | 21 Apr 2023 |
| Declaration about Commencement CertificateFile: Declaration About Commencement Certificate.pdf | 7 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance certificate 19-20_compressed.pdf | 7 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance certificate 20-21_compressed.pdf | 7 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance certificate 21-22_compressed.pdf | 7 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventary.pdf | 7 Jan 2023 |
| Layout approvalFile: scan 041.pdf | 7 Feb 2022 |
| Layout approvalFile: scan 042.pdf | 7 Feb 2022 |
| Layout approvalFile: scan 043.pdf | 7 Feb 2022 |
| Layout approvalFile: scan 044.pdf | 7 Feb 2022 |
| Layout approvalFile: scan 045.pdf | 7 Feb 2022 |
| Copy of Layout Approval (in case of layout)File: scan 041.pdf | 7 Feb 2022 |
| Copy of Layout Approval (in case of layout)File: scan 042.pdf | 7 Feb 2022 |
| Copy of Layout Approval (in case of layout)File: scan 043.pdf | 7 Feb 2022 |
| Copy of Layout Approval (in case of layout)File: scan 044.pdf | 7 Feb 2022 |
| Copy of Layout Approval (in case of layout)File: scan 045.pdf | 7 Feb 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Cc part 14 Vivek.pdf | 7 Feb 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: percentage 1St page.pdf | 16 Aug 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2nd page percentage.pdf | 16 Aug 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3page percentage.pdf | 16 Aug 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4th page percentage.pdf | 16 Aug 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: CC OF VIVEK.pdf | 26 Jun 2018 |
| OtherFile: Confirmation letter.pdf | 13 Nov 2017 |
| Declaration in FORM BFile: 1.pdf | 26 Oct 2017 |
| Declaration in FORM BFile: 2.pdf | 26 Oct 2017 |
| Declaration in FORM BFile: 3.pdf | 26 Oct 2017 |
| Certificates of CA (Form 3)File: CA 1.pdf | 24 Oct 2017 |
| Certificates of CA (Form 3)File: CA 2.pdf | 24 Oct 2017 |
| Certificates of CA (Form 3)File: CA 3.pdf | 24 Oct 2017 |
| Proforma of Allotment letterFile: Rera Agreement 1 to 7.pdf | 24 Oct 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 102 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep THE VIVEK FLAT OWNERS CHS LTD on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NAUPADA7,600+ in Thane
Filed coordinates, straight-line distance. 323 registered projects within 2 km.
Stellar
Trimity Realty LLP
SAMRIN HERITAGE
SAMRIN INFRA PRIVATE LIMITED
L&T Realty Vayam Tower 3
ELANTE PROPERTIES PRIVATE LIMITED, J S K E
L&T Realty Vayam Tower 4
ELANTE PROPERTIES PRIVATE LIMITED, J S K E
Codename LIT Tower A
Camrose Realtors Private Limited
Codename LIT Tower B
Camrose Realtors Private Limited
See every Thane project, with the district possession charts
Builder: YASH ASHOKA
YASH ASHOKA has 2 registrations on MahaRERA, including THE VIVEK FLAT OWNERS CHS LTD and Veer Square (Thane). Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that THE VIVEK FLAT OWNERS CHS LTD shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if THE VIVEK FLAT OWNERS CHS LTD is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of THE VIVEK FLAT OWNERS CHS LTD?
The registered promoter entity is YASH ASHOKA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in THE VIVEK FLAT OWNERS CHS LTD?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for THE VIVEK FLAT OWNERS CHS LTD?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at THE VIVEK FLAT OWNERS CHS LTD?
The professionals named in the filing: Architect: Ar Godbole Mukadam & Associates; Engineer: Anant Sawant; Chartered Accountant: ANIL BABU SHETTY; Chartered Accountant: RAHUL N GHARAT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in THE VIVEK FLAT OWNERS CHS LTD?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback