THE VIBE

By GAGAN TITANIUM SPACES LLP

RG-MH-90078 · RERA P52100019109 · Last updated on MahaRERA portal: 17 Apr 2025

Source: official MahaRERA filing

Red flags

  • 13 complaints at MahaRERA
  • Completion date moved by 58 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2029Possession promisedmoved 58 months from the original
3 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 8%
13Complaints at MahaRERAon this registration
Jump to the 42 documents Report an error

THE VIBE is a Commercial project by GAGAN TITANIUM SPACES LLP in Pune, Maharashtra, registered with MahaRERA as P52100019109 on 4 Jan 2019. Possession is promised by 30 Sep 2029. The completion date has moved by 58 months from the original filing. 13 complaints are on record with the regulator.

At a glance

Project

  • NameTHE VIBE
  • TypeCommercial
  • Location
    • South main Road
    • Koregaon Park
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411001
  • Pincode411001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100019109
  • ReraGenie IDRG-MH-90078

Builder

  • NameGAGAN TITANIUM SPACES LLP
  • Entity typePartnership
  • Declared earlier projects2 →

Key dates

this monthRegisteredJan 2019First promiseNov 2024Revised toSep 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Jan 2019
  • Promised completion30 Sep 2029
  • Revised completionRevised to 30 Sep 2029 (originally 29 Nov 2024)
  • Buildings2 building records
  • Documents filed42 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
THE VIBE- FLOOR LG TO 3NA100000
THE VIBE- PROPOSED FLOOR 4 TO 7NA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 17 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 8%.

THE VIBE- FLOOR LG TO 328%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure8%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
THE VIBE- PROPOSED FLOOR 4 TO 70%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed377

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots377
Closed/Covered377

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,716 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
SURAKSHA HOUSING & FINANCE LLPPune (M Corp.)Pune

Approvals and building plan

Permissible FSI8545.9
Proposed, not sanctioned4,181 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchStation road, Chinchwad, Pune

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSunil Chinchwade & Associates
PartnerRole in project
GAGAN TITANIUM SPACES LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100028229Nov 2024 → Sep 2029

Reason as filed by the promoterDisruption in Supply Chain and Delay in Procurement of Construction Materials: One of the primary causes of delay has been the disruption in the supply chain of essential construction materials such as cement, steel, sand, aggregates, plumbing components, electrical fittings, and finishing materials. The post-pandemic global and domestic logistical constraints have caused a considerable increase in lead times for procurement. Additionally, local market shortages and continuous price volatility of these key materials have further compounded the issue, leading to intermittent halts in constructi

Complaints filed with MahaRERA13

Case no.ComplainantRespondentFiled
CC005000000471258Prashant Subhash SutarGagan Titanium Spaces LLP12/07/2024
CC12500323Suraksha Housing and Finance LLPGAGAN TITANIUM SPACES LLP29/01/2025
CC12503071Usha Laxminarayan AgarwalGAGAN TITANIUM SPACES LLP01/09/2025
CC12601167Shyam Vipin SanghaviGAGAN TITANIUM SPACES LLP03/03/2026
CC12601168Shyam Vipin SanghaviGAGAN TITANIUM SPACES LLP03/03/2026
CC12603709Habiba Sajjadhussain GabraniGAGAN TITANIUM SPACES LLP16/06/2026
CC12603710Habiba Sajjadhussain GabraniGAGAN TITANIUM SPACES LLP16/06/2026
CC12603717SAJJADHUSSAIN GULAMHUSAIN GABRANIGAGAN TITANIUM SPACES LLP16/06/2026
CC12603801Kapko InternationalGAGAN TITANIUM SPACES LLP19/06/2026
CC12603802Kapko InternationalGAGAN TITANIUM SPACES LLP19/06/2026
CC12603803Kapko InternationalGAGAN TITANIUM SPACES LLP19/06/2026
CC12603804Kapko InternationalGAGAN TITANIUM SPACES LLP19/06/2026
CC12603959Manav AhluwaliaGAGAN TITANIUM SPACES LLP26/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Nov 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2029

Documents filed42

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: Plan 1-4.pdf17 Apr 2025
Building plan approvalFile: Plan 2-4.pdf17 Apr 2025
Building plan approvalFile: Plan 3-4.pdf17 Apr 2025
Building plan approvalFile: Plan 4-4.pdf17 Apr 2025
Copy of Layout Approval (in case of layout)File: Plan 1-4.pdf17 Apr 2025
Declaration in FORM BFile: Form B The Vibe.pdf17 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: CC-3491-23 Date - 28-03-2024.pdf17 Apr 2025
Building Plan Approval (IOD)File: Plan 2-4.pdf17 Apr 2025
Building Plan Approval (IOD)File: Plan 3-4.pdf17 Apr 2025
Building Plan Approval (IOD)File: Plan 4-4.pdf17 Apr 2025
Details of encumbrances concerned to FinanceFile: Legal Encumbrance.pdf1 Mar 2025
Details of encumbrances concerned to FinanceFile: Finanacial encumbrance.pdf1 Mar 2025
Details of encumbrances concerned to LegalFile: Legal Encumbrance.pdf1 Mar 2025
Details of encumbrances concerned to LegalFile: Finanacial encumbrance.pdf1 Mar 2025
Proforma of Agreement for saleFile: 2 Proforma of Allotment letter.pdf28 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: The Vibe Arch certificate 24012023.pdf30 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: The Vibe Engg certificate 24012023.pdf30 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: The Vibe Arch certificate 26032021.pdf14 Apr 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: The Vibe Arch certificate 14012021.pdf21 Jan 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: The Vibe Arch certificate 07102020.pdf11 Nov 2020
Building plan approvalFile: The Vibe Revised Plan.pdf6 Oct 2020
Building Plan Approval (IOD)File: The Vibe Revised Plan.pdf6 Oct 2020
Commencement Certificates / NA Order for plotted developmentFile: CC-4-8-2019.pdf6 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: The Vibe Arch certificate 18032020.pdf1 Jul 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: The Vibe Form 5 18-19.pdf30 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: The Vibe Ach Certificate 18122019.pdf25 Dec 2019
Form 2AFile: Vibe Quality Assurance Certificate 0212019.pdf9 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: The Vibe Arch Certificate 24062019.pdf27 Jun 2019
Proforma of Allotment letterFile: The Vibe Agreement 17062019.pdf17 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Vibe Architect certificate 27042019.pdf29 Apr 2019
Form 2AFile: Vibe Quality Assurance Certificate 09012018.pdf9 Jan 2019
Certificates of CA (Form 3)File: CA Certificate.pdf4 Dec 2018
Copy of the legal title reportFile: Rajiv Patel Search Title Certificate.pdf27 Nov 2018
Details of encumbrancesFile: No Encumbrance Certificate.pdf27 Nov 2018
Declaration in FORM BFile: Form B Titanium.pdf26 Nov 2018
Proforma of Allotment letterFile: Flat Purchaser Declaration.pdf26 Nov 2018
Building plan approvalFile: Vibe Building Sanction.pdf21 Nov 2018
Layout approvalFile: Vibe Layout Sanction.pdf21 Nov 2018
PAN CardFile: GTSLLP - PAN.pdf21 Nov 2018
Copy of Layout Approval (in case of layout)File: Vibe Layout Sanction.pdf21 Nov 2018
Building Plan Approval (IOD)File: Vibe Building Sanction.pdf21 Nov 2018
Commencement Certificates / NA Order for plotted developmentFile: cc.pdf20 Nov 2018

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationRegisteredStatusPromisedDelivered
GAGAN LAWISH PHASE 2P52100001283Pisoli, PuneJul 2017CompletedDec 2020Registered original: Jun 2019Late, Apr 2021
GAGAN AKANKSHA PHASE 1p52100001285GAT NO 524, Koregaon Mul, Koregaon mul, Koregaon Mul, Haveli, Pune, 411202, MAHARASHTRA-CompletedDec 2019Jan 2019

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 58 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THE VIBE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Koregaon Park13,700+ in Pune

2 kmTHE VIBECompleted 21Lapsed / revoked 10Other 35Dot size: filed unitsN

Filed coordinates, straight-line distance. 66 registered projects within 2 km.

Builder: GAGAN TITANIUM SPACES LLP

GAGAN TITANIUM SPACES LLP has 1 registration on MahaRERA, including THE VIBE. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if THE VIBE is delayed beyond 30 Sep 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE VIBE?

The registered promoter entity is GAGAN TITANIUM SPACES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE VIBE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against THE VIBE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for THE VIBE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE VIBE?

The professionals named in the filing: Architect: Sunil Chinchwade & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE VIBE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE VIBE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE VIBE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.