Home / Browse projects / THE SERAI PHASE - 1

Registration lapsed No litigation declared Others project

THE SERAI PHASE - 1

By KATHAWALA REALTORS LLP

RG-MH-86336 · RERA P51900007804 · Last updated on MahaRERA portal: 22 Mar 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date
  • 2 complaints at MahaRERA
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2024Possession promised22 months past this date
0 of 11Construction stages donefurthest along: Excavation, 60%
2Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

THE SERAI PHASE - 1 is a Others project by KATHAWALA REALTORS LLP in 400008, registered with MahaRERA as P51900007804 on 18 Aug 2017. Possession was promised by 29 Dec 2024 and is now 22 months past that date. The completion date has moved by 18 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameTHE SERAI PHASE - 1
  • TypeOthers
  • Location
    • 400008
  • Pincode400008
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900007804
  • ReraGenie IDRG-MH-86336

Builder

  • NameKATHAWALA REALTORS LLP
  • Entity typePartnership
  • PartnersZUZAR AHMEDALLY KATHAWALA, HASHIM HATIM KATHAWALA

Key dates

22 months past promisethis monthRegisteredAug 2017First promiseJun 2023Revised toDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on18 Aug 2017
  • Promised completion29 Dec 2024
  • Revised completionRevised to 29 Dec 2024 (originally 30 Jun 2023)
  • Buildings1 building record
  • Documents filed77 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
The Serai Phase-1NA280000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Mar 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 60%.

The Serai Phase-1: 13% average across the applicable activities

ActivityProgress
Excavation60%
Basement (if any)40%
Podiums (if any)0%
Plinth40%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities19

As on 22 Mar 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes5%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
Herb GardenYes0%
Fitness CentreYes0%
Children Play GroundYes0%
Banquet RoomYes0%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,990 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI19600.89
Proposed, not sanctioned19,158 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMANDVI , MAHAVIR DARSHAN BLDG NARSI NATHA STREET , MUM 09

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAAKAR ARCHITECTS AND CONSULTANTS
EngineerMAHIMTURA CONSULTANTS PVT LTD
PartnerRole in project
KATHAWALA REALTORS LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900009294Jun 2023 → Jun 2024

Reason as filed by the promoterDue to Covid - 19 pandemic, the construction pace and the sales of the projects has been hampered. Seeing the current scenario, we feel the need to extend the timeline previously mentioned by one year. The previously mentioned date was 30th June 2023. Now, we hereby request you you to kindly extend the project timeline to 29th June 2024. Also, we request you to kindly generate the new certificate with revised timeline.

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000591596Masud ShaikhKathawala Realtors LLP20/08/2024
CC12400771Shabnam Saleh Mohammed MerchantKATHAWALA REALTORS LLP14/11/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Feb 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 5)File: Form 5 - The Serai Phase 1 for FY 2017-18.pdf22 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 - The Serai Phase 1 for FY 2018-19.pdf22 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - The Serai Phase 1 for FY 2019-20.pdf22 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - The Serai Phase 1 for FY 2020-21.pdf22 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - The Serai Phase 1 for FY 2021-22.pdf22 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - The Serai Phase 1 for FY 2022-23.pdf22 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 1 Certificates of CA (Form 5).pdf14 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 The Serai Phase -I as on September 2022.pdf27 Oct 2022
Certificates of CA (Form 3)File: Form 3 as on September 2022.pdf27 Oct 2022
Certificates of CA (Form 3)File: Form 3 as on September 2022.pdf27 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: The Serai Phase-1 FY 2021-22.pdf1 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: The Serai Phase 1 - Form 2 - June 2022.pdf25 Jul 2022
Certificates of CA (Form 3)File: Form 3 Serai Phase 1 June 22.pdf25 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: The Serai Phase 1 - Form 2 - 31_03_2022.pdf10 May 2022
CERSAI detailsFile: The Serai.pdf10 May 2022
Certificates of CA (Form 3)File: Form 3 Serai Phase 1 31st March 2022.pdf10 May 2022
Layout approvalFile: The Serai Plan Page 1 of 1.pdf18 Feb 2022
Building plan approvalFile: plan page 1A, 2 and 3.pdf18 Feb 2022
Building plan approvalFile: plan the serai phase 3A and 4.pdf18 Feb 2022
Building plan approvalFile: plan the serai phase page 5.pdf18 Feb 2022
Building plan approvalFile: plan the serai phase 6_compressed.pdf18 Feb 2022
Building plan approvalFile: plan the serai phase 7 and 8.pdf18 Feb 2022
Building plan approvalFile: the serai page 9 and 10.pdf18 Feb 2022
Building plan approvalFile: the serai page 11 and 12.pdf18 Feb 2022
Building plan approvalFile: the serai 13 and 14.pdf18 Feb 2022
Copy of Layout Approval (in case of layout)File: The Serai Plan Page 1 of 1.pdf18 Feb 2022
Building Plan Approval (IOD)File: plan page 1A, 2 and 3.pdf18 Feb 2022
Building Plan Approval (IOD)File: plan the serai phase 3A and 4.pdf18 Feb 2022
Building Plan Approval (IOD)File: plan the serai phase page 5.pdf18 Feb 2022
Building Plan Approval (IOD)File: plan the serai phase 6_compressed.pdf18 Feb 2022
Building Plan Approval (IOD)File: plan the serai phase 7 and 8.pdf18 Feb 2022
Building Plan Approval (IOD)File: the serai page 9 and 10.pdf18 Feb 2022
Building Plan Approval (IOD)File: the serai page 11 and 12.pdf18 Feb 2022
Building Plan Approval (IOD)File: the serai 13 and 14.pdf18 Feb 2022
Commencement Certificates / NA Order for plotted developmentFile: 2307922Amendletter_signed (1).pdf18 Feb 2022
Declaration about Commencement CertificateFile: form d (1).pdf18 Feb 2022
Commencement Certificates / NA Order for plotted developmentFile: CC REVALIDATION DEC-22.pdf15 Feb 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 The Serai Phase 1 Dec 2021.pdf25 Jan 2022
Certificates of CA (Form 3)File: Form 3 Certificate 254.pdf25 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 The Serai Pase I Sept 2021.pdf30 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 20-21 The Serai Phase-1.pdf30 Oct 2021
Certificates of CA (Form 3)File: Form 3 Certificate 206.pdf27 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: Further Cc.pdf2 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Document 36_compressed.pdf2 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ilovepdf_merged (28)_compressed.pdf12 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 The Serai Phase-1 Mar 2021.pdf5 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 The Serai Phase-1 Jun 2021.pdf5 Aug 2021
Certificates of CA (Form 3)File: Form 3 The Serai Phase-1 Mar 2021.pdf5 Aug 2021
Certificates of CA (Form 3)File: Form 3 The Serai Phase-1 Jun 2021.pdf5 Aug 2021
Certificates of CA (Form 3)File: Form 3 Dec 2020 The Serai Phase-I.pdf22 Feb 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KATHWALA FORM 2 SEPT 2020.pdf4 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KATHWALA FORM 2 JUNE 2020.pdf4 Nov 2020
Certificates of CA (Form 3)File: Form 3 The Serai Phase-1 June 2020.pdf4 Nov 2020
Certificates of CA (Form 3)File: Form 3 The Serai Phase-1 September 2020.pdf4 Nov 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 The Serai Phase-1 FY 2019-20.pdf4 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31st Mar 2020-The Serai Phase-I.pdf13 Aug 2020
Certificates of CA (Form 3)File: Form 3 31st March 2020 - The Serai Phase-I.pdf13 Aug 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form -2 The Serai Phase 1.pdf22 Jan 2020
Certificates of CA (Form 3)File: Form 3 The Serai Phase-I.pdf22 Jan 2020
Certificates of CA (Form 5)File: Audit 18-19.pdf29 May 2019
Layout approvalFile: Plan_Layout.pdf12 Aug 2017
Building plan approvalFile: IOD min.pdf12 Aug 2017
PAN CardFile: PAN_new.pdf12 Aug 2017
Copy of the legal title reportFile: Title_Certificate.pdf12 Aug 2017
Details of encumbrancesFile: encumbrance letter.pdf12 Aug 2017
Copy of Layout Approval (in case of layout)File: Plan_Layout.pdf12 Aug 2017
Building Plan Approval (IOD)File: IOD min.pdf12 Aug 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf12 Aug 2017
Commencement Certificates / NA Order for plotted developmentFile: cc revalidation letter.pdf12 Aug 2017
Declaration in FORM BFile: Form B.pdf12 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate-1-2 COMP.pdf12 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate-3-3.pdf12 Aug 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate-new.pdf12 Aug 2017
Certificates of CA (Form 3)File: CA CERTIFICATE KATHAWALA 1 4.pdf12 Aug 2017
Certificates of CA (Form 3)File: CA CERTIFICATE KATHAWALA compressed.pdf12 Aug 2017
Proforma of Allotment letterFile: Kathawala Draft Agrement rera.pdf12 Aug 2017
Proforma of Allotment letterFile: Draft Kathawala Allotment.pdf12 Aug 2017

Keep THE SERAI PHASE - 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near this project

2 kmTHE SERAI PHASE - 1Completed 12Lapsed / revoked 18Other 29Dot size: filed unitsN

Filed coordinates, straight-line distance. 59 registered projects within 2 km.

Builder: KATHAWALA REALTORS LLP

KATHAWALA REALTORS LLP has 1 registration on MahaRERA, including THE SERAI PHASE - 1. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What does it mean that THE SERAI PHASE - 1 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if THE SERAI PHASE - 1 is delayed beyond 29 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE SERAI PHASE - 1?

The registered promoter entity is KATHAWALA REALTORS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE SERAI PHASE - 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against THE SERAI PHASE - 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for THE SERAI PHASE - 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE SERAI PHASE - 1?

The professionals named in the filing: Architect: AAKAR ARCHITECTS AND CONSULTANTS; Engineer: MAHIMTURA CONSULTANTS PVT LTD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE SERAI PHASE - 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE SERAI PHASE - 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE SERAI PHASE - 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.