Home / Browse projects / Pune, Maharashtra / THE RIDGES 41

Registered No litigation declared Residential / Group Housing project

THE RIDGES 41

By Aurigaa Realtors

RG-MH-96606 · RERA P52100055581 · Last updated on MahaRERA portal: 18 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
11 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 54%
374 of 628Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 185 documents Report an error

THE RIDGES 41 is a Residential / Group Housing project by Aurigaa Realtors in Pune, Maharashtra, registered with MahaRERA as P52100055581 on 4 Apr 2024. Possession is promised by 20 Dec 2029. 254 of the 628 units on this registration are recorded sold or booked, and 11 of 33 construction stages are filed complete.

At a glance

Project

  • NameTHE RIDGES 41
  • TypeResidential / Group Housing
  • Location
    • BLUE RIDGE
    • BLUE RIDGE TOWNSHIP
    • Hinjavadi (CT)
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100055581
  • ReraGenie IDRG-MH-96606

Builder

  • NameAurigaa Realtors
  • Entity typePartnership
  • PartnerHaresh Premchand Chandwani
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredApr 2024PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Apr 2024
  • Promised completion20 Dec 2029
  • Revised completionNone
  • Buildings3 building records
  • Documents filed185 files

Current status

40%254 of 628 units booked
46.3%Work done, per cost certificate

Figures as on 18 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER 27 A BUILDINGNA41352100210
TOWER 28 B BUILDINGNA41352100210
TOWER 29 C BUILDINGNA41352080208

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 18 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 54%.

TOWER 27 A BUILDING62%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure54%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks54%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
TOWER 28 B BUILDING62%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure54%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks54%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
TOWER 29 C BUILDING9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes10%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed34

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots34
Open Space34

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area9,255 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on31 Jul 2025

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI63669.02
Proposed, not sanctioned63,669 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNAGRAS TOWER, BUILDING A SHOP NO 2 S NO 162 4A 5A NAGRAS ROAD AUNDH PUNE 411007 MAHARASHTRA
Estimated costRs 264.00 cr
Cost incurredRs 122.16 cr
Work done46.27%
BuildingWingEstimatedIncurred
TOWER 27 A BUILDINGNARs 73.07 crRs 55.44 cr
TOWER 28 B BUILDINGNARs 73.07 crRs 55.44 cr
TOWER 29 C BUILDINGNARs 73.07 crRs 11.29 cr
-NARs 44.80 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAMIT KEMBHAVI
EngineerROHINEE KAILAS BADGUJAR
EngineerKAILASH PANDIT BADGUJAR
Chartered AccountantAZIM MULANI
Chartered AccountantRINKESH GUPTA & ASSOCIATES
Chartered AccountantAZAM MULANI
PartnerRole in project
Aurigaa Realtors-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 20 Dec 2029

Documents filed185

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 185 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: RIDGE 41 FORM 1.pdf18 Apr 2026
Withdrawal Update Form 2File: RIDGE 41 FORM 2.pdf18 Apr 2026
Withdrawal Update Form 3File: ridge 41 ca certificate 15-4-2026.pdf18 Apr 2026
Withdrawal Update Form 1File: RIDGE 41 FORM 1 OCT TO DEC-25.pdf13 Jan 2026
Withdrawal Update Form 2File: RIDGE 41 FORM 2 OCT TO DEC-25.pdf13 Jan 2026
Withdrawal Update Form 3File: RIDGE 41 FORM 3 OCT TO DEC-25.pdf13 Jan 2026
Withdrawal Update Form 1File: RIDGE 41 FORM 1 OCT TO DEC-25.pdf12 Jan 2026
Withdrawal Update Form 1File: RIDGE 41 FORM 1 OCT TO DEC-25.pdf12 Jan 2026
Withdrawal Update Form 1File: RIDGE 41 FORM 1 OCT TO DEC-25.pdf12 Jan 2026
Withdrawal Update Form 2File: RIDGE 41 FORM 2 OCT TO DEC-25.pdf12 Jan 2026
Withdrawal Update Form 2File: RIDGE 41 FORM 2 OCT TO DEC-25.pdf12 Jan 2026
Withdrawal Update Form 2File: RIDGE 41 FORM 2 OCT TO DEC-25.pdf12 Jan 2026
Withdrawal Update Form 3File: RIDGE 41 FORM 3 OCT TO DEC-25.pdf12 Jan 2026
Withdrawal Update Form 3File: RIDGE 41 FORM 3 OCT TO DEC-25.pdf12 Jan 2026
Withdrawal Update Form 3File: RIDGE 41 FORM 3 OCT TO DEC-25.pdf12 Jan 2026
Withdrawal Update Form 1File: ridge 41 form 1.pdf28 Oct 2025
Withdrawal Update Form 1File: ridge 41 form 1.pdf28 Oct 2025
Withdrawal Update Form 2File: ridge 41 form 2.pdf28 Oct 2025
Withdrawal Update Form 2File: ridge 41 form 2.pdf28 Oct 2025
Withdrawal Update Form 3File: ridge 41 form 3.pdf28 Oct 2025
Withdrawal Update Form 3File: ridge 41 form 3.pdf28 Oct 2025
Withdrawal Update Form 1File: ridge 41 form 1.pdf27 Oct 2025
Withdrawal Update Form 1File: ridge 41 form 1.pdf27 Oct 2025
Withdrawal Update Form 1File: ridge 41 form 1.pdf27 Oct 2025
Withdrawal Update Form 1File: ridge 41 form 1.pdf27 Oct 2025
Withdrawal Update Form 2File: ridge 41 form 2.pdf27 Oct 2025
Withdrawal Update Form 2File: ridge 41 form 2.pdf27 Oct 2025
Withdrawal Update Form 2File: ridge 41 form 2.pdf27 Oct 2025
Withdrawal Update Form 2File: ridge 41 form 2.pdf27 Oct 2025
Withdrawal Update Form 3File: ridge 41 form 3.pdf27 Oct 2025
Withdrawal Update Form 3File: ridge 41 form 3.pdf27 Oct 2025
Withdrawal Update Form 3File: ridge 41 form 3.pdf27 Oct 2025
Withdrawal Update Form 3File: ridge 41 form 3.pdf27 Oct 2025
Withdrawal Update Form 1File: ridge 41 form 1.pdf25 Oct 2025
Withdrawal Update Form 1File: ridge 41 form 1.pdf25 Oct 2025
Withdrawal Update Form 2File: ridge 41 form 2.pdf25 Oct 2025
Withdrawal Update Form 2File: ridge 41 form 2.pdf25 Oct 2025
Withdrawal Update Form 3File: ridge 41 form 3.pdf25 Oct 2025
Withdrawal Update Form 3File: ridge 41 form 3.pdf25 Oct 2025
Withdrawal Update Form 1File: ridge 41 form 1.pdf24 Oct 2025
Withdrawal Update Form 1File: ridge 41 form 1.pdf24 Oct 2025
Withdrawal Update Form 1File: ridge 41 form 1.pdf24 Oct 2025
Withdrawal Update Form 1File: ridge 41 form 1.pdf24 Oct 2025
Withdrawal Update Form 2File: ridge 41 form 2.pdf24 Oct 2025
Withdrawal Update Form 2File: ridge 41 form 2.pdf24 Oct 2025
Withdrawal Update Form 2File: ridge 41 form 2.pdf24 Oct 2025
Withdrawal Update Form 2File: ridge 41 form 2.pdf24 Oct 2025
Withdrawal Update Form 3File: ridge 41 form 3.pdf24 Oct 2025
Withdrawal Update Form 3File: ridge 41 form 3.pdf24 Oct 2025
Withdrawal Update Form 3File: ridge 41 form 3.pdf24 Oct 2025
Withdrawal Update Form 3File: ridge 41 form 3.pdf24 Oct 2025
Withdrawal Update Form 1File: ridge 41 form 1.pdf20 Oct 2025
Withdrawal Update Form 1File: ridge 41 form 1.pdf20 Oct 2025
Withdrawal Update Form 1File: ridge 41 form 1.pdf20 Oct 2025
Withdrawal Update Form 2File: ridge 41 form 2.pdf20 Oct 2025
Withdrawal Update Form 2File: ridge 41 form 2.pdf20 Oct 2025
Withdrawal Update Form 2File: ridge 41 form 2.pdf20 Oct 2025
Withdrawal Update Form 3File: ridge 41 form 3.pdf20 Oct 2025
Withdrawal Update Form 3File: ridge 41 form 3.pdf20 Oct 2025
Withdrawal Update Form 3File: ridge 41 form 3.pdf20 Oct 2025
Withdrawal Update Form 1File: ridge 41 form 1.pdf19 Oct 2025
Withdrawal Update Form 1File: ridge 41 form 1.pdf19 Oct 2025
Withdrawal Update Form 1File: ridge 41 form 1.pdf19 Oct 2025
Withdrawal Update Form 1File: ridge 41 form 1.pdf19 Oct 2025
Withdrawal Update Form 2File: ridge 41 form 2.pdf19 Oct 2025
Withdrawal Update Form 2File: ridge 41 form 2.pdf19 Oct 2025
Withdrawal Update Form 2File: ridge 41 form 2.pdf19 Oct 2025
Withdrawal Update Form 2File: ridge 41 form 2.pdf19 Oct 2025
Withdrawal Update Form 3File: ridge 41 form 3.pdf19 Oct 2025
Withdrawal Update Form 3File: ridge 41 form 3.pdf19 Oct 2025
Withdrawal Update Form 3File: ridge 41 form 3.pdf19 Oct 2025
Withdrawal Update Form 3File: ridge 41 form 3.pdf19 Oct 2025
Withdrawal Update Form 1File: ridge 41 form 1.pdf18 Oct 2025
Withdrawal Update Form 1File: ridge 41 form 1.pdf18 Oct 2025
Withdrawal Update Form 1File: ridge 41 form 1.pdf18 Oct 2025
Withdrawal Update Form 1File: ridge 41 form 1.pdf18 Oct 2025
Withdrawal Update Form 1File: ridge 41 form 1.pdf18 Oct 2025
Withdrawal Update Form 2File: ridge 41 form 2.pdf18 Oct 2025
Withdrawal Update Form 2File: ridge 41 form 2.pdf18 Oct 2025
Withdrawal Update Form 2File: ridge 41 form 2.pdf18 Oct 2025

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
AriseGaikwad Nagar Punawale402CompletedDec 2022Dec 2021

How this compares with Pune

40%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THE RIDGES 41 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BLUE RIDGE TOWNSHIP13,700+ in Pune

2 kmTHE RIDGES 41Completed 31Lapsed / revoked 17Other 43Dot size: filed unitsN

Filed coordinates, straight-line distance. 91 registered projects within 2 km.

Builder: Aurigaa Realtors

AURIGAA REALTORS has 5 registrations on MahaRERA, including ICON COMMERCIALJ4PART and MIRAI PHASE-I. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if THE RIDGES 41 is delayed beyond 20 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE RIDGES 41?

The registered promoter entity is Aurigaa Realtors, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE RIDGES 41?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE RIDGES 41?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE RIDGES 41?

The professionals named in the filing: Architect: AMIT KEMBHAVI; Engineer: ROHINEE KAILAS BADGUJAR; Engineer: KAILASH PANDIT BADGUJAR; Chartered Accountant: AZIM MULANI; Chartered Accountant: RINKESH GUPTA & ASSOCIATES; Chartered Accountant: AZAM MULANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE RIDGES 41?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE RIDGES 41. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE RIDGES 41 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.