Completed No litigation declared Residential / Group Housing project

THE PYRAMID ONE

By PYRAMID DEVELOPERS

RG-MH-06818 · RERA P51700053152 · Last updated on MahaRERA portal: 3 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Sep 2026Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Basement (if any), 0%
3 of 32Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

THE PYRAMID ONE is a Residential / Group Housing project by PYRAMID DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700053152 on 17 Oct 2023. The registration is recorded completed; possession was promised by 30 Sep 2026. 29 of the 32 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameTHE PYRAMID ONE
  • TypeResidential / Group Housing
  • Location
    • KALYAN
    • Chikanghar
    • Thane
    • 421301
  • Pincode421301
  • RERA no.P51700053152
  • ReraGenie IDRG-MH-06818

Builder

  • NamePYRAMID DEVELOPERS
  • Entity typePartnership
  • PartnersHASMUKH AMRITLAL SHANKLESHA, SAHIBSINGH JAGDEEPSINGH HAYER
  • Other registrations6 more →
  • Completed4 of 7
  • No longer live1 lapsed, de-registered or revoked
  • Past their filed date1

Key dates

this monthRegisteredOct 2023PromisedSep 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on17 Oct 2023
  • Promised completion30 Sep 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed73 files

Current status

91%29 of 32 units booked
100.0%Work done, per cost certificate

Figures as on 3 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
THE PYRAMID ONENA8832032

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

THE PYRAMID ONE: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 3 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area608 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityADTP, KALYAN DOMBIVALI MUNICIPAL CORPORATION, KALYAN
Permissible FSI1814.24
Proposed, not sanctioned1,814 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMURBAD ROAD, KALYAN WEST
Estimated costRs 6.50 cr
Cost incurredRs 6.50 cr
Work done100.0%
BuildingWingEstimatedIncurred
THE PYRAMID ONENARs 5.85 crRs 5.85 cr
-NARs 65.05 lakhRs 65.05 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVITAN CONSULTANTS NIRGUDE
EngineerAARNA STRUCTURAL CONSULTANTS CHAUDARI
Chartered AccountantANKIT PARAS JAIN & CO
Chartered AccountantMAYUR K JAIN & CO
PartnerRole in project
PYRAMID DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Occupancy Certificate.pdf3 Apr 2026
Withdrawal Update Form 1File: FORM 1 31-12-25.pdf28 Mar 2026
Withdrawal Update Form 1File: Form-1.pdf28 Mar 2026
Withdrawal Update Form 2File: FORM 2 31-12-25.pdf28 Mar 2026
Withdrawal Update Form 2File: Form-2.pdf28 Mar 2026
Withdrawal Update Form 3File: FORM 3 31-12-25.pdf28 Mar 2026
Withdrawal Update Form 3File: Form-3.pdf28 Mar 2026
Form 1File: Form 1.pdf26 Dec 2025
Form 2File: Form 2.pdf26 Dec 2025
Form 3File: Form-3.pdf26 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory List.pdf26 Dec 2025
Form 5 (FY 2024-2025)File: Form-5 FY 2024-25 Signed.pdf30 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sign Form 3 Q4.pdf30 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-03-2025.pdf24 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 31-03-2025.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 31-12-2024 Sign.pdf5 Feb 2025
Disclosure of sold/ booked inventoryFile: Revised Sold Unsold List 31-12-2024.pdf5 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 q3.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3.pdf25 Jan 2025
Disclosure of sold/ booked inventoryFile: Q3.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 30-06-2024_compressed.pdf21 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 30-09-2024 Sign Copy_compressed.pdf21 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-09-2024.pdf21 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold and Unsold data 30-06-2024.pdf21 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Data 30-09-2024.pdf21 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 30-09-2024 Sign Copy_compressed.pdf21 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 30-06-2024_compressed.pdf21 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-09-2024.pdf21 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold and Unsold data 30-06-2024.pdf21 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Data 30-09-2024.pdf21 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_compressed Final.pdf13 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30-06-2024.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3.pdf12 Aug 2024
Building plan approvalFile: Plan.pdf31 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan.pdf31 May 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf31 May 2024
Declaration about Commencement CertificateFile: Revised Format D.pdf31 May 2024
Proforma of Agreement for saleFile: RERA AGREEMENT PYRAMID Final Draft 27-2-2023.pdf31 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Pyramid Developers_0001.pdf17 May 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold List 31-03-2024.pdf30 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 31-12-2023.pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 31-03-2024.pdf22 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 31-12-2023.pdf22 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 31-03-2024.pdf22 Apr 2024
Disclosure of sold/ booked inventoryFile: IMG.pdf22 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 23_compressed.pdf22 Jan 2024
Details of encumbrances concerned to FinanceFile: Final_Financial encrumbance.pdf11 Oct 2023
Details of encumbrances concerned to LegalFile: Final_Financial encrumbance.pdf11 Oct 2023
Declaration in FORM BFile: form b colour_0001_compressed.pdf11 Oct 2023
Proforma of Agreement for saleFile: Agreement for Sale Revised.pdf4 Oct 2023
Deviation Report with respect to model copy of AgreementFile: No Deviation_Revised.pdf4 Oct 2023
Layout approvalFile: SANCTIONED PLAN.pdf3 Oct 2023
Building plan approvalFile: SANCTIONED PLAN.pdf3 Oct 2023
PAN CardFile: Pyramid Developers Pancard .pdf3 Oct 2023
Copy of the legal title reportFile: Legal Title report_0001.pdf3 Oct 2023
Copy of the legal title reportFile: Flow of the title report_0001.pdf3 Oct 2023
Details of encumbrances concerned to FinanceFile: Declaration For Legal Encumbrances_0001.pdf3 Oct 2023
Details of encumbrances concerned to LegalFile: Declaration For Legal Encumbrances_0001.pdf3 Oct 2023
Copy of Layout Approval (in case of layout)File: SANCTIONED PLAN.pdf3 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: SANCTIONED PLAN.pdf3 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf3 Oct 2023
Declaration about Commencement CertificateFile: FORM D Format.pdf3 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate_0001.pdf3 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_0001.pdf3 Oct 2023
CERSAI detailsFile: CERSAI_Search_Report_200282443292_For_Asset_Based_Search_03_10_2023_19_53_53_998.pdf3 Oct 2023
CERSAI detailsFile: Declaration For No Cersai Report_0001.pdf3 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_0001_compressed.pdf3 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Sahibsingh Jagdeepsingh Hayer_0001.pdf3 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Hasmukhlal Amritlal Shanklesha_0001.pdf3 Oct 2023
Proforma of Allotment letterFile: Allotment Letter-On Letter Head_0001.pdf3 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format-A_0001.pdf3 Oct 2023
Deviation Report with respect to Allotment letterFile: Deviation With Respected To Allotment Letter_0001.pdf3 Oct 2023

How this compares with Thane

91%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THE PYRAMID ONE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KALYAN7,600+ in Thane

Builder: PYRAMID DEVELOPERS

Pyramid Developers has 7 registrations on MahaRERA, including The Nook Phase 1 and 81 AUREATE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if THE PYRAMID ONE is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE PYRAMID ONE?

The registered promoter entity is PYRAMID DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE PYRAMID ONE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE PYRAMID ONE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE PYRAMID ONE?

The professionals named in the filing: Architect: VITAN CONSULTANTS NIRGUDE; Engineer: AARNA STRUCTURAL CONSULTANTS CHAUDARI; Chartered Accountant: ANKIT PARAS JAIN & CO; Chartered Accountant: MAYUR K JAIN & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE PYRAMID ONE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE PYRAMID ONE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE PYRAMID ONE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.