Home / Browse projects / Pune, Maharashtra / THE PREMIA

Registered No litigation declared Residential / Group Housing project

THE PREMIA

By Chanddrakant Shivajirao Ghuley

RG-MH-18872 · RERA P52100077812 · Last updated on MahaRERA portal: 9 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
8 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 90%
1 of 101Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

THE PREMIA is a Residential / Group Housing project by Chanddrakant Shivajirao Ghuley in Pune, Maharashtra, registered with MahaRERA as P52100077812 on 7 Nov 2024. Possession is promised by 31 Dec 2028. 100 of the 101 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.

At a glance

Project

  • NameTHE PREMIA
  • TypeResidential / Group Housing
  • Location
    • Manjari Budruk
    • MANJARI Bk
    • Haveli
    • Pune
    • 412307
  • Pincode412307
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100077812
  • ReraGenie IDRG-MH-18872

Builder

  • NameChanddrakant Shivajirao Ghuley
  • Entity typeIndividual
  • GSTIN27AALPG6376J2Z7
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredNov 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Nov 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed74 files

Current status

99%100 of 101 units booked
76.0%Work done, per cost certificate

Figures as on 9 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A1 WingNA121050050
A2 WingNA131151051

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 9 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 90%.

A1 Wing45%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A2 Wing45%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises82%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed239

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots239
Closed/Covered153
Open Space86
BuildingClosed/CoveredOpen SpaceTotal
A1 Wing7642118
A2 Wing7744121

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,000 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPune Metropolitan Regional Development Authority, Pune
Permissible FSI11584.78
Proposed, not sanctioned9,942 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGR FLR MEZZANINE SHOP NO 3 4 BLUE HILLS COOP HSG SOCIETY PLOT NO 128 S NO 103 YERWADA PUNE MH 411006
Estimated costRs 53.50 cr
Cost incurredRs 40.64 cr
Work done75.96%
BuildingWingEstimatedIncurred
A1 WingNARs 25.00 crRs 20.32 cr
A2 WingNARs 25.00 crRs 20.32 cr
-NARs 3.50 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANS ARCHITECTS
EngineerHarshal Pramod Wani
Chartered AccountantSCT & Company
Chartered AccountantP N THOMBRE & ASSOCIATES
PartnerRole in project
Chanddrakant Shivajirao Ghuley-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Jun 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Jun 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1 The Premia Q4 F Y 2025-2026.pdf9 Jun 2026
Withdrawal Update Form 2File: Form-2 The Premia Q4 F Y 2025-2026.pdf9 Jun 2026
Withdrawal Update Form 3File: Form 3 Signed Q4_DSC.pdf9 Jun 2026
Commencement certificateFile: Commencement Certificate.pdf4 Jun 2026
Layout approvalFile: Layout.pdf4 Jun 2026
Building plan approvalFile: Plan 1.pdf4 Jun 2026
Building plan approvalFile: Plan 2.pdf4 Jun 2026
Building plan approvalFile: Plan 3.pdf4 Jun 2026
Building plan approvalFile: Plan 4.pdf4 Jun 2026
Withdrawal Update Form 1File: Form-1 The Premia Q4 F Y 2025-2026.pdf4 Jun 2026
Withdrawal Update Form 2File: Form-2 The Premia Q4 F Y 2025-2026.pdf4 Jun 2026
Withdrawal Update Form 3File: Form 3- CA Certificates Q4-DSC Signed.pdf4 Jun 2026
Withdrawal Update Form 1File: Form 1 Architect Certificates.pdf11 Feb 2026
Withdrawal Update Form 1File: Form - 1 Architect Certificates- The Premia Q3.pdf11 Feb 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate.pdf11 Feb 2026
Withdrawal Update Form 2File: Form - 2 Engineer Certificate The Premia Q3.pdf11 Feb 2026
Withdrawal Update Form 3File: Form 3- CA Certificates Q3.pdf11 Feb 2026
Withdrawal Update Form 3File: Form 3- CA Certificates Q3.pdf11 Feb 2026
Form 2A (FY 2024-2025)File: Form 2A FY 2024-25.pdf11 Feb 2026
Form 5 (FY 2024-2025)File: Form 5 The Premia - FY 24-25.pdf11 Feb 2026
Withdrawal Update Form 1File: Form 1 Architect Certificates.pdf10 Dec 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate.pdf10 Dec 2025
Withdrawal Update Form 3File: Form 3 CA Certificates Q2.pdf10 Dec 2025
Layout approvalFile: Layout.pdf16 Jul 2025
Building plan approvalFile: Plan 1.pdf16 Jul 2025
Building plan approvalFile: Plan 2.pdf16 Jul 2025
Building plan approvalFile: Plan 3.pdf16 Jul 2025
Building plan approvalFile: Plan 4.pdf16 Jul 2025
Layout approvalFile: 1.pdf7 Jul 2025
Building plan approvalFile: 1.pdf7 Jul 2025
Building plan approvalFile: 2.pdf7 Jul 2025
Building plan approvalFile: 3.pdf7 Jul 2025
Building plan approvalFile: 4.pdf7 Jul 2025
Building plan approvalFile: 5.pdf7 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf21 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf21 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf21 Mar 2025
Proforma of Agreement for saleFile: Draft Agreement.pdf7 Jan 2025
Building plan approvalFile: Revised.pdf11 Nov 2024
Building plan approvalFile: Revised.pdf11 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Revised.pdf11 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Revised.pdf11 Nov 2024
Other - LegalFile: 7-12 Extract.pdf4 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Bank Letter.pdf21 Oct 2024
PAN CardFile: PAN Card.pdf18 Oct 2024
Proforma of Allotment letterFile: Allotment Letter.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf18 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration about RERA Bank Accounts.pdf18 Oct 2024
Proforma of Agreement for saleFile: Sample Agreement.pdf18 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.pdf18 Oct 2024
Building plan approvalFile: Plan 4.pdf17 Oct 2024
Building plan approvalFile: Plan 3.pdf17 Oct 2024
Building plan approvalFile: Plan 2.pdf17 Oct 2024
Building plan approvalFile: Plan 1.pdf17 Oct 2024
Layout approvalFile: Layout.pdf17 Oct 2024
Copy of the legal title reportFile: Title Search Report Annexure.pdf17 Oct 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate.pdf17 Oct 2024
Copy of Layout Approval (in case of layout)File: Layout.pdf17 Oct 2024
Declaration in FORM BFile: Form B.pdf17 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf17 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 1.pdf17 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf17 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 3.pdf17 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 4.pdf17 Oct 2024
Declaration about Commencement CertificateFile: Format D.pdf17 Oct 2024
CERSAI detailsFile: CERSAI Declaration.pdf17 Oct 2024
Deviation Report with respect to Allotment letterFile: Deviation Report - Allotment Letter.pdf17 Oct 2024
Details of encumbrances concerned to LegalFile: Encumbrance Certificate.pdf17 Oct 2024
Other - TechnicalFile: Annexure A.pdf17 Oct 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report - Agreement.pdf17 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of Finance.pdf17 Oct 2024

How this compares with Pune

99%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THE PREMIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Manjari Budruk13,700+ in Pune

2 kmTHE PREMIACompleted 37Lapsed / revoked 12Other 31Dot size: filed unitsN

Filed coordinates, straight-line distance. 80 registered projects within 2 km.

Builder: Chanddrakant Shivajirao Ghuley

Chanddrakant Shivajirao Ghuley has 2 registrations on MahaRERA, including THE PREMIA and THE ASTRIA. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if THE PREMIA is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE PREMIA?

The registered promoter entity is Chanddrakant Shivajirao Ghuley, an individual as per the filing. Its GSTIN 27AALPG6376J2Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE PREMIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE PREMIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE PREMIA?

The professionals named in the filing: Architect: SANS ARCHITECTS; Engineer: Harshal Pramod Wani; Chartered Accountant: SCT & Company; Chartered Accountant: P N THOMBRE & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE PREMIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE PREMIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE PREMIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.