  • Possession 1 months past the filed date
  • 5 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 5 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Sep 2026Possession promised1 month past this date
5 of 11Construction stages donefurthest along: Staircases, 92%
25 of 32Units unsoldnot recorded sold or booked
5Complaints at MahaRERAon this registration
Jump to the 114 documents Report an error

THE PLEASANT CO OP HOUSING SOCIETY LTD is a Residential / Group Housing project by SHREE VENKATESH LANDMARKS in ERANDWANE, 411004, registered with MahaRERA as P52100076724 on 21 Jun 2024. Possession was promised by 30 Sep 2026 and is now 1 months past that date. 7 of the 32 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 5 complaints are on record with the regulator.

At a glance

Project

  • NameTHE PLEASANT CO OP HOUSING SOCIETY LTD
  • TypeResidential / Group Housing
  • Location
    • PRABHAT ROAD
    • ERANDWANE
    • 411004
  • Pincode411004
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100076724
  • ReraGenie IDRG-MH-07421

Builder

  • NameSHREE VENKATESH LANDMARKS
  • Entity typePartnership
  • GSTIN27AEUFS9770B1ZD
  • PartnersANKUSH BHIMRAO ASABE, LAHURAJ BHIMRAO ASABE, GAJANAN MOTIRAM PANJARKAR
  • Declared earlier projects5 →

Key dates

1 months past promisethis monthRegisteredJun 2024PromisedSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Jun 2024
  • Promised completion30 Sep 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed114 files

Current status

22%7 of 32 units booked
79.9%Work done, per cost certificate

Figures as on 25 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
THE PLEASANT CO OP HOUSING SOCIETY LTDNA10832032

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 92%.

THE PLEASANT CO OP HOUSING SOCIETY LTD: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises64%
Sanitary Fittings within the flats / premises51%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks92%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.71%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.21%

Progress on shared amenities15

As on 25 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed74

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots74
Closed/Covered74

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,657 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Declared on23 Sep 2024
LandownerVillageDistrict
THE PLEASANT CO OP HOUSING SOCIETY LTD-Pune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI5450.0
Proposed, not sanctioned5,449 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPMT BUILDING J M ROAD, DECCAN GYMKHANA PUNE 411004
Estimated costRs 20.80 cr
Cost incurredRs 16.61 cr
Work done79.86%
BuildingWingEstimatedIncurred
THE PLEASANT CO OP HOUSING SOCIETY LTDNARs 20.21 crRs 16.57 cr
-NARs 58.87 lakhRs 4.12 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR AMIT EKAMBE
ArchitectAMIT R EKAMBE
EngineerMAHENDRA RAMPURE
EngineerNIKHIL MILIND GHOLAP
Chartered AccountantCA SUNILKUMAR WADHWANI
Chartered AccountantSUNILKUMAR WADHWANI
Chartered AccountantAVINASH UTGIKAR
PartnerRole in project
SHREE VENKATESH LANDMARKS-

Complaints filed with MahaRERA5

Case no.ComplainantRespondentFiled
SM12600126Ram GawaliSHREE VENKATESH LANDMARKS09/02/2026
SM12600297Ram GawaliSHREE VENKATESH LANDMARKS07/05/2026
SM12600244Ram Gawali-06/04/2026
SM12600299Ram GawaliSHREE VENKATESH LANDMARKS07/05/2026
SM12600370Ram GawaliSHREE VENKATESH LANDMARKS27/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed114

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 114 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: FORM 5-PLEASANT-MAR-26.pdf25 May 2026
Form 2A (FY 2025-2026)File: FORM 2A-PLEASANT-MAR-2026.pdf12 May 2026
Withdrawal Update Form 1File: ARCH CERTIFICATE PLEASANT-MAR-2026.pdf14 Apr 2026
Withdrawal Update Form 2File: ENGG CERTIFICATE -PLEASANT-MAR-2026.pdf14 Apr 2026
Withdrawal Update Form 3File: CA CERTIFICATE PLEASANT-MAR-2026.pdf14 Apr 2026
Withdrawal Update Form 1File: ARCH CERTIFICATE PLEASANT-DEC-25.pdf20 Jan 2026
Withdrawal Update Form 2File: ENGG CERTIFICATE PLEASANT-DEC-25.pdf20 Jan 2026
Withdrawal Update Form 3File: CA CERTIFICATE PLEASANT-DEC-25.pdf20 Jan 2026
Withdrawal Update Form 1File: ARCH CERTIFICATE -PLEASANT -SEPT-25.pdf17 Oct 2025
Withdrawal Update Form 2File: ENGG CERTIFICATE PLEASANT-SEPT-25.pdf17 Oct 2025
Withdrawal Update Form 3File: CA CERTIFICATE PLEASANT SEPT-25.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: FORM 5- PLEASANT-15-10-2025.pdf14 Oct 2025
Withdrawal Update Form 1File: ARCH CERTIFICATE PLEASANT-JUN-2025.pdf15 Jul 2025
Withdrawal Update Form 2File: ENGG CERTIFICATE PLEASANT-JUN-2025.pdf15 Jul 2025
Withdrawal Update Form 3File: CA CERTIFICATE PLEASANT -JUN-2025.pdf15 Jul 2025
Form 1File: ARCH CERTIFICATE PLEASANT.pdf28 May 2025
Form 2File: ENGG CERTIFICATE PLEASANT.pdf28 May 2025
Form 3File: CA CERTIFICATE PLEASANT.pdf28 May 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY PLEASANT.pdf28 May 2025
Form 1File: ARCH CERTIFICATE PLEASANT.pdf28 May 2025
Form 2File: ENGG CERTIFICATE PLEASANT-1-10-24.pdf28 May 2025
Form 3File: CA CERTIFICATE PLEASANT-1-10-24.pdf28 May 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSER OF SOLD INVENTORY PLEASANT.pdf28 May 2025
Form 1File: ARCH CERTIFICATE PLEASANT.pdf28 May 2025
Form 2File: ENGG CERTIFICATE PLEASANT.pdf28 May 2025
Form 3File: CA CERTIFICATE PLEASANT-4-1-2025.pdf28 May 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSER OF SOLD UNSOLD UNITS-PLEASANT.pdf28 May 2025
Form 1File: ARCH CERTIFICATE PLEASANT.pdf28 May 2025
Form 2File: ENGG CERTIFICATE PLEASANT.pdf28 May 2025
Form 3File: CA CERTIFICATE PLEASANT.pdf28 May 2025
Disclosure of Sold and Booked InventoryFile: DISCLOER OF SOLD INVENTORY PLEASANT.pdf28 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE PLEASANT.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE PLEASANT.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE PLEASANT.pdf16 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOER OF SOLD INVENTORY PLEASANT.pdf16 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 2A PLEASANT- MAR-25.pdf16 Apr 2025
Layout approvalFile: 1-5.pdf19 Mar 2025
Building plan approvalFile: 2-5.pdf19 Mar 2025
Building plan approvalFile: 3-5.pdf19 Mar 2025
Building plan approvalFile: 4-5.pdf19 Mar 2025
Building plan approvalFile: 5-5.pdf19 Mar 2025
Copy of Layout Approval (in case of layout)File: 1-5.pdf19 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: 13-03-2025 CC 3969-24.pdf19 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 2-5.pdf19 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 3-5.pdf19 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 4-5.pdf19 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 5-5.pdf19 Mar 2025
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE-19-3-25.pdf19 Mar 2025
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE-19-3-25.pdf19 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE PLEASANT.pdf11 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE PLEASANT-4-1-2025.pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE PLEASANT.pdf11 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A PLEASANT- DEC-24.pdf11 Jan 2025
Layout approvalFile: 1-5.pdf7 Nov 2024
Building plan approvalFile: 2-5.pdf7 Nov 2024
Building plan approvalFile: 2-5.pdf7 Nov 2024
Building plan approvalFile: 3-5.pdf7 Nov 2024
Building plan approvalFile: 4-5.pdf7 Nov 2024
Building plan approvalFile: 5-5.pdf7 Nov 2024
Copy of Layout Approval (in case of layout)File: 1-5.pdf7 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: 5-5.pdf7 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE -25-10-24.pdf7 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: 4-5.pdf7 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: 3-5.pdf7 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: 2-5.pdf7 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 2-5.pdf7 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 2-5.pdf7 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 3-5.pdf7 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 4-5.pdf7 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 5-5.pdf7 Nov 2024
Declaration about Commencement CertificateFile: DECLARATION ABT COMMENCEMENT CERTIFICATE -7-11-24.pdf7 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE PLEASANT.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE PLEASANT SOCIETY.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE PLEASANT-1-10-24.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD INVENTORY PLEASANT.pdf18 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A PLEASANT- SEPT-24.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE PLEASANT.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE PLEASANT.pdf12 Jul 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY PLEASANT.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE PLEASANT.pdf12 Jul 2024

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
VENKATESH GRAFFITI ELAN PHASE 2MUNDHWA MANJARI ROAD KESHAVNAGAR MUNDHWA PUNE 411036124CompletedJun 2024Sep 2023
VENKATESH GRAFFITI ELAN PHASE 1Sr No 32 2B Manjiri Mundhwa Road Keshav Nagar Mundhwa PUNE 411036125CompletedMay 2024Sep 2023
VENKATESH GRAFFITI GLOVER PHASE 3 - MHADAMUNDHWA MANJIRI ROAD KESHAV NAGAR MUNDHWA PUNE 41103660CompletedSep 2023Aug 2023
VENKATESH GRAFFITI ELITE PHASE 2MUNDHWA MANJARI ROAD KESHAVNAGAR MUNDHWA PUNE 411036101CompletedDec 2022Jun 2021
Venkatesh Graffiti Elite Phase 1Sr 31 2 2B Beside Venkatesh Graffiti Open Space 1 Mundhwa Manjari Rd Keshav Nagar PUNE 41103690CompletedAug 2022Nov 2020

Keep THE PLEASANT CO OP HOUSING SOCIETY LTD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ERANDWANE

2 kmTHE PLEASANT CO OP HOUSICompleted 32Lapsed / revoked 14Other 76Dot size: filed unitsN

Filed coordinates, straight-line distance. 122 registered projects within 2 km.

Builder: SHREE VENKATESH LANDMARKS

SHREE VENKATESH LANDMARKS has 1 registration on MahaRERA, including THE PLEASANT CO OP HOUSING SOCIETY LTD. Its filings disclose 5 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record.

Frequently asked questions

What are my rights if THE PLEASANT CO OP HOUSING SOCIETY LTD is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE PLEASANT CO OP HOUSING SOCIETY LTD?

The registered promoter entity is SHREE VENKATESH LANDMARKS, a partnership as per the filing. Its GSTIN 27AEUFS9770B1ZD can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE PLEASANT CO OP HOUSING SOCIETY LTD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against THE PLEASANT CO OP HOUSING SOCIETY LTD?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for THE PLEASANT CO OP HOUSING SOCIETY LTD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE PLEASANT CO OP HOUSING SOCIETY LTD?

The professionals named in the filing: Architect: AR AMIT EKAMBE; Architect: AMIT R EKAMBE; Engineer: MAHENDRA RAMPURE; Engineer: NIKHIL MILIND GHOLAP; Chartered Accountant: CA SUNILKUMAR WADHWANI; Chartered Accountant: SUNILKUMAR WADHWANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE PLEASANT CO OP HOUSING SOCIETY LTD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE PLEASANT CO OP HOUSING SOCIETY LTD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE PLEASANT CO OP HOUSING SOCIETY LTD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.