Home / Browse projects / Pune, Maharashtra / The Orchard Residences

Registered No litigation declared Residential / Group Housing project

The Orchard Residences

By PARANJAPE SCHEMES (CONSTRUCTION) LTD

RG-MH-05189 · RERA P52100055710 · Last updated on MahaRERA portal: 8 Jan 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 28 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2029Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 80%
4 of 12Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 45 documents Report an error

The Orchard Residences is a Residential / Group Housing project by PARANJAPE SCHEMES (CONSTRUCTION) LTD in Pune, Maharashtra, registered with MahaRERA as P52100055710 on 15 Apr 2024. Possession is promised by 31 Mar 2029. 8 of the 12 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameThe Orchard Residences
  • TypeResidential / Group Housing
  • Location
    • Bhugaon
    • Mulshi
    • Pune
    • 412115
  • Pincode412115
  • RERA no.P52100055710
  • ReraGenie IDRG-MH-05189

Builder

  • NamePARANJAPE SCHEMES (CONSTRUCTION) LTD
  • Entity typeCompany
  • ChairpersonSHRIKANT PURUSHOTTAM PARANJAPE
  • Managing DirectorSHASHANK PURUSHOTTAM PARANJAPE
  • Other registrations28 more →
  • Completed15 of 29
  • No longer live7 lapsed, de-registered or revoked
  • Declared earlier projects17 →

Key dates

this monthRegisteredApr 2024PromisedMar 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Apr 2024
  • Promised completion31 Mar 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed45 files

Current status

67%8 of 12 units booked
29.5%Work done, per cost certificate

Figures as on 8 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
The Orchard ResidencesNA3312012

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 80%.

The Orchard Residences: 7% average across the applicable activities

ActivityProgress
Excavation80%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed64

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots64
Closed/Covered64

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,295 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Jul 2025

Approvals and building plan

Sanctioning authorityPune metropolitan Region Development Authority
Permissible FSI2911.25
Proposed, not sanctioned2,911 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLaukik Appt,Ground Floor, Plot Np 3, CTS No 870,, Bhanadakar Road, Pune 411004
Estimated costRs 16.01 cr
Cost incurredRs 4.72 cr
Work done29.46%
BuildingWingEstimatedIncurred
The Orchard ResidencesNARs 13.81 crRs 3.81 cr
-NARs 2.20 crRs 90.29 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSumit S Dakhave
ArchitectCorner Stone Works Pvt Ltd.
ArchitectCorner stone Works Pvt Ltd
Engineer-Mr. Shekhar Pingale
EngineerDepali Desai
Chartered AccountantCA Sumit Kapure
Chartered AccountantKapure and Kapure Chartered Accoutant
PartnerRole in project
PARANJAPE SCHEMES (CONSTRUCTION) LTD-

Litigation declared4

CaseCourtStatus
1480/2011CIVIL COURT SENIOR DIVISIONMatter is kept for hearing
593/2018CIVIL JUDGE JUNIOR DIVISIONApplicant has taken steps for issue of summons Report awaited
186/2018CIVIL COURT SENIOR DIVISIONMatter is kept for framing issues
1120/2022CIVIL COURT SENIOR DIVISIONMatter is kept for hearing Awaiting summons

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2029

Documents filed45

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 3 R40-Orchard Resi -FORM 1-June'24-uploaded.pdf8 Jan 2026
Withdrawal Update Form 2File: Form 2_ The Orchard Resi-June25.pdf8 Jan 2026
Withdrawal Update Form 3File: R 40 - June 25_compressed.pdf8 Jan 2026
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-The Orchard Residences-Mar'25-uplaoded.pdf8 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 R40-The Orchards-Dec'24-uploaded.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-R40 The Orch Resi-Sept'24-uploaded.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rera form2 R40 The Orechard residency DEC 24 Signoff-compressed-uploaded.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-The Orchards R-40-Sept'24-uploaded.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-The Orchard Resi-Sept'24-uploaded.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 19 Form 2- The Orchard Residences-June'24-uploaded.pdf6 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 R40-Orchard Resi -FORM 1-June'24-uploaded.pdf4 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 7 The Orchards-R40-FORM 2A-June'24-uploaded.pdf4 Jul 2024
Other - LegalFile: Declaration regarding Survey no for R40-The Orchard Resi.pdf4 May 2024
Building plan approvalFile: Sheet 2-R40.pdf2 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet 2-R40.pdf2 Apr 2024
Other - FinanceFile: Sheet 2-R40.pdf28 Mar 2024
Details of encumbrances concerned to FinanceFile: Declaration Encumbrances- Finance R40.pdf16 Mar 2024
Details of encumbrances concerned to FinanceFile: Declaration Encumbrances-Legal-R40.pdf16 Mar 2024
Details of encumbrances concerned to LegalFile: Declaration Encumbrances- Finance R40.pdf16 Mar 2024
Details of encumbrances concerned to LegalFile: Declaration Encumbrances-Legal-R40.pdf16 Mar 2024
Declaration about Commencement CertificateFile: Declaration about CC-R40.pdf16 Mar 2024
CERSAI detailsFile: Declaration-CERSAI-R40.pdf16 Mar 2024
Proforma of Allotment letterFile: Proforma Allotment Letter-R40.pdf16 Mar 2024
Deviation Report with respect to model copy of AgreementFile: AFS -deviation report-R40.pdf16 Mar 2024
Other - LegalFile: AFS-Non Negotiable Clauses-R40.pdf16 Mar 2024
Other - TechnicalFile: Declaration cum Undertaking Annexure A-R40.pdf16 Mar 2024
Building plan approvalFile: Sheet 2-R40.pdf15 Mar 2024
Building plan approvalFile: Sheet 3-R40.pdf15 Mar 2024
Building plan approvalFile: Sheet 4-R40.pdf15 Mar 2024
Layout approvalFile: Sheet 1-R40.pdf15 Mar 2024
PAN CardFile: 1 PAN Card.pdf15 Mar 2024
Copy of the legal title reportFile: Legal Title Report- Sector R40-15-03-2024-With new mortgages.pdf15 Mar 2024
Copy of Layout Approval (in case of layout)File: Sheet 1-R40.pdf15 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet 2-R40.pdf15 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet 3-R40.pdf15 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet 4-R40.pdf15 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: Plan Permission Order_Sector R40_04-03-2024_Bhugaon.pdf15 Mar 2024
Declaration in FORM BFile: Form B-Promoter-R40.pdf15 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Copy-Form 3- R 40 - Orchard Residences - Mar 2024.pdf15 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Of Interest-Annexure A-PSCL-R40.pdf15 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest-Annexure A-Shashank Parnajpe-R40.pdf15 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Of Interest-Annexure A-Shrikant Paranjape -R40.pdf15 Mar 2024
Proforma of Agreement for saleFile: AFS_R40 Orchard Residences-Clean-15Mar24.pdf15 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration of Bank Account-R40.pdf15 Mar 2024
Deviation Report with respect to Allotment letterFile: Proforma Allotment Letter-Deviation Report-R40.pdf15 Mar 2024

Promoter's earlier projects8

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

7 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
127 UPPER EASTP51800000454Andheri, Mumbai Suburban-Jul 2017CompletedJun 2024Registered original: Dec 2019Jan 1970
PRATHAM RESIDENTIAL727 SADASHIV PETH KUMTHEKAR ROAD PUNE 41103035-CompletedApr 2016Mar 2016
THE BUSINESS HUBSURVEY NO25 HISSA NO 29 HISSA NO 1 KOTHRUD PUNE 41102986-CompletedJan 2016Nov 2015
MADHUKOSH - IIISNo4 HISSA NO 2 SNO 16 AND 17 part Wadgaon khurd Tal Haveli Sinhgad road Pune258-CompletedAug 2015Aug 2015
PRATHAM COMMERCIAL727 SADASHIV PETH KUMTHEKAR ROAD PUNE 41103032-CompletedJun 2015Apr 2015
PUNARVASUPRABHAT ROAD ERANDWANE PUNE 41100410-CompletedDec 2014Late, Jun 2015
MADHUKOSH - IISNo4 HISSA NO 2 SNO 16 17 part Wadgaon khurd Tal Haveli Sinhgad road Pune150-CompletedDec 2013Oct 2013
MADHUKOSH - ISNo 4 HISSA NO 2 SNO 16 AND 17 part Wadgaon khurd Tal Haveli Sinhgad road Pune289-CompletedMar 2012Feb 2012

How this compares with Pune

67%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The Orchard Residences on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhugaon13,700+ in Pune

Builder: PARANJAPE SCHEMES (CONSTRUCTION) LTD

PARANJAPE SCHEMES (CONSTRUCTION) LTD has 29 registrations on MahaRERA, including SWAPNASAMRAT and Blue Ridge Project C Land T18 and T19. Its filings disclose 17 earlier MahaRERA projects: declares 9 of 17 past projects completed on time. Litigation is declared on 6 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if The Orchard Residences is delayed beyond 31 Mar 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Orchard Residences?

The registered promoter entity is PARANJAPE SCHEMES (CONSTRUCTION) LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Orchard Residences?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for The Orchard Residences?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The Orchard Residences?

The professionals named in the filing: Architect: Sumit S Dakhave; Architect: Corner Stone Works Pvt Ltd.; Architect: Corner stone Works Pvt Ltd; Engineer: -Mr. Shekhar Pingale; Engineer: Depali Desai; Chartered Accountant: CA Sumit Kapure. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Orchard Residences?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Orchard Residences. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Orchard Residences to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.