ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / FOREST TRAILS ATHASHRI B3

Registered Litigation declared Residential / Group Housing project

FOREST TRAILS ATHASHRI B3

By LAVIM DEVELOPERS PVT LTD

RG-MH-19406 · RERA P52100077686 · Last updated on MahaRERA portal: 11 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 4 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2029Possession promisedno revision filed
3 of 33Construction stages doneacross 3 buildings; furthest along: Basement (if any), 50%
434 of 522Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

FOREST TRAILS ATHASHRI B3 is a Residential / Group Housing project by LAVIM DEVELOPERS PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100077686 on 21 Oct 2024. Possession is promised by 30 Sep 2029. 88 of the 522 units on this registration are recorded sold or booked, and 3 of 33 construction stages are filed complete.

At a glance

Project

  • NameFOREST TRAILS ATHASHRI B3
  • TypeResidential / Group Housing
  • Location
    • Paud Road
    • Bhugaon
    • Mulshi
    • Pune
    • 412115
  • Pincode412115
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100077686
  • ReraGenie IDRG-MH-19406

Builder

  • NameLAVIM DEVELOPERS PVT LTD
  • Entity typeCompany
  • GSTIN27AAACL6194P1ZT
  • DirectorsPUSHKAR PRAMOD APTE, Amit Paranjape
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2024PromisedSep 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Oct 2024
  • Promised completion30 Sep 2029
  • Revised completionNone
  • Buildings3 building records
  • Documents filed69 files

Current status

17%88 of 522 units booked
10.9%Work done, per cost certificate

Figures as on 11 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WingNA15152470247
B WingNA15152470247
Commercial BuildingNA3302828

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 11 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Basement (if any), at 50%.

A Wing10%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B Wing24%
ActivityProgress
Excavation100%
Basement (if any)50%
Podiums (if any)0%
Plinth100%
Stilt Floor10%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Commercial Building0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed797

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots797
Closed/Covered265
Open Space532
BuildingClosed/CoveredOpen SpaceTotal
A Wing147283430
B Wing118249367

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area9,621 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Jun 2026

Approvals and building plan

Sanctioning authorityPune metropolitan Region Development Authority
Permissible FSI54000.0
Proposed, not sanctioned37,991 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLAUKIK APARTMENTSGROUND FLOOR,PLOT NO 3, CTS NO 870BHANDARKAR
Estimated costRs 156.34 cr
Cost incurredRs 17.04 cr
Work done10.9%
BuildingWingEstimatedIncurred
A WingNARs 133.37 crRs 13.05 cr
-NARs 18.45 crRs 75.87 lakh
B WingNARs 4.52 crRs 3.23 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAniruddha Vaidya & Associates
EngineerKoumudi Bhandarkar
Chartered AccountantHemant P Puri & Associates
Chartered AccountantKapure and Kapure
PartnerRole in project
LAVIM DEVELOPERS PVT LTD-

Litigation declared4

CaseCourtStatus
1480/2011/2011Civil Judge Senior Divison PuneMatter is kept for evidence
593/2018/2018Civil Judge Junior DivisonApplicant has taken steps for issue of summons report awaited
186/2018/2018Civil Judge Senior DivisionMatter is kept for arguments on next date
1120/2022/2022Civil Judge Senior DivisionMatter is kept for hearing on application filed by defedant

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2029

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1-R29.pdf11 Jun 2026
Withdrawal Update Form 1File: Form 1-R29.pdf11 Jun 2026
Withdrawal Update Form 2File: Form 2 -Athashri B3.pdf11 Jun 2026
Withdrawal Update Form 2File: Form 2 -Athashri B3.pdf11 Jun 2026
Withdrawal Update Form 3File: Form 3 Athashri B3 Dec 25-compressed.pdf11 Jun 2026
Withdrawal Update Form 3File: Form 3 Athashri B3 Dec 25-compressed.pdf11 Jun 2026
Form 1File: Form 1 Athashri B3.pdf10 Jun 2026
Form 2File: Form 2_ Athashri B3.pdf10 Jun 2026
Form 3File: Form 3 June 25-compressed.pdf10 Jun 2026
Disclosure of Sold and Booked InventoryFile: Form 3 June 25-compressed.pdf10 Jun 2026
Form 1File: FORM 1-Athashri B3.pdf10 Jun 2026
Form 2File: FORM 2-Athashri B3.pdf10 Jun 2026
Form 3File: Form 3 Athashri B3 Sept 25-compressed.pdf10 Jun 2026
Disclosure of Sold and Booked InventoryFile: Form 3 Athashri B3 Sept 25-compressed.pdf10 Jun 2026
Form 5 (FY 2024-2025)File: Form 5 _ Athashri B3.pdf10 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-FT Athashri B3-Mar'25-uploaded.pdf8 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -FT Athashri B3-Dec'24-uploaded.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Athashri B3-Dec'24-uploaded.pdf15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_merged_compressed.pdf17 Oct 2024
Other - TechnicalFile: Sale Deed 6.pdf16 Oct 2024
Other - TechnicalFile: Sale Deed 10.pdf16 Oct 2024
Other - TechnicalFile: Sale Deed 9.pdf16 Oct 2024
Other - TechnicalFile: Sale Deed 8.pdf16 Oct 2024
Other - TechnicalFile: Sale Deed 7.pdf16 Oct 2024
Other - TechnicalFile: Sale Deed 5.pdf16 Oct 2024
Other - TechnicalFile: Sale Deed 4.pdf16 Oct 2024
Other - TechnicalFile: Sale Deed 3.pdf16 Oct 2024
Other - TechnicalFile: Sale Deed 2.pdf16 Oct 2024
Other - TechnicalFile: Sale Deed 1.pdf16 Oct 2024
Building plan approvalFile: Sheet 8-Commercial wing details.pdf9 Oct 2024
Building plan approvalFile: Sheet 7.pdf9 Oct 2024
Building plan approvalFile: Sheet 6.pdf9 Oct 2024
Building plan approvalFile: Sheet 5.pdf9 Oct 2024
Building plan approvalFile: Sheet 4.pdf9 Oct 2024
Building plan approvalFile: Sheet 3.pdf9 Oct 2024
Building plan approvalFile: Sheet 2.pdf9 Oct 2024
Layout approvalFile: Sheet 1.pdf9 Oct 2024
PAN CardFile: Lavim PAN.pdf9 Oct 2024
Copy of the legal title reportFile: Legal Title Report-FT Athashri B3.pdf9 Oct 2024
Details of encumbrances concerned to FinanceFile: Encumbrance - Finance.pdf9 Oct 2024
Details of encumbrances concerned to FinanceFile: Encumbrance - legal.pdf9 Oct 2024
Copy of Layout Approval (in case of layout)File: Sheet 1.pdf9 Oct 2024
Proforma of Allotment letterFile: Proforma Allotment Letter-FT B3 -New Order 60.pdf9 Oct 2024
Declaration in FORM BFile: Form B-Affidavit of Promoter-FT Athashri B3.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -On letterhead -Engineer-Athashri B3-regn-thr portal.pdf9 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.PDF9 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet 2.pdf9 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet 3.pdf9 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet 4.pdf9 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet 5.pdf9 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet 6.pdf9 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet 7.pdf9 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet 8-Commercial wing details.pdf9 Oct 2024
Other - LegalFile: Declaration - Other-Non Negotiable Clauses-Legal-FT B3.pdf9 Oct 2024
Declaration about Commencement CertificateFile: Declaration for Commencement Certificate-FT Athashri B3.pdf9 Oct 2024
CERSAI detailsFile: CERSAI_Acknowledgemnt_Report_200319806652_For_Registration_Of_Security_Interest_06_09_20249 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: FORM A-Declration of Bank Accounts-FT ATahshri B3.pdf9 Oct 2024
Deviation Report with respect to Allotment letterFile: Deviation report -Allotment-FT Athashri B3.pdf9 Oct 2024
Details of encumbrances concerned to LegalFile: Encumbrance - Finance.pdf9 Oct 2024
Details of encumbrances concerned to LegalFile: Encumbrance - legal.pdf9 Oct 2024
Other - TechnicalFile: Declaration cum Under taking by Lavim-Annexure A-FT B3.pdf9 Oct 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report-AFS-FT Athashri B3.pdf9 Oct 2024
Proforma of Agreement for saleFile: Final AFS Annexure I.pdf9 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A- Amit Paranjape-FT Atahshri B3-Disc of interest.pdf9 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A -Pushkar Pramod Apte-FT Athashri B3-Disc of interest.pdf9 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A-Rahul Paranjape-Dis of Interest.pdf9 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B-Bank Accounts confirmation by Bank for RERA -Athashri B3.pdf9 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of Secured Unsecured finance-B3 Regn_1.pdf9 Oct 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SKY ONEPLOT NO 444 AT CTS NO 1062 BHAMBURDE SHIVAJINAGAR PUNE29CompletedAug 2015Late, Jan 2016

How this compares with Pune

17%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep FOREST TRAILS ATHASHRI B3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhugaon13,700+ in Pune

2 kmFOREST TRAILS ATHASHRI BCompleted 2Lapsed / revoked 4Other 5Dot size: filed unitsN

Filed coordinates, straight-line distance. 11 registered projects within 2 km.

Builder: LAVIM DEVELOPERS PVT LTD

LAVIM DEVELOPERS PVT LTD has 2 registrations on MahaRERA, including Broadway - Brooklyn, Manhattan and EWS and FOREST TRAILS ATHASHRI B3. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if FOREST TRAILS ATHASHRI B3 is delayed beyond 30 Sep 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of FOREST TRAILS ATHASHRI B3?

The registered promoter entity is LAVIM DEVELOPERS PVT LTD, a company as per the filing. Its GSTIN 27AAACL6194P1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in FOREST TRAILS ATHASHRI B3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for FOREST TRAILS ATHASHRI B3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at FOREST TRAILS ATHASHRI B3?

The professionals named in the filing: Architect: Aniruddha Vaidya & Associates; Engineer: Koumudi Bhandarkar; Chartered Accountant: Hemant P Puri & Associates; Chartered Accountant: Kapure and Kapure. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in FOREST TRAILS ATHASHRI B3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About FOREST TRAILS ATHASHRI B3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save FOREST TRAILS ATHASHRI B3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.