ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / The Mulund Ankoor CHS. LTD.

Registration lapsed No litigation declared Others project

The Mulund Ankoor CHS. LTD.

By Indu Enterprise

RG-MH-09798 · RERA P51800002668 · Last updated on MahaRERA portal: 23 Jul 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 15 months past the filed date
  • Completion date moved by 62 months
  • 4 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jul 2025Possession promised15 months past this date
9 of 11Construction stages donefurthest along: Basement (if any), 0%
24 of 42Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

The Mulund Ankoor CHS. LTD. is a Others project by Indu Enterprise in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800002668 on 2 Aug 2017. Possession was promised by 31 Jul 2025 and is now 15 months past that date. The completion date has moved by 62 months from the original filing. 18 of the 42 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameThe Mulund Ankoor CHS. LTD.
  • TypeOthers
  • Location
    • Chaphekar Bandhu Marg
    • Mulund East
    • Kurla
    • Mumbai Suburban
    • 400081
  • Pincode400081
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800002668
  • ReraGenie IDRG-MH-09798

Builder

  • NameIndu Enterprise
  • Entity typePartnership
  • PartnerANISH BALKRISHNA JOSHI
  • Other registrations2 more →
  • Completed2 of 3
  • No longer live1 lapsed, de-registered or revoked

Key dates

15 months past promisethis monthRegisteredAug 2017First promiseMay 2020Revised toJul 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on2 Aug 2017
  • Promised completion31 Jul 2025
  • Revised completionRevised to 31 Jul 2025 (originally 31 May 2020)
  • Buildings1 building record
  • Documents filed84 files

Current status

43%18 of 42 units booked
97.9%Work done, per cost certificate

Figures as on 23 Jul 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
The Mulund Ankoor CHS LTDNA191936642

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

The Mulund Ankoor CHS LTD: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 23 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed32

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots32
Open Space32

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area899 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Jul 2025

Approvals and building plan

Sanctioning authorityMunicipal Corporation of Greater Mumbai
Permissible FSI2652.36
Proposed, not sanctioned1,060 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch101/104, Shreenath Plaza, 1st floor, L T Road, Mulund East, Mumbai 400081
Estimated costRs 7.14 cr
Cost incurredRs 6.99 cr
Work done97.91%
BuildingWingEstimatedIncurred
The Mulund Ankoor CHS LTDNARs 7.14 crRs 6.99 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRamesh Dalvi and Associates
EngineerRAJAN C TIPNIS
Chartered AccountantParas R Shah
PartnerRole in project
Indu Enterprise-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800009241May 2020 → Jul 2022

Reason as filed by the promoterI Mr. Mandar Dattatraya Vaidya, Partner of “Indu Enterprise” do hereby declare that the project “The Mulund Ankoor CHS. Ltd.” is registered with MahaRERA vide Registration Number “P51800002668” and end date for the project is 30th November 2020. I wish to extend the project till 31st July 2022. I further declare that project could not be completed due to various reasons beyond the control of the developer. Therefore, we have decided to apply for the extension of the project under Section 7(3) of The Real Estate (Regulation and Development) Act, 2016.

EXT51800002408May 2020 → May 2020

Reason as filed by the promoterAwaiting for further C.C. as per DCPR 2034

EXT51800015243May 2020 → Jul 2023

Reason as filed by the promoterI Mr. Anish Joshi, Partner of “Indu Enterprise” do hereby declare that the project “The Mulund Ankoor CHS. Ltd.” is registered with MahaRERA vide Registration Number “P51800002668” and end date for the project is 31st January 2023. I wish to extend the project till 31st July 2023. I further declare that project could not be completed due to various reasons beyond the control of the developer. Therefore, we have decided to apply for the extension of the project under Section 7(3) of The Real Estate (Regulation and Development) Act, 2016.

EXT51800025160May 2020 → Jul 2025

Reason as filed by the promoterAs attached

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate.pdf23 Jul 2025
Withdrawal Update Form 2File: Engineer Certificate.pdf23 Jul 2025
Withdrawal Update Form 3File: CA Certificate.pdf23 Jul 2025
Withdrawal Update Form 1File: Architect Certificate.pdf22 Jul 2025
Withdrawal Update Form 1File: Architect Certificate.pdf22 Jul 2025
Withdrawal Update Form 2File: Engineer Certificate.pdf22 Jul 2025
Withdrawal Update Form 2File: Engineer Certificate.pdf22 Jul 2025
Withdrawal Update Form 3File: CA Certificate.pdf22 Jul 2025
Withdrawal Update Form 3File: CA Certificate.pdf22 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf6 May 2025
Certificates of CA (Form 3)File: CA Certificate.pdf6 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate.pdf6 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf18 Feb 2025
Certificates of CA (Form 3)File: CA Certificate.pdf18 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf18 Feb 2025
Declaration in FORM BFile: Affidavit cum declaration -Ankoor.pdf22 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Form 5 Annual Return -Ankoor v3.pdf22 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect letter.pdf13 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate.pdf13 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold-Unsold Inventary Mar-24.pdf13 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold-Unsold Inventary June-24.pdf13 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold-Unsold Inventary Sep-24.pdf13 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A quality assurance certificate for 22-23.pdf13 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A quality assurance certificate for 23-24.pdf13 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect letter.pdf11 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate.pdf11 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf30 Oct 2024
Certificates of CA (Form 3)File: CA Certificate.pdf30 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf30 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf14 Oct 2024
Certificates of CA (Form 3)File: CA Certificate.pdf14 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf14 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate of Architect.pdf30 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificate of Engineer.pdf30 Apr 2024
Certificates of CA (Form 3)File: Certificate of CA.pdf30 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Certificate of CA (Form 5).pdf9 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate of Architect.pdf26 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificate of Engineer.pdf26 Feb 2024
Certificates of CA (Form 3)File: Certificate of CA.pdf26 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate of architect.pdf8 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificate of engineer.pdf8 Jan 2024
Certificates of CA (Form 3)File: Certificate of CA.pdf8 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Booked Inventory.pdf18 Dec 2023
Certificates of CA (Form 3)File: Certificate of CA.pdf29 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ankoor Architect Letter for Apr to Jun-23.pdf27 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ankoor Enginner certificate Apr to Jun-23.pdf27 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificates of Architect.pdf22 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificates of Engineer.pdf22 Jul 2023
Certificates of CA (Form 3)File: Certificate of CA.pdf22 Jul 2023
Declaration about Commencement CertificateFile: Ankoor Declaration about Commencement Certificate.pdf18 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Ankoor Form 2A.pdf18 Apr 2023
Details of encumbrancesFile: Details of encumbrances.pdf1 Apr 2023
Details of encumbrances concerned to FinanceFile: encumbrances concerned to Legal.pdf1 Apr 2023
Details of encumbrances concerned to LegalFile: encumbrances concerned to Legal.pdf1 Apr 2023
Disclosure of sold/ booked inventoryFile: Ankoor Sold Unsold inventary.pdf1 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: (Form 5) (FY 2018-19).pdf1 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CA (Form 5) (FY 2019-20).pdf1 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: (Form 5) (FY 2020-21).pdf1 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: (Form 5) (FY 2021-22).pdf1 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Ankoor Declaration for separate bank account.pdf1 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificates of Architect.pdf27 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificates of Engineer.pdf27 Jan 2023
Certificates of CA (Form 3)File: Certificates of CA.pdf27 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificates of Architect (Form 1).pdf21 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificates of Engineer (Form 2).pdf21 Nov 2022
Certificates of CA (Form 3)File: Certificates of CA (Form 3).pdf12 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificates of Architect (Form 1).pdf25 Aug 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificates of Engineer (Form 2).pdf25 Aug 2022
Certificates of CA (Form 3)File: Certificates of CA (Form 3).pdf25 Aug 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Formation of Legal Entity Ankoor Society.pdf21 Jul 2022
Certificates of CA (Form 5)File: Ankoor Form 5.pdf30 Nov 2018
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf23 Mar 2018
Declaration in FORM BFile: Declaration In Form B (1).pdf27 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate RERA -Ankoor.pdf27 Jul 2017
Certificates of CA (Form 3)File: Form 3 CA Certificate -RERA Ankoor (1).pdf27 Jul 2017
Building plan approvalFile: IOD.pdf17 Jul 2017
Building Plan Approval (IOD)File: IOD.pdf17 Jul 2017
Proforma of Allotment letterFile: Proforma of the Agreement for sale.pdf17 Jul 2017
Layout approvalFile: copy of Layout approval.pdf12 Jul 2017
Copy of the legal title reportFile: Copy of the legal title report.pdf12 Jul 2017

How this compares with Mumbai Suburban

43%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 62 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The Mulund Ankoor CHS. LTD. on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mulund East6,700+ in Mumbai Suburban

2 kmThe Mulund Ankoor CHS. LCompleted 112Lapsed / revoked 95Other 140Dot size: filed unitsN

Filed coordinates, straight-line distance. 347 registered projects within 2 km.

Builder: Indu Enterprise

Indu Enterprise has 3 registrations on MahaRERA, including The Mulund Ankoor CHS. LTD. and Dattatraya Annex. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that The Mulund Ankoor CHS. LTD. shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if The Mulund Ankoor CHS. LTD. is delayed beyond 31 Jul 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Mulund Ankoor CHS. LTD.?

The registered promoter entity is Indu Enterprise, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Mulund Ankoor CHS. LTD.?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for The Mulund Ankoor CHS. LTD.?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The Mulund Ankoor CHS. LTD.?

The professionals named in the filing: Architect: Ramesh Dalvi and Associates; Engineer: RAJAN C TIPNIS; Chartered Accountant: Paras R Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Mulund Ankoor CHS. LTD.?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Mulund Ankoor CHS. LTD.. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Mulund Ankoor CHS. LTD. to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.