The Legend Phase II
RG-MH-16453 · RERA P52100025986 · Last updated on MahaRERA portal: 11 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 42 months
- 2 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
The Legend Phase II is a Residential / Group Housing project by Shree Sankalp Associates in Pune, Maharashtra, registered with MahaRERA as P52100025986 on 7 Aug 2020. Possession is promised by 31 Dec 2027. The completion date has moved by 42 months from the original filing. 149 of the 244 units on this registration are recorded sold or booked, and 10 of 33 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameThe Legend Phase II
- TypeResidential / Group Housing
- Location
- Wakad Hinjewadi Road
- Opp Shell Petrol Pump
- Hinjavadi (CT)
- Mulshi
- Pune
- 411057
- Pincode411057
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100025986
- ReraGenie IDRG-MH-16453
Builder
- NameShree Sankalp Associates
- Entity typePartnership
- PartnersAmit Keshavdev Agarwal, Sandeep Shivaji Tapkir
- Other registrations1 more →
- Completed1 of 2
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on7 Aug 2020
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 30 Jun 2024)
- Buildings3 building records
- Documents filed182 files
Current status
Figures as on 11 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| The Legend B Wing | NA | 16 | 14 | 166 | 0 | 166 |
| The Legend C Wing | NA | 5 | 5 | 23 | 19 | 42 |
| The Legend D Wing | NA | 4 | 4 | 36 | 0 | 36 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 11 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.
The Legend B Wing82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
The Legend C Wing9%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
The Legend D Wing0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 11 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | Yes | 50% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 50% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed111
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| DYANOBA RAMBHAU SAKHARE | Hinjavadi (CT) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| The Legend B Wing | NA | Rs 10.11 cr | Rs 14.50 cr |
| The Legend C Wing | NA | Rs 10.11 cr | Rs 14.50 cr |
| The Legend D Wing | NA | Rs 10.11 cr | Rs 14.50 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sankalp Designers |
| Engineer | Sandip Haribalak Bhure |
| Engineer | Vinod Dadaso Kathare |
| Chartered Accountant | O.S.Chandak & Co. |
| Chartered Accountant | SPAK & Co |
| Partner | Role in project |
|---|---|
| Shree Sankalp Associates | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterReceiving sanction of new building, so need to extend the date of completion to 30/06/2026
Reason as filed by the promoterThe project completion has been delayed due to circumstances beyond the control of the promoter. The project was adversely affected by delays in statutory approvals, disruption in availability of labor and construction materials, and interruptions caused by external factors. In addition, unforeseen administrative and operational challenges impacted the planned construction schedule. Despite these difficulties, the promoter has continued construction activities and remains fully committed to completing the project at the earliest. The extension is sought to ensure timely completion with require
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000471284 | Vishal Jugalkishor Pallod | M/s Shree Sankalp Associates | 12/07/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jul 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Dec 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Dec 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed182
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 182 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A FY-2025-2026.pdf | 11 Jun 2026 |
| Form 5 (FY 2024-2025)File: Form 5 - FY 2024-2025.pdf | 11 Jun 2026 |
| Withdrawal Update Form 1File: F1 June 25.pdf | 27 May 2026 |
| Withdrawal Update Form 1File: F1 June 25.pdf | 27 May 2026 |
| Withdrawal Update Form 1File: F1 Sept 25.pdf | 27 May 2026 |
| Withdrawal Update Form 1File: F1 Dec.pdf | 27 May 2026 |
| Withdrawal Update Form 1File: F1 Mar.pdf | 27 May 2026 |
| Withdrawal Update Form 2File: F2 - Engineer Certificate June 25.pdf | 27 May 2026 |
| Withdrawal Update Form 2File: F2 - Engineer Certificate June 25.pdf | 27 May 2026 |
| Withdrawal Update Form 2File: F2 - Engineer Certificate Sept 25.pdf | 27 May 2026 |
| Withdrawal Update Form 2File: F2 - Engineer Certificate Dec 25.pdf | 27 May 2026 |
| Withdrawal Update Form 2File: F2 - Engineer Certificate Mar 26.pdf | 27 May 2026 |
| Withdrawal Update Form 3File: F3 June 25.pdf | 27 May 2026 |
| Withdrawal Update Form 3File: F3 June 25.pdf | 27 May 2026 |
| Withdrawal Update Form 3File: F3 Sept 25.pdf | 27 May 2026 |
| Withdrawal Update Form 3File: F3 Dec 25.pdf | 27 May 2026 |
| Withdrawal Update Form 3File: F3 Mar 26.pdf | 27 May 2026 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 1 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Dec24.pdf | 24 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Jun24.pdf | 24 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Dec24.pdf | 24 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Dec24.pdf | 24 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Jun24.pdf | 24 Mar 2025 |
| Layout approvalFile: 1.pdf | 13 Dec 2024 |
| Building plan approvalFile: 2.pdf | 13 Dec 2024 |
| Building plan approvalFile: 3.pdf | 13 Dec 2024 |
| Building plan approvalFile: -4.pdf | 13 Dec 2024 |
| Building plan approvalFile: -5.pdf | 13 Dec 2024 |
| Building plan approvalFile: -6.pdf | 13 Dec 2024 |
| Building plan approvalFile: 7.pdf | 13 Dec 2024 |
| Building plan approvalFile: 8.pdf | 13 Dec 2024 |
| Building plan approvalFile: -9.pdf | 13 Dec 2024 |
| Building plan approvalFile: 10.pdf | 13 Dec 2024 |
| Building plan approvalFile: -11.pdf | 13 Dec 2024 |
| Building plan approvalFile: -12.pdf | 13 Dec 2024 |
| Copy of Layout Approval (in case of layout)File: 1.pdf | 13 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 10.pdf | 13 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: -12.pdf | 13 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: -11.pdf | 13 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: -9.pdf | 13 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 8.pdf | 13 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 7.pdf | 13 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: -6.pdf | 13 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: -5.pdf | 13 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: -4.pdf | 13 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 3.pdf | 13 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 2.pdf | 13 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 2024.pdf | 11 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sept 2024.pdf | 11 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sept 2024.pdf | 11 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 2024.pdf | 11 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 2023.pdf | 11 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sept 2023.pdf | 11 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 2023 (From Portal).pdf | 11 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 2023 (From Portal).pdf | 11 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Dec 2022 (From Portal).pdf | 11 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 2022 (From Portal).pdf | 11 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 2022 (From Portal).pdf | 11 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 2023_organized.pdf | 11 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 2023.pdf | 11 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sept 2023.pdf | 11 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 2023.pdf | 11 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 2024_compressed.pdf | 11 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sept 2024.pdf | 11 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 2024.pdf | 11 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept 2024.pdf | 11 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2024.pdf | 11 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 11 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Mar23.pdf | 11 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Jun23.pdf | 11 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Sept 23.pdf | 11 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: 31-07-2024 (From Portal).pdf | 11 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Cir 29 Sept (Downloaded from Portal).pdf | 11 Dec 2024 |
| Declaration about Commencement CertificateFile: Format D.pdf | 11 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sept 2023.pdf | 6 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 12 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 12 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf | 11 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 (2023-24).pdf | 11 Nov 2024 |
| Declaration about Commencement CertificateFile: Format D.pdf | 11 Aug 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 182 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep The Legend Phase II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Opp Shell Petrol Pump13,700+ in Pune
Filed coordinates, straight-line distance. 183 registered projects within 2 km.
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: Shree Sankalp Associates
Shree Sankalp Associates has 2 registrations on MahaRERA, including The Legend and The Legend Phase II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if The Legend Phase II is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of The Legend Phase II?
The registered promoter entity is Shree Sankalp Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in The Legend Phase II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against The Legend Phase II?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for The Legend Phase II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at The Legend Phase II?
The professionals named in the filing: Architect: Sankalp Designers; Engineer: Sandip Haribalak Bhure; Engineer: Vinod Dadaso Kathare; Chartered Accountant: O.S.Chandak & Co.; Chartered Accountant: SPAK & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in The Legend Phase II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback