The Icon Phase 5
By Leading Frontier Private Limited
RG-MH-38985 · RERA P51700033286 · Last updated on MahaRERA portal: 6 May 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
The Icon Phase 5 is a Residential / Group Housing project by Leading Frontier Private Limited in Thane, Maharashtra, registered with MahaRERA as P51700033286 on 15 Feb 2022. Possession is promised by 31 Dec 2026.
At a glance
Project
- NameThe Icon Phase 5
- TypeResidential / Group Housing
- Location
- Highland Garden
- Dhokali
- Thane (M Corp.)
- Thane
- 400607
- Pincode400607
- RERA no.P51700033286
- ReraGenie IDRG-MH-38985
Builder
- NameLeading Frontier Private Limited
- Entity typeCompany
- CINU45309MH2017FTC290088
- CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- Directorzhengxing chen
- Other registrations4 more →
- Completed1 of 5
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on15 Feb 2022
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed55 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Park 3 | NA | 33 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 6 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 86%.
Park 3: 83% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 86% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 31% |
Progress on shared amenities15
As on 6 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed241
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Siddhi Real Estate Developers | Thane (M Corp.) | Thane |
| Gowani Hotel Pvt Ltd | Thane (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Design Consortium |
| Engineer | Mahimtura Consultants Pvt Ltd |
| Chartered Accountant | Ashwin B Shah & Co |
| Partner | Role in project |
|---|---|
| Leading Frontier Private Limited | - |
Litigation declared8
| Case | Court | Status |
|---|---|---|
| 791/2010/2010 | Thane Civil Court | Matter is for evidence of defendants are ongoing next date eight march two thousand nineteen |
| 1868/2016 | Bombay High Court | At admission stage next date second july two thousand nineteen |
| 8595 of 2015 I to R/2015 | Bombay High Court | At admission stage next date twelve July two thousand nineteen |
| 426/2017/2017 | Thane Civil Court | Stage of Matter was for written statement and reply of the Defendants next date sixteenth March Two |
| R CA 65/2017/2017 | Thane Civil Court | Bombay High Court F Y Five Hundred Tow by Two thousand One is disposed and Trfd to Thane High Court |
| 7204 of2016/2016 | Bombay High Court | Does not pertains to Land but pertain to DP road now at admission stage Next date Eleventh March T |
| Before SDO Officer Thane Appeal no202/2018 in Tahasildar Thane 84CC proceeding no 87/2017/2018 | Before Sub Divisional Officer Thane | Tenancy Appeal against Order dated Eighteenth July Two Thousand Eighteen passed in Tahasildar Thane |
| 35982/2018/2018 | Bombay High Court | Writ Petition is filed for quashing the proceedings filed before the Sub Divisional Office Thane bea |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Jan 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Feb 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Jan 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed55
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA CERTIFICATE PHASE 5.pdf | 6 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Phase 5 - Form 3 - 31 March 2024.pdf | 7 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Phase 5 - Form 3 - 30 June 2024.pdf | 7 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Phase 5 - Sept 2024.pdf | 2 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Phase 5 - Dec 2024.pdf | 2 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: phase5.PDF | 30 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: phase 5.pdf | 4 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 PHASE 5 (1).pdf | 22 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA CERTIFICATE FOR PHASE 5.pdf | 1 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PHASE 5 (1) (1).PDF | 5 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2A (Phase5) (Q4 2023).pdf | 5 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase 5_compressed.pdf | 20 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A (Phase-5) (Q3 2023).pdf | 20 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Project Status Phase 5 (1).pdf | 4 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: P3 Rera data 31st March.pdf | 19 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Wing C2.PDF | 18 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form-2A Phase-5.pdf | 18 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase 5.pdf | 17 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 17 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase 5 31-12-2022.pdf | 17 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: RERA DISCLOSURE OF SOLD PH 5.pdf | 17 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase 5 31-12-2022.pdf | 17 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 PH 5 FY 2021-22.pdf | 16 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: phase5_compressed (1).pdf | 10 Nov 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form-2A Phase-5 Q3 2022.pdf | 10 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: Sold Disclosuer Phase - 5.pdf | 10 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: phase 5 (1).PDF | 21 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A P-5 Q2 2022.pdf | 21 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: Sold Disclosuer Phase - 5.pdf | 21 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 P5 Mar - 2022.pdf | 12 May 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form-2A P5 Q1 2022.pdf | 12 May 2022 |
| Disclosure of sold/ booked inventoryFile: Sold Units Phase 5 March 2022.pdf | 10 May 2022 |
| Layout approvalFile: Layout 1-1.pdf | 11 Feb 2022 |
| Layout approvalFile: Layout 1-2.pdf | 11 Feb 2022 |
| Layout approvalFile: 1 Copy of Layout Approval (in case of layout).pdf | 11 Feb 2022 |
| Copy of Layout Approval (in case of layout)File: Layout 1-1.pdf | 11 Feb 2022 |
| Copy of Layout Approval (in case of layout)File: Layout 1-2.pdf | 11 Feb 2022 |
| Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout).pdf | 11 Feb 2022 |
| Proforma of Allotment letterFile: 2 Proforma of the allotment letter and agreement for sale.pdf | 4 Feb 2022 |
| Building plan approvalFile: Building Plans 1.pdf | 27 Jan 2022 |
| Building plan approvalFile: Building Plans 2.pdf | 27 Jan 2022 |
| PAN CardFile: Pan Card.pdf | 27 Jan 2022 |
| Copy of the legal title reportFile: Report 05012022 Final_compressed.pdf | 27 Jan 2022 |
| Details of encumbrancesFile: Encumbrances Phase 5.pdf | 27 Jan 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plans 1.pdf | 27 Jan 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plans 2.pdf | 27 Jan 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Amended CC.pdf | 27 Jan 2022 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf | 27 Jan 2022 |
| Declaration in FORM BFile: Govani Form B Affidavit_compressed.pdf | 27 Jan 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_compressed (1).pdf | 27 Jan 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 27 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: Sold Units Detials.pdf | 27 Jan 2022 |
| CERSAI detailsFile: 12 CERSAI_Search_Report_200227191455_For_Debtor_Based_Search_03_01_2022_11_50_43_274.pdf | 27 Jan 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase 5.pdf | 27 Jan 2022 |
| Proforma of Allotment letterFile: 14 Draft Agreement Phase V Park 3.pdf | 27 Jan 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 4 other registrations, which the RERA portal never shows together
- All 55 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep The Icon Phase 5 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dhokali7,600+ in Thane
Hiranandani Westgate Phase 1
SHODEN DEVELOPERS PRIVATE LIMITED
Forestville - Phase 1
Oberoi Realty Limited
DOSTI WEST COUNTY - PHASE 4- DOSTI PINE
DOSTI ENTERPRISES
Y SQUARE
SHREE MALLINATH ENTERPRISE LLP
Primera
Agile Real Estate Dev Private Limited
UNIQUE VISTAS MHADA BUILDINGNO. 4 5 6 7
MADHU HARSHAD DOSHI
See every Thane project, with the district possession charts
Builder: Leading Frontier Private Limited
Leading Frontier Private Limited has 5 registrations on MahaRERA, including The Icon Phase 1 and The Icon Phase 2. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if The Icon Phase 5 is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of The Icon Phase 5?
The registered promoter entity is Leading Frontier Private Limited, a company as per the filing. Its CIN U45309MH2017FTC290088 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in The Icon Phase 5?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for The Icon Phase 5?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at The Icon Phase 5?
The professionals named in the filing: Architect: Design Consortium; Engineer: Mahimtura Consultants Pvt Ltd; Chartered Accountant: Ashwin B Shah & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in The Icon Phase 5?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.