Home / Browse projects / Thane, Maharashtra / THE ICON PHASE 3

Registered Litigation declared Residential / Group Housing project

THE ICON PHASE 3

By Leading Frontier Private Limited

RG-MH-29783 · RERA P51700029059 · Last updated on MahaRERA portal: 6 May 2025

Source: official MahaRERA filing

Red flags

  • Litigation declared, 9 cases
  • 1 complaint at MahaRERA

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
8 of 11Construction stages donefurthest along: Internal walls, 86%
0 of 221Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 101 documents Report an error

THE ICON PHASE 3 is a Residential / Group Housing project by Leading Frontier Private Limited in Thane, Maharashtra, registered with MahaRERA as P51700029059 on 23 Apr 2021. Possession is promised by 31 Dec 2026. 221 of the 221 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameTHE ICON PHASE 3
  • TypeResidential / Group Housing
  • Location
    • Highland Garden
    • Dhokali
    • Thane (M Corp.)
    • Thane
    • 400607
  • Pincode400607
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700029059
  • ReraGenie IDRG-MH-29783

Builder

  • NameLeading Frontier Private Limited
  • Entity typeCompany
  • CINU45309MH2017FTC290088
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Directorzhengxing chen
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredApr 2021PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Apr 2021
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed101 files

Current status

100%221 of 221 units booked

Figures as on 6 May 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PARK 1NA33302210221

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 86%.

PARK 1: 85% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises86%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.45%

Progress on shared amenities15

As on 6 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed243

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots243
Closed/Covered150
Open Space93

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area643 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Siddhi Real Estate DevelopersThane (M Corp.)Thane
Gowani Hotel Pvt LtdThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI16918.58
Proposed, not sanctioned16,919 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd, Huda Market, Sector-17, Gurgaon, Haryana, 122001

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDesign Consortium
EngineerMahimtura Consultant Pvt Ltd
Chartered AccountantAshwin B Shah & Co
Chartered AccountantKomal K Patel
Chartered AccountantKomal K Patel and Associates
PartnerRole in project
Leading Frontier Private Limited-

Litigation declared9

CaseCourtStatus
Writ Petion No 1868/2016Bombay High CourtAt admission stage Next date Second July Two thousand Nineteen
Civil Suit no 791/2010/2010Thane Civil CourtMatter is for Evidence of Defendants are Ongoing Next date Eight March Two Thousand Nineteen
Writ Petition No 8395 of 2015 I to R/2015Bombay High CourtAt Admission Stage Next Date Twelth July Two Thousand Nineteen
Civil Suit No 426/2017/2017Thane Civil CourtStage of Matter was for written statement and reply of the Defendants next date sixteenth March Two
Thane Court, R C A 65/2017/2017Thane Civil CourtBombay High Court F Y Five Hundred Tow by Two thousand One is disposed and Trfd to Thane High Court
Writ Petition No 7204 of 2016/2016Bombay High CourtDose not pertains to Land but pertain to D P road now at admission stage Next date Eleventh March T
Before SDO Officer Thane Appeal no 202/2018 in Tahasildar Thane 84 CC proceeding no 87/2017/2018Before sub Divisional Officer ThaneTenancy Appeal against Order dated Eighteenth July Two Thousand Eighteen passed in Tahasildar Thane
Civil Writ Petition L No 35982/2018/2018Bombay High CourtWrit Petition is filed for quashing the proceedings filed before the Sun Divisional Office Thane bea
1868/2016Bombay HCClosed

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000500678Leading Frontier Private LimitedMrs. Leena Singh and Mr. Gaurav Vikram Singh10/06/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Apr 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jan 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed101

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: phase 3 leading frontier.pdf6 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Phase 3 - Form 3 - 31 March 2024.pdf7 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Phase 3 - Form 3 - 30 June 2024.pdf7 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Phase 3 - Sept 2024.pdf2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Phase 3 - Dec 2024.pdf2 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: phase 3.PDF30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: phase 3.pdf4 Dec 2024
Disclosure of sold/ booked inventoryFile: phase 3 (1).pdf4 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 PHASE 3 (1).pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA CERTIFICATE FOR PHASE 3.pdf1 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PHASE 3 (1) (1).PDF5 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A (Phase 3) (Q4 2023).pdf5 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase 3.pdf20 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A (Phase-3) (Q3 2023).pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Project Status Phase 3 (1).pdf4 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Project Status Phase 3 (1).pdf4 Sep 2023
Disclosure of sold/ booked inventoryFile: P1 Rera data-31st Mar .pdf19 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Building 1 Wing B2.PDF18 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form-2A Phase-3.pdf18 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase 3.pdf17 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf17 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase 3.pdf17 Jan 2023
Disclosure of sold/ booked inventoryFile: RERA DISCLOSURE OF SOLD PH 3.pdf17 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase 3 31-12-2022.pdf17 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 PH 3 FY 2021-22.pdf16 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: phase3 (1)_compressed.pdf10 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A Phase-3 Q3 2022.pdf10 Nov 2022
Disclosure of sold/ booked inventoryFile: Sold Disclosuer Phase - 3.pdf10 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: phase 3 (1).PDF21 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A P-3 Q2 2022.pdf21 Jul 2022
Disclosure of sold/ booked inventoryFile: Sold Disclosuer Phase - 3.pdf21 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 P3 Mar 2022.pdf11 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 P3 Mar 2022.pdf11 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A P 3 Q1 2022.pdf11 May 2022
Disclosure of sold/ booked inventoryFile: Sold Units Ph 3 March 2022.pdf10 May 2022
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf17 Jan 2022
Layout approvalFile: Layout 1.pdf15 Jan 2022
Layout approvalFile: Layout 2.pdf15 Jan 2022
Layout approvalFile: SHEET-3.pdf15 Jan 2022
Building plan approvalFile: SHEET-17.pdf15 Jan 2022
Building plan approvalFile: SHEET-18.pdf15 Jan 2022
Copy of Layout Approval (in case of layout)File: Layout 1.pdf15 Jan 2022
Copy of Layout Approval (in case of layout)File: Layout 2.pdf15 Jan 2022
Copy of Layout Approval (in case of layout)File: SHEET-3.pdf15 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: SHEET-17.pdf15 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: SHEET-18.pdf15 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: Amended CC dated 07 Jan 2022_EE.pdf15 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase 3 Form 1_compressed.pdf14 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA PHASE 3.pdf14 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 25 Form-2A Phase-3 Q4 2021.pdf14 Jan 2022
CERSAI detailsFile: CERSAI_Search_Report_200227191455_For_Debtor_Based_Search_03_01_2022_11_50_43_274.pdf3 Jan 2022
Declaration about Commencement CertificateFile: Declaration about CC.PDF1 Dec 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1 Phase 3 30-06-21.pdf20 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1 Phase 3 30-09-21.pdf20 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - RERA-PHASE 3 - 30-06-2021.pdf20 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - RERA-PHASE 3 - 30-09-2021.pdf20 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 The Icon Phase 3 30-06-2021.pdf20 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 The Icon Phase 3 30-09-2021.pdf20 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 The Icon Phase 3 30-09-2021.pdf20 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase 3 30 06 21.pdf20 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase 3 30 09 21.pdf20 Oct 2021
Disclosure of sold/ booked inventoryFile: Sold Units Ph 3 13 Oct 21.PDF18 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - RERA-PHASE 3 - 31-06-2021.pdf13 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - RERA-PHASE 3 - 31-09-2021.pdf13 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase 3 - Form 1_compressed.pdf7 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A P-3 Jul-Sep 2021.pdf7 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P3 - Form 1_rotated.pdf26 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A (Phase-3)_compressed.pdf26 Jul 2021
Disclosure of sold/ booked inventoryFile: Sold Units Ph 3 14 July 21-compressed.pdf14 Jul 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: phase 3_compressed.pdf16 Apr 2021
Proforma of Allotment letterFile: Draft Agreement Phase III.pdf16 Apr 2021
Layout approvalFile: Layout 1.pdf15 Apr 2021
Layout approvalFile: Layout 2.pdf15 Apr 2021
Building plan approvalFile: 01-_Page_20_compressed.pdf15 Apr 2021
Building plan approvalFile: 01-_Page_21_compressed.pdf15 Apr 2021
Building plan approvalFile: 01-_Page_22_compressed.pdf15 Apr 2021
PAN CardFile: Pan.pdf15 Apr 2021
Copy of the legal title reportFile: IMG_20210413_0002.pdf15 Apr 2021
Copy of the legal title reportFile: Title 1.pdf15 Apr 2021
Copy of the legal title reportFile: Title 2.pdf15 Apr 2021

How this compares with Thane

100%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THE ICON PHASE 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dhokali7,600+ in Thane

2 kmTHE ICON PHASE 3Completed 168Lapsed / revoked 60Other 135Dot size: filed unitsN

Filed coordinates, straight-line distance. 363 registered projects within 2 km.

Builder: Leading Frontier Private Limited

Leading Frontier Private Limited has 5 registrations on MahaRERA, including The Icon Phase 1 and The Icon Phase 2. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if THE ICON PHASE 3 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE ICON PHASE 3?

The registered promoter entity is Leading Frontier Private Limited, a company as per the filing. Its CIN U45309MH2017FTC290088 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE ICON PHASE 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against THE ICON PHASE 3?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for THE ICON PHASE 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE ICON PHASE 3?

The professionals named in the filing: Architect: Design Consortium; Engineer: Mahimtura Consultant Pvt Ltd; Chartered Accountant: Ashwin B Shah & Co; Chartered Accountant: Komal K Patel; Chartered Accountant: Komal K Patel and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE ICON PHASE 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE ICON PHASE 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE ICON PHASE 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.