Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 108 months
  • 1 extension taken
  • Rs 100.00 crore secured on the land, in favour of KOTAK MAHINDRA BANK LIMITED

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2031Possession promisedmoved 108 months from the original
2 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 0%
473 of 473Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 236 documents Report an error

THE HELIOS is a Residential / Group Housing project by RAJ LAXMI DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700001555 on 28 Jul 2017. Possession is promised by 31 Dec 2031. The completion date has moved by 108 months from the original filing. 0 of the 473 units on this registration are recorded sold or booked, and 2 of 22 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameTHE HELIOS
  • TypeResidential / Group Housing
  • Location
    • Kolshet Road
    • Kolshet
    • Thane (M Corp.)
    • Thane
    • 400607
  • Pincode400607
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700001555
  • ReraGenie IDRG-MH-12423

Builder

  • NameRAJ LAXMI DEVELOPERS
  • Entity typePartnership
  • PartnersANURADHA NAYAN SHAH, ANAY NAYAN SHAH, ADITYA NAYAN SHAH, KUSHAL ASHWIN VASAVDA, NAYAN ARVIND SHAH, ASHWIN LAXMIKANT VASAVDA, KIRAN HUNDRAJ MUKHI, MEHUL LAXMIKANT VASAVDA
  • Other registrations3 more →
  • Completed2 of 4
  • Declared earlier projects2 →

Key dates

this monthRegisteredJul 2017First promiseDec 2022Revised toDec 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Jul 2017
  • Promised completion31 Dec 2031
  • Revised completionRevised to 31 Dec 2031 (originally 31 Dec 2022)
  • Buildings2 building records
  • Documents filed236 files

Current status

0%0 of 473 units booked
8.1%Work done, per cost certificate

Figures as on 6 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building 1NA43404680468
Building No 2NA65055

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 6 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 0%.

Building 19%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 29%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed764

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots764
Closed/Covered764
BuildingClosed/CoveredTotal
Building 1627627
Building No 2137137

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area7,320 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofKOTAK MAHINDRA BANK LIMITED
Secured amountRs 100.00 crore
Declared on3 Oct 2025

Approvals and building plan

Sanctioning authorityTHANE MUNICIPAL CORPORATION
Permissible FSI34511.88
Proposed, not sanctioned32,645 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKOTAK MAHINDRA BANK LTD, 18, LODHA AMARA MLCP RETAIL, KOLSHET ROAD, THANE WEST - 400607. MAHARASHTRA
Estimated costRs 200.00 cr
Cost incurredRs 16.18 cr
Work done8.09%
BuildingWingEstimatedIncurred
Building 1NARs 189.00 crRs 16.18 cr
Building No 2NARs 11.00 cr-

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJAI MISTRY
ArchitectANIL JAGWANI
EngineerSanjeev Basavantappa Tigadi
EngineerRATNAKAR NAMDEVRAO DEVADE
EngineerSameer Satish Kasegaonkar
EngineerJagabandhu Jogi Dalai
Chartered AccountantJ P M S & Associates LLP
Chartered AccountantASHISH RAMAVATAR KUMAWAT
Chartered AccountantM/S M.D.DUMASIA & CO
PartnerRole in project
RAJ LAXMI DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700023043Dec 2022 → Dec 2031

Reason as filed by the promoterWe are Re-launching Project as there were approval issues and we have not sold any inventory as such.

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000195683ANIL DAHAKE & ANRRAJ LAXMI DEVELOPERS & ORS.18/01/2021
CC006000000197253PARUL PRAKASH MEHTARAJ LAXMI DEVELOPERS AND OTHERS18/06/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Aug 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Aug 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2031

Documents filed236

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 236 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Q4.pdf6 Jun 2026
Withdrawal Update Form 2File: Form 2 Q4.pdf6 Jun 2026
Withdrawal Update Form 3File: Form 3 Q4_compressed.pdf6 Jun 2026
Withdrawal Update Form 1File: Form 1 Q4.pdf28 Apr 2026
Withdrawal Update Form 2File: Form 2 Q4.pdf28 Apr 2026
Withdrawal Update Form 3File: Form 3 Q4_compressed.pdf28 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf23 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf23 Jan 2026
Withdrawal Update Form 3File: Form 3_compressed.pdf23 Jan 2026
Withdrawal Update Form 1File: FORM 1.pdf29 Oct 2025
Withdrawal Update Form 2File: FORM 2.pdf29 Oct 2025
Withdrawal Update Form 3File: FORM 3_compressed.pdf29 Oct 2025
Form 5 (FY 2024-2025)File: Form 5- RLD System Generated - 24-25- to be uploaded.pdf20 Sep 2025
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE20250822_13383228.pdf23 Aug 2025
Withdrawal Update Form 2File: ENGINEER CERTIFICATE20250822_13325255.pdf23 Aug 2025
Withdrawal Update Form 3File: Form 3.pdf23 Aug 2025
Form 1File: Form 1.pdf18 Jul 2025
Form 2File: Form 2.pdf18 Jul 2025
Form 3File: Form 3_compressed.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD Inventory_Signed.pdf18 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A Sysytem Generated - RLD Signed.pdf30 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf21 Apr 2025
Certificates of CA (Form 3)File: FORM 3.pdf21 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold,Booked Inventory.pdf21 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf16 Apr 2025
Certificates of CA (Form 3)File: FORM-3.pdf16 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2.pdf16 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold,Booked Inventory.pdf16 Apr 2025
Details of encumbrances concerned to FinanceFile: Financial Encumbrance - 04-03-2025_compressed.pdf4 Mar 2025
Details of encumbrances concerned to LegalFile: Financial Encumbrance - 04-03-2025_compressed.pdf4 Mar 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: 5 Format A Declaration about Separate Bank Account.pdf13 Feb 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: 5 Format A Declaration about Separate Bank Account.pdf13 Feb 2025
Declaration about Commencement CertificateFile: Declaration about CC - 02022024.pdf29 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect 31122024.pdf20 Jan 2025
Certificates of CA (Form 3)File: Form 3 RLD Q-3_compressed.pdf20 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer 31122024_compressed.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold - Booked Inventory as on 31-12-24.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold - Booked Inventory as on 31-09-24.pdf16 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RLD Form 5 FY 202324.pdf30 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate September 2024 quarterly .pdf30 Oct 2024
Certificates of CA (Form 3)File: CA certificate September-compressed (1).pdf30 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate September 2024 quarterly _compressed.pdf30 Oct 2024
Form 5 (FY 2023-2024)File: form 5.pdf30 Sep 2024
Layout approvalFile: HELIOS Approved Plan Page No 1 02 Feb 2024.pdf12 Aug 2024
Building plan approvalFile: LOI - 08 Nov 2023.pdf12 Aug 2024
Building plan approvalFile: Plan Page 1-2.pdf12 Aug 2024
Building plan approvalFile: Plan Pg 3-5A.pdf12 Aug 2024
Building plan approvalFile: Plan Pg 6.pdf12 Aug 2024
Building plan approvalFile: Plan Pg 7.pdf12 Aug 2024
Building plan approvalFile: Plan Pg 8-9.pdf12 Aug 2024
Copy of Layout Approval (in case of layout)File: HELIOS Approved Plan Page No 1 02 Feb 2024.pdf12 Aug 2024
Building Plan Approval (IOD)File: LOI - 08 Nov 2023.pdf12 Aug 2024
Building Plan Approval (IOD)File: Plan Page 1-2.pdf12 Aug 2024
Building Plan Approval (IOD)File: Plan Pg 3-5A.pdf12 Aug 2024
Building Plan Approval (IOD)File: Plan Pg 6.pdf12 Aug 2024
Building Plan Approval (IOD)File: Plan Pg 7.pdf12 Aug 2024
Building Plan Approval (IOD)File: Plan Pg 8-9.pdf12 Aug 2024
Declaration in FORM BFile: Form B.pdf26 Jul 2024
Declaration in FORM BFile: Form B.pdf25 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of inventory 25072024_compressed.pdf25 Jul 2024
Certificates of CA (Form 3)File: Form 3 Q1 2024-25_compressed.pdf25 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: CC 02022024.pdf19 Jul 2024
Declaration about Commencement CertificateFile: CC declaration.pdf19 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate RLD 30062024.pdf19 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate_RLD_30062024.pdf19 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 01 Quality Assurance Certificate Form 2A RLD_31032020.pdf19 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 02 Quality Assurance Certificate Form 2A RLD_31032021.pdf19 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 03 Quality Assurance Certificate Form 2A RLD_31032022.pdf19 Jul 2024
Disclosure of sold/ booked inventoryFile: Helios Disclosure of Sold Inventory 30062024.pdf19 Jul 2024
Certificates of CA (Form 3)File: Form 3 Q2 2023-24.pdf19 Jul 2024
Certificates of CA (Form 3)File: Form 3 Q3 2023-24.pdf19 Jul 2024
Certificates of CA (Form 3)File: Form 3 Q4 2023-24_compressed.pdf19 Jul 2024
Certificates of CA (Form 3)File: Form 3 Q1 2024-25_compressed.pdf19 Jul 2024
Details of encumbrances concerned to FinanceFile: Legal encumbrance.pdf18 Jul 2024
Details of encumbrances concerned to LegalFile: Legal encumbrance.pdf18 Jul 2024
CERSAI detailsFile: CERSAI declaration.pdf18 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A Bank Declaration.pdf18 Jul 2024
Declaration in FORM BFile: Correct Form B.pdf18 Jun 2024
PAN CardFile: PAN CARD.pdf29 May 2024

How this compares with Thane

0%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 108 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THE HELIOS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kolshet7,600+ in Thane

2 kmTHE HELIOSCompleted 163Lapsed / revoked 56Other 100Dot size: filed unitsN

Filed coordinates, straight-line distance. 319 registered projects within 2 km.

Builder: RAJ LAXMI DEVELOPERS

RAJ LAXMI DEVELOPERS has 4 registrations on MahaRERA, including THE HELIOS and SHREEJI ICONIC PHASE I. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if THE HELIOS is delayed beyond 31 Dec 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE HELIOS?

The registered promoter entity is RAJ LAXMI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE HELIOS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against THE HELIOS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for THE HELIOS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE HELIOS?

The professionals named in the filing: Architect: JAI MISTRY; Architect: ANIL JAGWANI; Engineer: Sanjeev Basavantappa Tigadi; Engineer: RATNAKAR NAMDEVRAO DEVADE; Engineer: Sameer Satish Kasegaonkar; Engineer: Jagabandhu Jogi Dalai. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE HELIOS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE HELIOS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE HELIOS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.