ReraGenieLog inGet a buyer report

Home / Browse projects / Osmanabad, Maharashtra / THE GRAND PADMAKSH PHASE 2

Registration lapsed No litigation declared Residential / Group Housing project

THE GRAND PADMAKSH PHASE 2

By M/S PADMAJA DEVELOPERS

RG-MH-38643 · RERA P52500025553 · Last updated on MahaRERA portal: 10 Feb 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 32 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Osmanabad registration emailed to you, free during the pilot beta.
Feb 2024Possession promised32 months past this date
0 of 11Construction stages donefurthest along: Slabs of Super Structure, 37%
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

THE GRAND PADMAKSH PHASE 2 is a Residential / Group Housing project by M/S PADMAJA DEVELOPERS in Osmanabad, Maharashtra, registered with MahaRERA as P52500025553 on 28 Jun 2020. Possession was promised by 29 Feb 2024 and is now 32 months past that date.

At a glance

Project

  • NameTHE GRAND PADMAKSH PHASE 2
  • TypeResidential / Group Housing
  • Location
    • SB Road
    • Padmavati Nagar
    • Osmanabad
    • 413501
  • Pincode413501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52500025553
  • ReraGenie IDRG-MH-38643

Builder

  • NameM/S PADMAJA DEVELOPERS
  • Entity typePartnership
  • PartnersROHIT SHASHIKANT NIMBALKAR, PADMAJA SHASHIKANT NIMBALKAR
  • Other registrations2 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

32 months past promisethis monthRegisteredJun 2020PromisedFeb 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on28 Jun 2020
  • Promised completion29 Feb 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed73 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
THE ROYAL ORCHIDNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 37%.

THE ROYAL ORCHID: 9% average across the applicable activities

ActivityProgress
Excavation1%
Basement (if any)3%
Podiums (if any)0%
Plinth3%
Stilt Floor0%
Slabs of Super Structure37%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises28%
Sanitary Fittings within the flats / premises6%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks1%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.16%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.9%

Progress on shared amenities16

As on 10 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes91%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Other CC TV Main Gate and Compound wallYes100%

Parking filed28

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots28
Closed/Covered28

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,538 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4371.5
Proposed, not sanctioned4,372 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNear Central Building, Osmanabad

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSajjad Lodhi
EngineerMohammad Faizuddin
Chartered AccountantGokul R Bharadiya
PartnerRole in project
M/S PADMAJA DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Jun 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Jun 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Jun 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Jun 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4-Phase 2 - Form 1- Date - 04-04-2024.pdf10 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1-Phase 2 - Form 1 - Date - 04-07-2024.pdf10 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2-Phase 2 - Form 1 - Date - 04-10-2024.pdf10 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3-Phase 2 - Form 1- Date - 04-01-2025.pdf10 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4 Phase-2 Form 3-2023-24.pdf10 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1 Phase 2 Form 3-2024-25.pdf10 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 Phase 2 Form 3-2024-25.pdf10 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3 Phase -2 Form 3-2024-25.pdf10 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4 Phase 2- Form-2 Date - 04-04-24.pdf10 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1 Phase-2 Form 2 Date - 04-07-2024.pdf10 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2 Phase -2 Form 2 -Date -04-10-2024.pdf10 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3 Please 2- Form 2 - Date- 04-01-2025.pdf10 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Phase -2 Form 2A- Date- 04-01-2025.pdf10 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Phase 2 2324.pdf10 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf15 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf15 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf15 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf15 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf15 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf15 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf15 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf15 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf15 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf15 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf15 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf15 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf15 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf15 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Phase-2 Form2A- 04-04-2023.pdf15 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 01 Phase-2 Q1-2022-23.pdf15 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 02 Phase-2 Q2-2022-23.pdf15 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 03 Phase-2 Q3-2022-23.pdf15 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 04 Phase-2 Q4-2022-23.pdf15 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 05 Phase-2 Q1-2023-24.pdf15 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 06 Phase-2 Q2-2023-24.pdf15 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 07 Phase -2 Q3-2023-24_compressed.pdf15 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Phase 2.pdf15 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Phase 2.pdf15 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form Q2 20-21.pdf15 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form Q3 20-21.pdf15 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 20-21.pdf15 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1 21-22.pdf15 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2 21-22.pdf15 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 2 Q3 2021-2022.pdf15 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 -2021-2022.pdf15 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2 20-21.pdf15 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3 20-21.pdf15 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4 20-21.pdf15 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1 21-22.pdf15 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Q2 21-22.pdf15 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3 21-22.pdf15 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4 21-22.pdf15 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Year 2020-2021.pdf15 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Year 21-22.pdf15 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 2020-2021.pdf15 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3 2020-2021.pdf15 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4 2020-2021.pdf15 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1 2021-2022.pdf15 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 2021-2022.pdf15 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3 2021-2022.pdf15 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4 2021-2022.pdf15 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 2020-2021 Phase 2 Signed.pdf15 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 2021-2022 Phase 2 Signed.pdf15 Apr 2023
Declaration in FORM BFile: Form b.pdf10 Jun 2020
Layout approvalFile: Layout small file.pdf9 Jun 2020
Building plan approvalFile: Building Plan Approval.pdf9 Jun 2020
Copy of the legal title reportFile: Legal title report.pdf9 Jun 2020
Details of encumbrancesFile: Encumbrance Detail.pdf9 Jun 2020
Copy of Layout Approval (in case of layout)File: Layout small file.pdf9 Jun 2020
Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval.pdf9 Jun 2020
Commencement Certificates / NA Order for plotted developmentFile: Building Premission.pdf9 Jun 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf9 Jun 2020
Proforma of Allotment letterFile: Allottment Lette and Agreement for sale.pdf9 Jun 2020

How this compares with Osmanabad

10%of Osmanabad projects moved their completion datethis one has not
22%of Osmanabad registrations have lapsed or been cancelledthis one is among them

Computed across the 48 Osmanabad projects on ReraGenie, from their own filings.

Keep THE GRAND PADMAKSH PHASE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Padmavati Nagar48 in Osmanabad

2 kmTHE GRAND PADMAKSH PHASELapsed / revoked 1Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 3 registered projects within 2 km.

Builder: M/S PADMAJA DEVELOPERS

M/S PADMAJA DEVELOPERS has 3 registrations on MahaRERA, including THE GRAND PADMAKSH PHASE 1 and THE GRAND PADMAKSH PHASE 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Osmanabad district page.

Frequently asked questions

What does it mean that THE GRAND PADMAKSH PHASE 2 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if THE GRAND PADMAKSH PHASE 2 is delayed beyond 29 Feb 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE GRAND PADMAKSH PHASE 2?

The registered promoter entity is M/S PADMAJA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE GRAND PADMAKSH PHASE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE GRAND PADMAKSH PHASE 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE GRAND PADMAKSH PHASE 2?

The professionals named in the filing: Architect: Sajjad Lodhi; Engineer: Mohammad Faizuddin; Chartered Accountant: Gokul R Bharadiya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE GRAND PADMAKSH PHASE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE GRAND PADMAKSH PHASE 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE GRAND PADMAKSH PHASE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.