Home / Browse projects / Osmanabad, Maharashtra / THE GRAND PADMAKSH PHASE 1

Registered No litigation declared Residential / Group Housing project

THE GRAND PADMAKSH PHASE 1

By M/S PADMAJA DEVELOPERS

RG-MH-08838 · RERA P52500022520 · Last updated on MahaRERA portal: 10 Feb 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Osmanabad registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
0 of 66Construction stages doneacross 6 buildings; furthest along: Excavation, 69%
1Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

THE GRAND PADMAKSH PHASE 1 is a Residential / Group Housing project by M/S PADMAJA DEVELOPERS in Osmanabad, Maharashtra, registered with MahaRERA as P52500022520 on 30 Sep 2019. Possession is promised by 30 Mar 2027. 1 complaint is on record with the regulator.

At a glance

Project

  • NameTHE GRAND PADMAKSH PHASE 1
  • TypeResidential / Group Housing
  • Location
    • Next to Suryoday Nagar
    • Padmavati Nagar
    • Osmanabad
    • 413501
  • Pincode413501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52500022520
  • ReraGenie IDRG-MH-08838

Builder

  • NameM/S PADMAJA DEVELOPERS
  • Entity typePartnership
  • PartnersROHIT SHASHIKANT NIMBALKAR, PADMAJA SHASHIKANT NIMBALKAR
  • Other registrations2 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredSep 2019PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on30 Sep 2019
  • Promised completion30 Mar 2027
  • Revised completionNone
  • Buildings6 building records
  • Documents filed89 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
The Golden SunnivaNA500000
The Golden SunnivaNA00000
THE SILVER TIATANIANA00000
THE SILVER TIATANIANA00000
The Golden SunnivaNA00000
The Golden SunnivaNA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 10 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Excavation, at 69%.

The Golden Sunniva45%
ActivityProgress
Excavation69%
Basement (if any)69%
Podiums (if any)0%
Plinth69%
Stilt Floor0%
Slabs of Super Structure69%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises44%
Sanitary Fittings within the flats / premises46%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks54%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.39%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.39%
The Golden Sunniva0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
THE SILVER TIATANIA0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
THE SILVER TIATANIA0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
The Golden Sunniva0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
The Golden Sunniva0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 10 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes48%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes19%
Street LightingYes100%
Community BuildingsYes11%
Treatment And Disposal Of Sewage And Sullage WaterYes44%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes44%
Energy managemcntYes100%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Others CCTV Main gate and compound wallYes58%

Parking filed25

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots25
Closed/Covered25

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,257 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3158.92
Proposed, not sanctioned3,159 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBhanu Nagar

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLodhi Sajjad & Associates
EngineerMohammad Faizuddin
Chartered AccountantGokul R Bharadiya
PartnerRole in project
M/S PADMAJA DEVELOPERS-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12500139Mrinal KatkarM/S PADMAJA DEVELOPERS22/09/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Sep 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Mar 2027

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4-Phase 1 Form 1 -Date - 04-04-2024.pdf10 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1-Phase 1 Form 1 - Date - 04-07-2024.pdf10 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2-Phase 1 Form 1- Date -04-10-2024.pdf10 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3-Phase 1 Form 1 - Date- 04-01-2025.pdf10 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4 Phase1 Form3-2023-24.pdf10 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1 Phase1 Form3-2024-25.pdf10 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 Phase1 Form3-2024-25.pdf10 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3 Phase1 Form3-2024-25.pdf10 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4 Phase 1- Form 2- Date- 04-04-2024.pdf10 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1 Phase 1 - Form 2 Date- 04-07-2024.pdf10 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2 Phase 1- Form 2- Date - 04-10-2024.pdf10 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3 Phase 1 - Form-2 - Date- 04-01-2025.pdf10 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Phase -1 Form 2A- Date - 04-01-2025.pdf10 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Phase 1 2324.pdf10 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf15 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf15 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf15 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf15 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf15 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf15 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf15 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2.pdf15 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf15 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf15 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf15 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf15 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf15 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf15 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Phase -1Form 2A- 04-04-2023.pdf15 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 01 phase -1 Q-1- 2022-23.pdf15 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 02 Phase -1-Q2-2022-23.pdf15 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 03 phase 1-Q3-2022-23.pdf15 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 04 phase 1-Q4-2022-23.pdf15 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 05 phase 1-Q1-2023-24.pdf15 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 06 phase 1-Q2-2023-24.pdf15 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 07 Phase 1-Q3-2023-24.pdf15 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Phase 1.pdf15 Mar 2024
Layout approvalFile: Layout.pdf15 Apr 2023
Building plan approvalFile: Building Plan.pdf15 Apr 2023
Copy of Layout Approval (in case of layout)File: Layout.pdf15 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Building Plan.pdf15 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf15 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3 19-20.pdf15 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 02 Form 1 Q4 19-20.pdf15 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 03 Form 1 Q1 20-21.pdf15 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 04 Form 1 Q2 20-21.pdf15 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 05 Form 1 Q3 20-21.pdf15 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 06 Form 1 Q4 20-21.pdf15 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 07 Form 1 Q1 21-22.pdf15 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 08 Form 1 Q2 21-22.pdf15 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 09 Form 1 Q3 21-22.pdf15 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 Form 1 Q4 21-22.pdf15 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3 2019-2020.pdf15 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4-2019-2020.pdf15 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q-1-2020-2021.pdf15 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Q2 20-21.pdf15 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form Q3-2020-2021.pdf15 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4 20-21.pdf15 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1 21-22.pdf15 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2-2021-2022.pdf15 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3-2021-2022.pdf15 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4 2021-2022.pdf15 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Year 2019-2020.pdf15 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Year 2020-2021.pdf15 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Year 2021-2022.pdf15 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4 2019-2020.pdf15 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1 2020-2021.pdf15 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 2020-2021.pdf15 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3 2020-2021.pdf15 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4 2020-2021.pdf15 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1 2021-2022.pdf15 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 2021-2022.pdf15 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3 2021-2022.pdf15 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4 2021-2022.pdf15 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 2019-2020 Phase 1 Signed (1).pdf15 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 2020-2021 Phase 1 Signed.pdf15 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 2021-2022 Phase 1 Signed.pdf15 Apr 2023
Details of Restarting of Construction work post lockdownFile: COVID 19 PLAN.pdf16 Jun 2020
Layout approvalFile: Joint layout for rera.pdf25 Sep 2019
Copy of Layout Approval (in case of layout)File: Joint layout for rera.pdf25 Sep 2019

How this compares with Osmanabad

10%of Osmanabad projects moved their completion datethis one has not
22%of Osmanabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 48 Osmanabad projects on ReraGenie, from their own filings.

Keep THE GRAND PADMAKSH PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Padmavati Nagar48 in Osmanabad

2 kmTHE GRAND PADMAKSH PHASELapsed / revoked 2Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 3 registered projects within 2 km.

Builder: M/S PADMAJA DEVELOPERS

M/S PADMAJA DEVELOPERS has 3 registrations on MahaRERA, including THE GRAND PADMAKSH PHASE 1 and THE GRAND PADMAKSH PHASE 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Osmanabad district page.

Frequently asked questions

What are my rights if THE GRAND PADMAKSH PHASE 1 is delayed beyond 30 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE GRAND PADMAKSH PHASE 1?

The registered promoter entity is M/S PADMAJA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE GRAND PADMAKSH PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against THE GRAND PADMAKSH PHASE 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for THE GRAND PADMAKSH PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE GRAND PADMAKSH PHASE 1?

The professionals named in the filing: Architect: Lodhi Sajjad & Associates; Engineer: Mohammad Faizuddin; Chartered Accountant: Gokul R Bharadiya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE GRAND PADMAKSH PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE GRAND PADMAKSH PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE GRAND PADMAKSH PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.