ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / THE ERICA

Registered No litigation declared Residential / Group Housing project

THE ERICA

By HINDUSTAN REALTY LIMITED

RG-MH-17751 · RERA P51800056166 · Last updated on MahaRERA portal: 27 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 19 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jul 2028Possession promisedmoved 19 months from the original
11 of 11Construction stages doneevery applicable stage filed complete
51 of 70Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

THE ERICA is a Residential / Group Housing project by HINDUSTAN REALTY LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800056166 on 16 May 2024. Possession is promised by 31 Jul 2028. The completion date has moved by 19 months from the original filing. 19 of the 70 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • NameTHE ERICA
  • TypeResidential / Group Housing
  • Location
    • DEVIDAS ROAD
    • Eksar
    • Borivali
    • Mumbai Suburban
    • 400103
  • Pincode400103
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800056166
  • ReraGenie IDRG-MH-17751

Builder

  • NameHINDUSTAN REALTY LIMITED
  • Entity typeCompany
  • GSTIN27AADCH1846H1ZM
  • Managing DirectorRAJESH VASANTRAY DOSHI
  • DirectorsKUNJAL C DEDHIA, BHAVNA RAJESH DOSHI, VIJAY M GADHIA

Key dates

this monthRegisteredMay 2024First promiseDec 2026Revised toJul 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 May 2024
  • Promised completion31 Jul 2028
  • Revised completionRevised to 31 Jul 2028 (originally 31 Dec 2026)
  • Buildings1 building record
  • Documents filed87 files

Current status

27%19 of 70 units booked
60.4%Work done, per cost certificate

Figures as on 27 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
THE ERICANA191870070

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

THE ERICA: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 27 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed93

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots93
Closed/Covered93

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,605 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Sep 2025
LandownerVillageDistrict
DATTA DHAM CO-OP HSG SOC LTDBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI5415.39
Proposed, not sanctioned5,415 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRokadiya lane, Borivali West branch, Mumbai Sub Urban-400092
Estimated costRs 30.00 cr
Cost incurredRs 18.11 cr
Work done60.36%
BuildingWingEstimatedIncurred
THE ERICANARs 27.00 crRs 18.11 cr
-NARs 3.00 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectASHOK GANDHI CONSULTANTS LLP
ArchitectV M Associates
EngineerAmrut A. Dandekar
EngineerV M ASSOCIATES
Chartered AccountantPUNIT B GUPTA & ASSOCIATES
Chartered AccountantTMG & ASSOCIATES
PartnerRole in project
HINDUSTAN REALTY LIMITED-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800019820Dec 2026 → Mar 2028

Reason as filed by the promoterWE WANT TO EXTEND PROJECT TIMELINE TILL 31/03/2028

P51800056166/WarDec 2026 → Jul 2028

Reason as filed by the promoterNA

Litigation declared1

CaseCourtStatus
1832/2023/2023CITY CIVIL COURT DINDOSHI MUMBAI MUMBAI CITY CIVIL COURTPLAINTIFF AND HIS ADVOCATE ABSENT ADVP G CHUDASAMA FOR DEF PRESENT MATTTER IS ADJOURNED FOR HEARING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jul 2028

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE 30-06-2026.pdf27 Jul 2026
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE 30-06-2026.pdf27 Jul 2026
Withdrawal Update Form 3File: FROM 3 CA CERTIFICATE 30-06-2026.pdf27 Jul 2026
Withdrawal Update Form 1File: Form 1 31-03-2026.pdf21 Apr 2026
Withdrawal Update Form 2File: Form 2 31-03-2026.pdf21 Apr 2026
Withdrawal Update Form 3File: Form 3 31-03-2026.pdf21 Apr 2026
Form 2A (FY 2025-2026)File: FORM 2A 2025-2026.pdf21 Apr 2026
Form 5 (FY 2025-2026)File: Form 5 2025-2026.pdf21 Apr 2026
Form 1File: FORM 1 - 31-12-2025.pdf20 Jan 2026
Form 2File: FORM 2 - 31-12-2025.pdf20 Jan 2026
Form 3File: FORM 3 31-12-2025.pdf20 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY - 31-12-2025.pdf20 Jan 2026
Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf31 Oct 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf31 Oct 2025
Form 3File: FORM 3 CA CRTIFICATE.pdf31 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD.pdf31 Oct 2025
Form 2A (FY 2024-2025)File: FORM 2A - 2024-25.pdf3 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 - 2024-25.pdf3 Oct 2025
Form 1File: Architect's Certificate.pdf22 Jul 2025
Form 2File: Engineer Certificate.pdf22 Jul 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD - UNSOLD INVENTORY.pdf22 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf22 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: The Erica Form 3- Quarter 2.pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: The Erica -Form 3 Quarter -3.pdf25 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf25 Jan 2025
Other - FinanceFile: Clarification of Inventory Letter (1).pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12th Slab Rera Architect Certificate- Signed.pdf22 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf18 Jan 2025
Layout approvalFile: PLANS_1-1.pdf21 Oct 2024
Building plan approvalFile: PLAN 02.pdf21 Oct 2024
Building plan approvalFile: PLAN 03.pdf21 Oct 2024
Building plan approvalFile: PLAN 04.pdf21 Oct 2024
Building plan approvalFile: Plan 05.pdf21 Oct 2024
Copy of Layout Approval (in case of layout)File: PLANS_1-1.pdf21 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf21 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN 02.pdf21 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN 03.pdf21 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN 04.pdf21 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 05.pdf21 Oct 2024
Declaration about Commencement CertificateFile: CC DECL.pdf21 Oct 2024
Declaration in FORM BFile: Form B (2).pdf22 May 2024
Details of encumbrances concerned to FinanceFile: LEGAL FINANCE MERGED.pdf22 Apr 2024
Details of encumbrances concerned to LegalFile: LEGAL FINANCE MERGED.pdf22 Apr 2024
Other - FinanceFile: Clarification letter for Erica.pdf11 Apr 2024
Building plan approvalFile: 2.pdf10 Apr 2024
Building plan approvalFile: 3.pdf10 Apr 2024
Building plan approvalFile: 4.pdf10 Apr 2024
Building plan approvalFile: 5.pdf10 Apr 2024
Building plan approvalFile: 6.pdf10 Apr 2024
Building plan approvalFile: 7.pdf10 Apr 2024
Building plan approvalFile: 8.pdf10 Apr 2024
Building plan approvalFile: 9.pdf10 Apr 2024
Building plan approvalFile: 10.pdf10 Apr 2024
Building plan approvalFile: 11.pdf10 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf10 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf10 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf10 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf10 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf10 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 7.pdf10 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 8.pdf10 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 9.pdf10 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 10.pdf10 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 11.pdf10 Apr 2024
Other - TechnicalFile: Annex - A ORDER NO 50 OF 2024.pdf10 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE (2) (1).pdf2 Apr 2024
Building plan approvalFile: IOD_signed.pdf30 Mar 2024
Layout approvalFile: 1.pdf30 Mar 2024
Details of encumbrances concerned to FinanceFile: FINANCE LEGAL.pdf30 Mar 2024
Details of encumbrances concerned to LegalFile: FINANCE LEGAL.pdf30 Mar 2024
Copy of Layout Approval (in case of layout)File: 1.pdf30 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD_signed.pdf30 Mar 2024
Declaration about Commencement CertificateFile: Declaration about CC.pdf30 Mar 2024
Proforma of Agreement for saleFile: PROFRMA AGREEMENT FOR SALE - RERA-THE ERICA- Reviewed by PAPATIL 26th March (1).pdf30 Mar 2024
Proforma of Allotment letterFile: Proforma Of Allotment_compressed.pdf30 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Decalaration for Bank Ac.pdf30 Mar 2024
Copy of the legal title reportFile: Legal Title Report final.pdf16 Mar 2024
Declaration in FORM BFile: Form B (1).pdf9 Mar 2024

How this compares with Mumbai Suburban

27%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 19 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THE ERICA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DEVIDAS ROAD6,700+ in Mumbai Suburban

2 kmTHE ERICACompleted 160Lapsed / revoked 95Other 209Dot size: filed unitsN

Filed coordinates, straight-line distance. 464 registered projects within 2 km.

Builder: HINDUSTAN REALTY LIMITED

HINDUSTAN REALTY LIMITED has 1 registration on MahaRERA, including THE ERICA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if THE ERICA is delayed beyond 31 Jul 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE ERICA?

The registered promoter entity is HINDUSTAN REALTY LIMITED, a company as per the filing. Its GSTIN 27AADCH1846H1ZM can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE ERICA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE ERICA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE ERICA?

The professionals named in the filing: Architect: ASHOK GANDHI CONSULTANTS LLP; Architect: V M Associates; Engineer: Amrut A. Dandekar; Engineer: V M ASSOCIATES; Chartered Accountant: PUNIT B GUPTA & ASSOCIATES; Chartered Accountant: TMG & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE ERICA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE ERICA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE ERICA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.