The Epicentre

By Wadhwa and Associates Project Developers Private Limited

RG-MH-28267 · RERA P51800025299 · Last updated on MahaRERA portal: 17 Aug 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 24 months from the original
16 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 71%
152 of 420Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 107 documents Report an error

The Epicentre is a Commercial project by Wadhwa and Associates Project Developers Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800025299 on 5 Apr 2020. Possession is promised by 31 Dec 2028. The completion date has moved by 24 months from the original filing. 268 of the 420 units on this registration are recorded sold or booked, and 16 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameThe Epicentre
  • TypeCommercial
  • Location
    • G Block Plot C59
    • Bandra Kurla Complex
    • Kurla
    • Mumbai Suburban
    • 400088
  • Pincode400088
  • RERA no.P51800025299
  • ReraGenie IDRG-MH-28267

Builder

  • NameWadhwa and Associates Project Developers Private Limited
  • Entity typeCompany
  • DirectorNavin Amarlal Makhija Amarlal Makhija
  • Declared earlier projects1 →

Key dates

this monthRegisteredApr 2020First promiseDec 2026Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Apr 2020
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 30 Dec 2026)
  • Buildings2 building records
  • Documents filed107 files

Current status

64%268 of 420 units booked
79.5%Work done, per cost certificate

Figures as on 17 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
The Epicenter commercial officesNA25140418418
The Epicenter RetailNA22022

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 17 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 71%.

The Epicenter commercial offices88%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure71%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
The Epicenter Retail64%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 17 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes90%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed390

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots390
Closed/Covered390

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,201 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityBMC
Permissible FSI38957.0
Proposed, not sanctioned6,479 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC Bank, Badra East, Mumbai
Estimated costRs 190.24 cr
Cost incurredRs 151.24 cr
Work done79.5%
BuildingWingEstimatedIncurred
The Epicenter commercial officesNARs 180.73 crRs 141.89 cr
-NARs 9.51 crRs 9.36 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKapadia Associates
EngineerMahimtura Consultants Pvt Ltd
EngineerMillion Jobs Private Limited
EngineerKamlesh Gurav
Chartered AccountantGMJ & Co
Chartered AccountantRMA & Co LLP
Chartered AccountantS M Bhat and Associates
PartnerRole in project
Wadhwa and Associates Project Developers Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA03042620544Dec 2026 → Dec 2028

Reason as filed by the promoterhe project “The Epicentre” at Chembur, Mumbai was originally planned as Basement + Ground + Podium + 20 upper floors in accordance with the Commencement Certificate issued by BMC. However, due to height restrictions imposed by the Airports Authority of India (AAI), construction was carried out only up to 14 floors. Part Occupation Certificates up to the 14th floor have been obtained, and possession has been handed over to 99.63% of the allottees. Subsequently, in December 2025, AAI granted revised height clearance up to 106.76 meters, thereby permitting construction up to 20 floors. Accordingl

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12501028Wadhwa and Associates Project Developers Private LimitedMohamad Yusuf Layeekali Maldar27/03/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Apr 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Mar 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Dec 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Apr 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Apr 2024

Documents filed107

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Epicenter - March 2026.pdf17 Aug 2026
Withdrawal Update Form 2File: Form 2 - Epicentre - March 2026.pdf17 Aug 2026
Withdrawal Update Form 3File: Form 3 The Epicenter _March 2026.pdf17 Aug 2026
Withdrawal Update Form 1File: Epicenter Signed Form 1 December 25_11zon.pdf24 Apr 2026
Withdrawal Update Form 2File: FORM 2- The Epicenter.pdf24 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf24 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A_260410_153101.pdf10 Apr 2026
Form 5 (FY 2024-2025)File: Form 5_260410_143131.pdf10 Apr 2026
Withdrawal Update Form 1File: Epicenter Signed Form 1 December 25_11zon.pdf2 Apr 2026
Withdrawal Update Form 2File: FORM 2- The Epicenter.pdf2 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf2 Apr 2026
Withdrawal Update Form 1File: Signed Form -1 Sept 25_11zon.pdf17 Feb 2026
Withdrawal Update Form 2File: Form 2_signed.pdf17 Feb 2026
Withdrawal Update Form 3File: Form 3_signed.pdf17 Feb 2026
Withdrawal Update Form 1File: Epicentre F1 SIGNED.pdf16 Feb 2026
Withdrawal Update Form 2File: Epicentre F2 signed.pdf16 Feb 2026
Withdrawal Update Form 3File: Epicentre F3_SIGNED.pdf16 Feb 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 The Epicenter March 25.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 The Epicenter _March 25.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 The Epicenter _March 25.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 TW The Epicenter_11zon.pdf13 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 The Epicenter.pdf4 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 The Epicenter.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA form 1 sept 24.pdf18 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 The Epicentre sept 24_compressed.pdf18 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA form 2 Sept 24.pdf18 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Epicentre Form 5 FY 2023-24.pdf15 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form1 Epicenter _June 2024.pdf26 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA form 2 The Epicneter June 24.pdf26 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form3 March 24_compressed.pdf20 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Epicentre March 24.pdf30 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2 Epicentre March 24.pdf30 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_Epicenter_March 24.pdf18 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Certificate signed.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 THE EPICENTER 31122023.pdf21 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: freecompress-Form 3 - 31-12-2023.pdf21 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Epicenter Form 2-Dec-23.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 jun-23_001.pdf2 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2-sep-23_001.pdf2 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: epicentre june 23 form 1_001.pdf29 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: epicentre form 1 sep23_001.pdf29 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: june-2023_001.pdf26 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: sep-2023_001.pdf26 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Epicentre Form 5.pdf14 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Epicentre-Dec-22.pdf8 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 signed Epicentre_Mar-23.pdf8 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_Epicenter_Dec-22.pdf8 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Epicenter-March-22.pdf8 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3_Dec_22-Epicentre_Revised Dec23 Compressed.pdf8 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3_Mar_23-Epicentre_Signed_compressed.pdf8 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Epicenter - June 2022.pdf6 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Epicenter Architect Certificate - Sep 2022.pdf6 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer_Epicenter_June-22 Signed.pdf6 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Epicentre Sep-22 BW.pdf6 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Epicenter Dec-21 Signed.pdf6 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Signed Epicenter Mar-22.pdf6 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Signed BW_Epicenter Jun-22.pdf6 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Sep-22 Epicentre BW.pdf6 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form-5 Epicentre Mar-22.pdf6 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1 Epicentre Mar 22 compressed.pdf8 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Epicenter Mar 22.pdf8 Jul 2022
OtherFile: Epicenter RERA Declaration.pdf2 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architech Certificate - Dec 21_compressed.pdf28 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer_Epicenter_Sep-2021.pdf23 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Epicenter Engineer_Epicenter_Dec-2021.pdf23 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Epicentre - Sep 21_compressed.pdf18 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form-5 Epicentre_Mar 2021.pdf11 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: The Epicenter - June 2021_compressed.pdf17 Nov 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_Cert Epicentr-March-2021.pdf9 Nov 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_Epicenter_Jun-21.pdf9 Nov 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1Epicenter21_compressed.pdf23 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_The Epicentre - March 2021 R2.pdf18 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: March 21_Arch Certificate Epicentre_compressed.pdf19 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Epicenter March -2021.pdf13 May 2021
Proforma of Allotment letterFile: Agreement for Sale - Commercial - RERAUpload.pdf10 Mar 2021
Details of encumbrancesFile: Epicentre.pdf9 Mar 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_Epicenter_Sept-2020.pdf3 Feb 2021
Building plan approvalFile: IOD 26112020.pdf2 Dec 2020
Building Plan Approval / NA Order for plotted developmentFile: IOD 26112020.pdf2 Dec 2020
Building plan approvalFile: Epicenter-New IOD.pdf30 Nov 2020

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Dukes HorizonP51800027849Bandra Kurla Complex, Mumbai Suburban125Jan 2021CompletedJun 2026Jun 2023

How this compares with Mumbai Suburban

64%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The Epicentre on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bandra Kurla Complex6,700+ in Mumbai Suburban

Builder: Wadhwa and Associates Project Developers Private Limited

Wadhwa and Associates Project Developers Private Limited has 1 registration on MahaRERA, including The Epicentre. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if The Epicentre is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Epicentre?

The registered promoter entity is Wadhwa and Associates Project Developers Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Epicentre?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against The Epicentre?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for The Epicentre?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The Epicentre?

The professionals named in the filing: Architect: Kapadia Associates; Engineer: Mahimtura Consultants Pvt Ltd; Engineer: Million Jobs Private Limited; Engineer: Kamlesh Gurav; Chartered Accountant: GMJ & Co; Chartered Accountant: RMA & Co LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Epicentre?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Epicentre. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Epicentre to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.