TRIDHAATU MORYA II
By TRIDHAATU MORYA DEVELOPERS PVT LTD
RG-MH-70556 · RERA P51800015776 · Last updated on MahaRERA portal: 12 Feb 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
TRIDHAATU MORYA II is a Residential / Group Housing project by TRIDHAATU MORYA DEVELOPERS PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800015776 on 26 Mar 2018. Possession was promised by 30 Dec 2025 and is now 10 months past that date. 49 of the 108 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameTRIDHAATU MORYA II
- TypeResidential / Group Housing
- Location
- CHEMBUR DEONAR LINK ROAD
- DEONAR EAST
- Kurla
- Mumbai Suburban
- 400088
- Pincode400088
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800015776
- ReraGenie IDRG-MH-70556
Builder
- NameTRIDHAATU MORYA DEVELOPERS PVT LTD
- Entity typeCompany
- CINU45202MH2021PTC355843
- GSTIN27AAMFT2440D1ZB
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- DirectorPritam Chivukula
- Other registrations2 more →
- No longer live3 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on26 Mar 2018
- Promised completion30 Dec 2025
- Revised completionNone
- Buildings2 building records
- Documents filed108 files
Current status
Figures as on 12 Feb 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| -- | NA | 0 | 0 | 0 | 0 | 0 |
| Wing B | NA | 27 | 19 | 108 | 0 | 108 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 12 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 95%.
--Not stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Wing B100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 12 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | No | Not applicable |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 95% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 75% |
| Open Parking | No | Not applicable |
Parking filed147
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners10
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Aakar Architects & Consultants |
| Architect | Supriya Kumar |
| Architect | Aakar Architects & Consultant |
| Engineer | Sanghvi & Associates Consultant Pvt. Ltd. |
| Engineer | Nikhil Sanghavi & Associates |
| Engineer | Prasad Gaikwad |
| Chartered Accountant | S R Shelke & Associates |
| Chartered Accountant | DMJ & Co |
| Chartered Accountant | Dhairya & Co |
| Chartered Accountant | Swapnil Shelke |
| Partner | Role in project |
|---|---|
| TRIDHAATU MORYA DEVELOPERS PVT LTD | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12601109 | Shalini Wadhwa | TRIDHAATU MORYA DEVELOPERS PVT LTD | 01/03/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Nov 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Mar 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Aug 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 10 Mar 2025
Documents filed108
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2024-2025)File: Form 2A March 2023-2024.pdf | 12 Feb 2026 |
| Form 5 (FY 2024-2025)File: Form-5-Tridhaatu Morya ll- FY 22-23.pdf | 12 Feb 2026 |
| Form 1File: Form 1 - Morya II -December.pdf | 23 Jan 2026 |
| Form 2File: Form 2-Morya ll.pdf | 23 Jan 2026 |
| Form 3File: Form 3.pdf | 23 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Inventroy Wing B.pdf | 23 Jan 2026 |
| Form 1File: Form 1 Morya II.pdf | 30 Dec 2025 |
| Form 2File: Form 2-Moya ll.pdf | 30 Dec 2025 |
| Form 3File: Form-3- Morya II.pdf | 30 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold- Booked Inventory -Morya II.pdf | 30 Dec 2025 |
| Form 1File: Form 1 - 30th June 2023.pdf | 26 Dec 2025 |
| Form 2File: Form 2-Moya ll- Jun 23.pdf | 26 Dec 2025 |
| Form 3File: Form-3- Morya II- Jun 23.pdf | 26 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold- Booked Inventory -Morya-June 23.pdf | 26 Dec 2025 |
| OtherFile: Reply - Morya-II.pdf | 12 Mar 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Form 4 Morya II.pdf | 10 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A March 2023-2024.pdf | 30 May 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Morya OC of Avighna Sumukha.pdf | 12 Jan 2024 |
| Certificates of CA (Form 3)File: Form-3- Morya II- Mar 19.pdf | 30 Nov 2023 |
| Certificates of CA (Form 3)File: Form-3- Morya II- Mar 22.pdf | 30 Nov 2023 |
| Certificates of CA (Form 3)File: Form-3- Morya II- Mar 23.pdf | 30 Nov 2023 |
| Certificates of CA (Form 3)File: Form-3- Morya II- Jun 23.pdf | 30 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Moya ll- Mar 19.pdf | 28 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Moya ll- Mar 22.pdf | 28 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Moya ll- Mar 23.pdf | 28 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Moya ll- Jun 23.pdf | 28 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - Morya ll- FY 19-20.pdf | 7 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A- Morya ll- FY 20-21.pdf | 7 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A- Morya ll- FY 21-22.pdf | 7 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A- Morya ll- FY 22-23.pdf | 7 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30th September 2022 .pdf | 3 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30th March 2023.pdf | 3 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30th June 2023.pdf | 3 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30th September 2023.pdf | 3 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Morya-Sumukh-Form 5-signed 31032023.pdf | 5 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Tridhaatu Morya II FY 19 20.pdf | 2 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Tridhaatu Morya II FY 20 21.pdf | 2 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Tridhaatu Morya II FY 21 22.pdf | 2 May 2023 |
| Copy of the legal title reportFile: Tittle Certificte SC Legal.pdf | 25 Nov 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Further CC -MORYA.pdf | 2 Dec 2021 |
| Building plan approvalFile: Amended letter MAY 21.pdf | 4 Aug 2021 |
| Building plan approvalFile: Wing b- Page-8.pdf | 4 Aug 2021 |
| Building Plan Approval (IOD)File: Amended letter MAY 21.pdf | 4 Aug 2021 |
| Building Plan Approval (IOD)File: Wing b- Page-8.pdf | 4 Aug 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Morya- Further CC.pdf | 22 Jun 2021 |
| Declaration about Commencement CertificateFile: Format D- Tridhaatu Morya II- Sumukha- Wing B.pdf | 22 Jun 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Format D- Tridhaatu Morya II- Sumukha- Wing B.pdf | 15 Jun 2021 |
| Details of encumbrancesFile: Declaration on no encumbrances-CTL-Morya-II-Wing B (Sumukha).pdf | 21 Apr 2021 |
| OtherFile: Disclosure Letter Feb 2021 ELA.pdf | 15 Feb 2021 |
| Details of Restarting of Construction work post lockdownFile: Construction Status Post Lockdown-Tridhaatu Morya.pdf | 2 Dec 2020 |
| OtherFile: Disclosure Morya II.pdf | 19 Feb 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form-5 Morya-II.pdf | 16 Dec 2019 |
| Certificates of CA (Form 5)File: Form-5 Morya-II.pdf | 1 Oct 2019 |
| Certificates of CA (Form 5)File: Form 5 - MORYA II 17-18.pdf | 1 Oct 2018 |
| Building plan approvalFile: Approval 1 May 2018.pdf | 11 Jul 2018 |
| Building plan approvalFile: Approval 2 May 2018.pdf | 11 Jul 2018 |
| Building plan approvalFile: Approval 3 May 2018.pdf | 11 Jul 2018 |
| Building plan approvalFile: Approval 4 May 2018.pdf | 11 Jul 2018 |
| Building plan approvalFile: Approval 5 May 2018.pdf | 11 Jul 2018 |
| Building plan approvalFile: Approval 6 May 2018.pdf | 11 Jul 2018 |
| Building plan approvalFile: Approval 7 May 2018.pdf | 11 Jul 2018 |
| Building plan approvalFile: Approval 8 May 2018.pdf | 11 Jul 2018 |
| Building plan approvalFile: Approval 9 May 2018.pdf | 11 Jul 2018 |
| Building plan approvalFile: Approval 10 May 2018.pdf | 11 Jul 2018 |
| Building plan approvalFile: Approval 11 May 2018.pdf | 11 Jul 2018 |
| Building plan approvalFile: Approval Letter May 2018.pdf | 11 Jul 2018 |
| Building Plan Approval (IOD)File: Approval 1 May 2018.pdf | 11 Jul 2018 |
| Building Plan Approval (IOD)File: Approval 2 May 2018.pdf | 11 Jul 2018 |
| Building Plan Approval (IOD)File: Approval 3 May 2018.pdf | 11 Jul 2018 |
| Building Plan Approval (IOD)File: Approval 4 May 2018.pdf | 11 Jul 2018 |
| Building Plan Approval (IOD)File: Approval 5 May 2018.pdf | 11 Jul 2018 |
| Building Plan Approval (IOD)File: Approval 6 May 2018.pdf | 11 Jul 2018 |
| Building Plan Approval (IOD)File: Approval 7 May 2018.pdf | 11 Jul 2018 |
| Building Plan Approval (IOD)File: Approval 8 May 2018.pdf | 11 Jul 2018 |
| Building Plan Approval (IOD)File: Approval 9 May 2018.pdf | 11 Jul 2018 |
| Building Plan Approval (IOD)File: Approval 10 May 2018.pdf | 11 Jul 2018 |
| Building Plan Approval (IOD)File: Approval 11 May 2018.pdf | 11 Jul 2018 |
| Building Plan Approval (IOD)File: Approval Letter May 2018.pdf | 11 Jul 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: FURTHER CC UPTO PLINTH 210618.pdf | 11 Jul 2018 |
| Certificates of CA (Form 3)File: Form 3 CA CERTIFICATE Morya II 17 Mar 2018.pdf | 21 Mar 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 108 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep TRIDHAATU MORYA II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DEONAR EAST6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 195 registered projects within 2 km.
The Epicentre
Wadhwa and Associates Project Developers P
Misty Heights
Misty Land Developers Private Limited
TRIDHAATU MORYA
TRIDHAATU MORYA DEVELOPERS PVT LTD
Anuvidnyan Nagar Co-Op. Housing Society Ltd.
Makwise Homes LLP
Purva Clermont Wing D
Puravankara Limited
Supreme Boulevard Chembur Wing B
SUPREME SKY HIGH PRIVATE LIMITED
See every Mumbai Suburban project, with the district possession charts
Builder: TRIDHAATU MORYA DEVELOPERS PVT LTD
TRIDHAATU MORYA DEVELOPERS PVT LTD has 3 registrations on MahaRERA, including TRIDHAATU MORYA and TRIDHAATU MORYA II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that TRIDHAATU MORYA II shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if TRIDHAATU MORYA II is delayed beyond 30 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of TRIDHAATU MORYA II?
The registered promoter entity is TRIDHAATU MORYA DEVELOPERS PVT LTD, a company as per the filing. Its CIN U45202MH2021PTC355843 and GSTIN 27AAMFT2440D1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in TRIDHAATU MORYA II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against TRIDHAATU MORYA II?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for TRIDHAATU MORYA II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at TRIDHAATU MORYA II?
The professionals named in the filing: Architect: Aakar Architects & Consultants; Architect: Supriya Kumar; Architect: Aakar Architects & Consultant; Engineer: Sanghvi & Associates Consultant Pvt. Ltd.; Engineer: Nikhil Sanghavi & Associates; Engineer: Prasad Gaikwad. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in TRIDHAATU MORYA II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback