Home / Browse projects / Mumbai Suburban, Maharashtra / TRIDHAATU MORYA

Registration lapsed No litigation declared Residential / Group Housing project

TRIDHAATU MORYA

By TRIDHAATU MORYA DEVELOPERS PVT LTD

RG-MH-50705 · RERA P51800013775 · Last updated on MahaRERA portal: 6 Mar 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
10 of 11Construction stages donefurthest along: Installation of Lifts, 95%
11 of 106Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 150 documents Report an error

TRIDHAATU MORYA is a Residential / Group Housing project by TRIDHAATU MORYA DEVELOPERS PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800013775 on 25 Oct 2017. Possession was promised by 30 Dec 2025 and is now 10 months past that date. 95 of the 106 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameTRIDHAATU MORYA
  • TypeResidential / Group Housing
  • Location
    • Chembur Deonar Link Road
    • Deonar East
    • Kurla
    • Mumbai Suburban
    • 400088
  • Pincode400088
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800013775
  • ReraGenie IDRG-MH-50705

Builder

  • NameTRIDHAATU MORYA DEVELOPERS PVT LTD
  • Entity typeCompany
  • CINU45202MH2021PTC355843
  • GSTIN27AAMFT2440D1ZB
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorPritam Chivukula
  • Other registrations2 more →
  • No longer live3 lapsed, de-registered or revoked

Key dates

10 months past promisethis monthRegisteredOct 2017PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on25 Oct 2017
  • Promised completion30 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed150 files

Current status

90%95 of 106 units booked

Figures as on 6 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing CNA27191060106

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.

Wing C: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 6 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes75%
Open ParkingNoNot applicable

Parking filed122

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots122
Closed/Covered122

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,097 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI6370.13
Proposed, not sanctioned4,693 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNear New Vijay Cinema 609 V N Purav Marg Sion Trombay Road Chembur East Mumbai 400071

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAakar Architects & Consultants
ArchitectSupriya Kumar
EngineerSanghvi & Associates Consultant Pvt. Ltd.
EngineerPrasad Gaikwad
EngineerNikhil Sanghavi & Associates
Chartered AccountantDMJ & Co
Chartered AccountantS R Shelke & Associates
Chartered AccountantDhairya & Co
PartnerRole in project
TRIDHAATU MORYA DEVELOPERS PVT LTD-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12502786MANISHA AJAY DOSHITRIDHAATU MORYA DEVELOPERS PVT LTD07/08/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Nov 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 10 Mar 2025

Documents filed150

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 150 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2023-2024)File: Form 2A March 2023-2024.pdf6 Mar 2026
Form 2A (FY 2022-2023)File: Form 2A- Morya- FY 22-23.pdf6 Mar 2026
Form 2A (FY 2021-2022)File: Form 2A- Morya- FY 21-22.pdf6 Mar 2026
Form 2A (FY 2024-2025)File: Form 2A March 2023-2024.pdf12 Feb 2026
Form 5 (FY 2024-2025)File: Form-5-Tridhaatu Morya-FY-22-23.pdf12 Feb 2026
Form 1File: Form 1 - Morya - 31 December 2023.pdf23 Jan 2026
Form 2File: Form 2-Morya-December.pdf23 Jan 2026
Form 3File: Form 3 - December.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold Inventroy Wing C.pdf23 Jan 2026
Form 1File: form 1 - Morya.pdf30 Dec 2025
Form 2File: Form 2-Morya.pdf30 Dec 2025
Form 3File: Form-3 Morya.pdf30 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold- Booked Inventory.pdf30 Dec 2025
Form 1File: Form 1 - 30th June 2023.pdf26 Dec 2025
Form 2File: Form 2-Morya-Jun 23.pdf26 Dec 2025
Form 3File: Form-3 Morya-Jun 23.pdf26 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold- Booked Inventory -Morya-June 23.pdf26 Dec 2025
Form 1File: Form 1 31st March 2023.pdf22 Dec 2025
Form 2File: Form 2-Morya-Mar 23.pdf22 Dec 2025
Form 3File: Form-3 Morya-Mar 23.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold- Booked Inventory -Morya-March 23.pdf22 Dec 2025
Form 1File: Form 1 30th June 2023.pdf22 Dec 2025
Form 2File: Form 2-Morya-Jun 23.pdf22 Dec 2025
Form 3File: Form-3 Morya-Jun 23.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold- Booked Inventory -Morya-June 23.pdf22 Dec 2025
OtherFile: Reply - Morya.pdf12 Mar 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Form 4 Morya.pdf10 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A March 2023-2024.pdf30 May 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Morya OC of Avighna Sumukha.pdf12 Jan 2024
Certificates of CA (Form 3)File: Form-3 Morya-Mar 19.pdf30 Nov 2023
Certificates of CA (Form 3)File: Form-3 Morya-Mar 22.pdf30 Nov 2023
Certificates of CA (Form 3)File: Form-3 Morya-Mar 23.pdf30 Nov 2023
Certificates of CA (Form 3)File: Form-3 Morya-Jun 23.pdf30 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 3132022.pdf28 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 3132023.pdf28 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 3062023.pdf28 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Morya- Mar 19.pdf24 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Morya- Mar 22.pdf24 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Morya- Mar 23.pdf24 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Morya- Jun 23.pdf24 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A- Morya- FY 19-20.pdf7 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A- Morya- FY 20-21.pdf7 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A- Morya- FY 21-22.pdf7 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A- Morya- FY 22-23.pdf7 Nov 2023
Layout approvalFile: Amendment Drawing 13042023 1.pdf6 Nov 2023
Copy of Layout Approval (in case of layout)File: Amendment Drawing 13042023 1.pdf6 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30th September 2022.pdf3 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31st March 2023.pdf3 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30th June 2023.pdf3 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30th September 2023.pdf3 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Morya-Avighna-form 5-signed 31032023.pdf5 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Tridhaatu Morya FY 21 22.pdf2 May 2023
Copy of the legal title reportFile: Tittle Certificte SC Legal.pdf25 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: Further CC -MORYA.pdf2 Dec 2021
Declaration about Commencement CertificateFile: Format D- Dec of CC-Tridhaatu Morya I- Avighna- Wing C.pdf20 Oct 2021
Declaration in FORM BFile: Notrised Affidavit-cum-Declaration- Form B.pdf20 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - Tridhaatu Morya - 2020.pdf20 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - Tridhaatu Morya - 2021.pdf20 Oct 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold- Booked Inventory -Morya- Avighna.pdf20 Oct 2021
Certificates of CA (Form 5)File: FORM 5-Avighna-2020.pdf20 Oct 2021
Certificates of CA (Form 5)File: Form 5-Avighna-2021.pdf20 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5-Avighna-2020.pdf20 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5-Avighna-2021.pdf20 Oct 2021
Building plan approvalFile: Amended letter MAY 21.pdf4 Aug 2021
Building plan approvalFile: Wing C- Page-13.pdf4 Aug 2021
Building Plan Approval (IOD)File: Amended letter MAY 21.pdf4 Aug 2021
Building Plan Approval (IOD)File: Wing C- Page-13.pdf4 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: Format D- Tridhaatu Morya I- Avighna- Wing C.pdf22 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: Morya- Further CC.pdf22 Jun 2021
Declaration about Commencement CertificateFile: Format D- Tridhaatu Morya I- Avighna- Wing C.pdf22 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: Format D- Tridhaatu Morya I- Avighna- Wing C.pdf15 Jun 2021
Details of encumbrancesFile: Declaration on no encumbrances-CTL-Morya-Wing C (Avighna).pdf21 Apr 2021
OtherFile: Disclosure Letter Feb 2021 ELA.pdf15 Feb 2021
Details of Restarting of Construction work post lockdownFile: Construction Status Post Lockdown-Tridhaatu Morya.pdf2 Dec 2020
OtherFile: Disclosure Morya.pdf19 Feb 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form-5 Morya.pdf16 Dec 2019
Certificates of CA (Form 5)File: Form-5 Morya.pdf27 Sep 2019
Certificates of CA (Form 5)File: Form 5 - MORYA 17-18.pdf1 Oct 2018
Building plan approvalFile: Approval 1 May 2018.pdf11 Jul 2018
Building plan approvalFile: Approval 2 May 2018.pdf11 Jul 2018

How this compares with Mumbai Suburban

90%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep TRIDHAATU MORYA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Deonar East6,700+ in Mumbai Suburban

2 kmTRIDHAATU MORYACompleted 86Lapsed / revoked 53Other 56Dot size: filed unitsN

Filed coordinates, straight-line distance. 195 registered projects within 2 km.

Builder: TRIDHAATU MORYA DEVELOPERS PVT LTD

TRIDHAATU MORYA DEVELOPERS PVT LTD has 3 registrations on MahaRERA, including TRIDHAATU MORYA and TRIDHAATU MORYA II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that TRIDHAATU MORYA shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if TRIDHAATU MORYA is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TRIDHAATU MORYA?

The registered promoter entity is TRIDHAATU MORYA DEVELOPERS PVT LTD, a company as per the filing. Its CIN U45202MH2021PTC355843 and GSTIN 27AAMFT2440D1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TRIDHAATU MORYA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against TRIDHAATU MORYA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for TRIDHAATU MORYA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TRIDHAATU MORYA?

The professionals named in the filing: Architect: Aakar Architects & Consultants; Architect: Supriya Kumar; Engineer: Sanghvi & Associates Consultant Pvt. Ltd.; Engineer: Prasad Gaikwad; Engineer: Nikhil Sanghavi & Associates; Chartered Accountant: DMJ & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TRIDHAATU MORYA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TRIDHAATU MORYA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TRIDHAATU MORYA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.