Home / Browse projects / Thane, Maharashtra / THE CHALETS AVENUE
THE CHALETS AVENUE
RG-MH-08096 · RERA P51700008568 · Last updated on MahaRERA portal: 25 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 27 complaints at MahaRERA
- Completion date moved by 112 months
- 8 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
THE CHALETS AVENUE is a Residential / Group Housing project by ASSETS REALITY in Thane, Maharashtra, registered with MahaRERA as P51700008568 on 19 Aug 2017. Possession is promised by 31 Mar 2028. The completion date has moved by 112 months from the original filing. 140 of the 142 units on this registration are recorded sold or booked, and 34 of 36 construction stages are filed complete. 27 complaints are on record with the regulator.
At a glance
Project
- NameTHE CHALETS AVENUE
- TypeResidential / Group Housing
- Location
- Survey No. 12/1
- Sonivali
- Badlapur (M Cl)
- Ambarnath
- Thane
- 421503
- Pincode421503
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700008568
- ReraGenie IDRG-MH-08096
Builder
- NameASSETS REALITY
- Entity typePartnership
- PartnersBIDYA SATYADEV TIWARI, Ritesh Mishra
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on19 Aug 2017
- Promised completion31 Mar 2028
- Revised completionRevised to 31 Mar 2028 (originally 30 Nov 2018)
- Buildings4 building records
- Documents filed143 files
Current status
Figures as on 25 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TYPE A | NA | 2 | 2 | 8 | 0 | 8 |
| TYPE B | NA | 11 | 3 | 8 | 0 | 8 |
| TYPE C | NA | 11 | 3 | 8 | 0 | 8 |
| WING A | NA | 9 | 9 | 106 | 12 | 118 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 25 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
34 of 36 construction stages are filed complete across 4 buildings. The stage furthest along is Installation of Lifts, at 90%.
TYPE A100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
TYPE B100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
TYPE C100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING A97%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 87% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 25 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 90% |
| Water Supply | No | Not applicable |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 95% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 70% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed16
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| TYPE B | 8 | 8 |
| TYPE C | 8 | 8 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| RITESH MISHRA | Badlapur (M Cl) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| WING A | NA | Rs 10.05 cr | Rs 9.55 cr |
| - | NA | Rs 2.05 cr | Rs 1.40 cr |
| TYPE C | NA | Rs 1.41 cr | Rs 1.34 cr |
| TYPE B | NA | Rs 1.36 cr | Rs 1.29 cr |
| TYPE A | NA | Rs 89.90 lakh | Rs 85.40 lakh |
Certifying professionals and partners9
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | M SQUARE ARCHITECTS PROP MUKESH B MORE |
| Architect | PRAMOD PATIL AND ASSOCIATES |
| Engineer | Sanjay Ramsagar Yadav |
| Engineer | SAD CONSULTANT DARSHAN KASTURE |
| Engineer | PRAMOD KAMBLE |
| Chartered Accountant | CA Murtuza Husain Holawala |
| Chartered Accountant | Nirupam And Associates |
| Chartered Accountant | S K Mhatre & Associates |
| Chartered Accountant | CA UTPAL DESAI |
| Partner | Role in project |
|---|---|
| ASSETS REALITY | - |
Extensions applied for8
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe undersigned members of Project The Chalets Avenue Wing A Association developed by Mr. Ritesh V. Mishra having MAHARERA Registration No. P51700008568 whose registration has been expired dated 30 November 2018. For Extortion purpose Serial RTI Activist cum white colour Extortionist Vinod Prakashnath Tiwari have filed series RTI applications and complaints against our project. Subsequently Kulgaon Badlapur Municipal Council issued work stop notice (Stay) against given project (Enclosed) with great hardship and time involved promter & developer Mr. Ritesh V. Mishra obtained stay vacate NOC from
Reason as filed by the promoterRespected Sir/Madam, I, Ritesh Virendra Mishra, promoter and developer of project - ‘The Chalets Avenue’, (bearing RERA registration number P1700008568) most respectfully sheweth as under - 1) Currently our project registration is active till 31 June 2021 and we have completed 92% of work at our site. However progress of work at site has been severely affected due to default in timely slab-wise payments from 76% of allottees as per the terms notified in the sale agreements. 2) Moreover, 40% of our allottees have secured loan from troubled NBFCs namely Indiabulls Housing Finance Ltd. (IHFL) and
Reason as filed by the promoterDue to covid 19 lock down many and almost 95% of allottees defaulted on their payments, still till date with great financial hardship we have been able to complete 95% of the work. And so complete remaining 5% of the work with OC we need only 10 months extension. So I Ritesh V. Mishra hereby request Hon'ble MAHARERA to grant us last 10 months extension which is till 30th June 2023. We undersigned members and clients having purchased Units in given project constitute around 70% of the units sold by developer Ritesh V. Mishra hereby request Honourable Maharashtra Real Estate Regulatory Authority
Reason as filed by the promoterProject overall is complete and project is ready for occupation too, but because of online process wherein OC application is not getting upload since last 9-10 months. We are not able to get OC. And all developers are facing same problem in whole of Badlapur and Ambernath. On written request of Allottees we are giving conditional possession to respective allottees. Many developers Enclosed are follow ups application from Badlapur Ambernath Builders Association. So kindly help us give extension till 31st March 2025.
Reason as filed by the promoterProject overall is complete and project is ready for occupation too, but because of online process wherein OC application is not getting uploaded since last 45 to 50 days we are not able to get OC. And all developers are facing same problem in Badlapur area. So we request Hon'ble MAHARERA to kindly grant extension for 3 more months so that we can obtain OC.
Reason as filed by the promoterProject overall is complete and project is almost ready for occupation too, but because of online process wherein OC application is not getting upload since last 5 months. We are not able to apply and get OC through online process. And all developers are facing same problem in whole of Badlapur and Ambernath. Enclosed are follow ups application from Badlapur Ambernath Builders Association. Also as required have completed and uploaded all the required compliances of Form 1, Form 2, Form 2A, Form 3, Form 5, Form B, Format B and Disclosure of Inventory. Dated 07th October 2023 with great efforts
Reason as filed by the promoter1.Project is 96% Complete 2. Consent of 67.61 % of Allotees uploaded for Extension 3. In Other tab No. 1 uploaded The Revised Form B and also in the main Application 4. In Other Tab No. 2 uploaded PERT Chart for the remaining completion work and also in Other Technical Tab of the Main Application 5. In Other Tab No. 3 Uploaded Explanatory Note for Delay in project Completion and project will be completed by 31/03/2026 6. In Other Tab 4 Uploaded Appendix H 7. QPR till dates are updated 8. Due to unavoidable circumstances project has been delay and it will be completed by 31/03/2026
Reason as filed by the promoter1. The project stands at 90% completion. 2. The consent of 69.01% of allottees has been uploaded in support of this extension application. 3. Form B uploaded. 4. PERT for the remaining completion work is uploaded in the Application. 5. The Project got delayed due to following reasons:- Reason 1: The project has faced delays due to repeated complaints and RTI applications filed by certain defaulting allottees. Although the concerned authorities inspected the project and found no irregularities, the continuous complaints and regulatory proceedings delayed the plan revision and Occupancy Certific
Complaints filed with MahaRERA27
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000044180 | Yogesh Harishankar Dubey | Pankaj Trivedi | 19/04/2018 |
| CC006000000023906 | GANESH J GAWADE | RITESH MISHRA | 26/03/2018 |
| CC006000000057076 | Rosy S Petters | Asset Reality, Mr. Ritesh Mishra, Mr. Pankaj Trivedi | 28/11/2018 |
| CC006000000078285 | YOGESH SHIVAJI DESHMUKH | M/S ASSETS REALTY | 28/02/2019 |
| CC006000000078288 | GORAKSHA GENU TANDALE | M/S ASSETS REALTY | 28/02/2019 |
| CC006000000078290 | DILIP BALKRISHNA UPLEKAR | M/S ASSETS REALTY | 28/02/2019 |
| CC006000000078292 | AMITA MUKESH SHINDE | M/S ASSETS REALTY | 28/02/2019 |
| CC006000000078293 | ASHISH PRAKASH SUTAR | M/S ASSETS REALTY | 28/02/2019 |
| CC006000000078297 | KIRAN RAMKRISHNA SATAV | M/S ASSETS REALTY | 28/02/2019 |
| CC006000000078299 | PRIYANKA PRAVIN MANE | M/S ASSETS REALTY | 28/02/2019 |
| CC006000000078302 | SACHIN SHRIKANT PURANIK | M/S ASSETS REALTY | 28/02/2019 |
| CC006000000078303 | SANJU MANOHAR MAKAWANA | M/S ASSETS REALTY | 28/02/2019 |
| CC006000000078446 | Rupesh Rajaram Mohite | Assets Realty | 12/03/2019 |
| CC006000000078479 | Mr Rajkiran Gangaram Ingole | M/s Assets Realty | 14/03/2019 |
| CC006000000078500 | Balkrishna Vilas Tare | M/s Assets Realty | 15/03/2019 |
| CC006000000078535 | Rajesh Suresh Shevare | M/s Assets Realty | 18/03/2019 |
| CC006000000078539 | Rajendra Balu Phuke | M/s Assets Realty | 18/03/2019 |
| CC006000000078542 | Pandharinath Daulat Raut | M/s Assets Realty | 18/03/2019 |
| CC006000000078543 | Mrs Gayatri Mahadev Prasad Sharm | M/s Assets Realty | 18/03/2019 |
| CC006000000078609 | The Consumer's Guidance & Protection Society | M/S ASSETS REALTY | 22/03/2019 |
| CC006000000196221 | BIRENDRA RAM KARAN SHUKLA | M/S ASSETS REALITY | 04/03/2021 |
| CC006000000344216 | Vinod Baban Mirkute | M/s Assets Reality | 17/05/2023 |
| CC006000000397492 | Pandharinath Daulat Raut | ASSETS REALITY | 14/09/2023 |
| CC12503106 | ASSETS REALITY | Birendra Ramkaran Shukla and Neelam Birendra Shukla | 04/09/2025 |
| CC12503142 | ASSETS REALITY | Vinod Baban Mirkute and Vaishali Vinod Mirkute | 06/09/2025 |
| CC12503144 | ASSETS REALITY | Pandharinath Daulat Raut and Pratiksha Pandharinath Raut | 07/09/2025 |
| CC12602485 | Birendra Ramkaran Shukla and Neelam Birendra Shukla | ASSETS REALITY | 28/04/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Jun 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Jun 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Jun 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 22 Jun 2021
Documents filed143
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 143 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2024-2025)File: Form 2A_FY 24-25.pdf | 25 Aug 2026 |
| Form 2A (FY 2025-2026)File: Form 2A_FY 25-26.pdf | 24 Aug 2026 |
| Withdrawal Update Form 1File: Form 1_30-06-2026.pdf | 21 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 THE CHALETS AVENUE.pdf | 21 Aug 2026 |
| Withdrawal Update Form 3File: Form 3_30-06-2026.pdf | 21 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 June 25.pdf | 14 May 2026 |
| Withdrawal Update Form 1File: Form 1 Sept 25.pdf | 14 May 2026 |
| Withdrawal Update Form 1File: Form 1 Dec 25.pdf | 14 May 2026 |
| Withdrawal Update Form 1File: Form 1_31-03-2026.pdf | 14 May 2026 |
| Withdrawal Update Form 2File: Form 2 June 25.pdf | 14 May 2026 |
| Withdrawal Update Form 2File: Form 2 Sept 25.pdf | 14 May 2026 |
| Withdrawal Update Form 2File: Form 2 Dec 25.pdf | 14 May 2026 |
| Withdrawal Update Form 2File: Form 2_31-03-2026.pdf | 14 May 2026 |
| Withdrawal Update Form 3File: Form 3 Q1 Assets Reality June.pdf | 14 May 2026 |
| Withdrawal Update Form 3File: Form 3 Q2 Assets Reality Sept.pdf | 14 May 2026 |
| Withdrawal Update Form 3File: Form 3 Q2 Assets Reality Sept.pdf | 14 May 2026 |
| Withdrawal Update Form 3File: Form 3 Q4 Assets Reality march 26.pdf | 14 May 2026 |
| Form 1File: 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 27 Mar 2026 |
| Form 2File: 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 27 Mar 2026 |
| Form 3File: 10 Certificates of CA (Form 3).pdf | 27 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 10 Disclosure of sold_ booked inventory.pdf | 27 Mar 2026 |
| Form 1File: 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 27 Mar 2026 |
| Form 2File: 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 27 Mar 2026 |
| Form 3File: 9 Certificates of CA (Form 3).pdf | 27 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 9 Disclosure of sold_ booked inventory.pdf | 27 Mar 2026 |
| Form 1File: 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 27 Mar 2026 |
| Form 2File: 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 27 Mar 2026 |
| Form 3File: 8 Certificates of CA (Form 3) (1).pdf | 27 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 8 Disclosure of sold_ booked inventory.pdf | 27 Mar 2026 |
| Form 1File: 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 27 Mar 2026 |
| Form 2File: Engineer (Form 2)(Mandatory for only ongoing project).pdf | 27 Mar 2026 |
| Form 3File: 7 Certificates of CA (Form 3) (1).pdf | 27 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 5 Disclosure of sold_ booked inventory.pdf | 27 Mar 2026 |
| Form 1File: 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 27 Mar 2026 |
| Form 2File: 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 27 Mar 2026 |
| Form 3File: 6 Certificates of CA (Form 3) (1).pdf | 27 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 6 Disclosure of sold_ booked inventory.pdf | 27 Mar 2026 |
| Form 1File: 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 27 Mar 2026 |
| Form 2File: 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 27 Mar 2026 |
| Form 3File: 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 27 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 5 Disclosure of sold_ booked inventory (1).pdf | 27 Mar 2026 |
| Form 1File: 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 27 Mar 2026 |
| Form 2File: 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 27 Mar 2026 |
| Form 3File: 3 Certificates of CA (Form 3) (1).pdf | 27 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory.pdf | 27 Mar 2026 |
| Form 1File: 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 27 Mar 2026 |
| Form 2File: 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 27 Mar 2026 |
| Form 3File: 4 Certificates of CA (Form 3) (1).pdf | 27 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 4 Disclosure of sold_ booked inventory.pdf | 27 Mar 2026 |
| Form 1File: 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 27 Mar 2026 |
| Form 2File: 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project) (1).pdf | 27 Mar 2026 |
| Form 3File: 2 Certificates of CA (Form 3) (1).pdf | 27 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 3 Disclosure of sold_ booked inventory.pdf | 27 Mar 2026 |
| Declaration in FORM BFile: Chalets Avenue Form B_Affd cum Declaration_.pdf | 16 Jun 2025 |
| Other - TechnicalFile: Chaleets Avenue PERT Chart CPM-PERT Chart_14-06-2025 (1).pdf | 16 Jun 2025 |
| Declaration in FORM BFile: Form B_Affd cum Declaration_24-05-25.pdf | 28 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 Form 1_Arch_31-03-2023.pdf | 28 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2 Form 1_Arch_30-06-2023.pdf | 28 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3 Form 1_Arch_30-09-2023.pdf | 28 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4 Form 1_Arch_31-12-2023.pdf | 28 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 5 Form 1_Arch_31-03-2024.pdf | 28 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 6 Form 1_Arch_30-06-2024.pdf | 28 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 7 Form 1_Arch_31-09-2024.pdf | 28 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 8 Form 1_Arch_31-12-2024.pdf | 28 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 9 Form 1_Arch_31-03-2025.pdf | 28 May 2025 |
| Certificates of CA (Form 3)File: 4 Form 3_CA Certif_31-12-2023.pdf | 28 May 2025 |
| Certificates of CA (Form 3)File: 9 Form 3_CA_Certif_31-03-2025.pdf | 28 May 2025 |
| Certificates of CA (Form 3)File: 8 Form 3_CA_Certif_31-12-2024.pdf | 28 May 2025 |
| Certificates of CA (Form 3)File: 7 Form 3_CA Certif_30-09-2024.pdf | 28 May 2025 |
| Certificates of CA (Form 3)File: 6 Form 3_CA Certif_30-06-2024.pdf | 28 May 2025 |
| Certificates of CA (Form 3)File: 5 Form 3_CA Certif_31-03-2024.pdf | 28 May 2025 |
| Certificates of CA (Form 3)File: 2 Form 3_CA Certif_30-06-2023.pdf | 28 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Form 2_Engr Certif_30-06-2023.pdf | 28 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 9 Form 2_Engr Certif_31-03-2025.pdf | 28 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 8 Form 2_Engr Certif_31-12-2024.pdf | 28 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 7 Form 2_Engr Certif_30-09-2024.pdf | 28 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 6 Form 2_Engr Certif_30-06-2024.pdf | 28 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5 Form 2_Engr Certif_31-03-2024.pdf | 28 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4 Form 2_Engr Certif_31-12-2023.pdf | 28 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3 Form 2_Engr Certif_30-09-2023.pdf | 28 May 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 143 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep THE CHALETS AVENUE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Sonivali7,600+ in Thane
Filed coordinates, straight-line distance. 78 registered projects within 2 km.
PRADHAN MANTRI AWAS YOJANA - URBAN
KULGAON BADLAPUR MUNICIPAL COUNCIL
Mohan Alcoves I
MOHAN LIFESPACES LLP
MANOHAR VIKAS SHREEJI PARAISO PHASE - 2
DEEPLAXMI DEVELOPERS
SHREEJI MILESTONE
DEEP LAXMI ASSOCIATES
Mohan Willows III
MOHAN LIFESPACES LLP
SHREEJI SQUARE PHASE I
SHREEJI DEVELOPERS
See every Thane project, with the district possession charts
Builder: ASSETS REALITY
ASSETS REALITY has 1 registration on MahaRERA, including THE CHALETS AVENUE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if THE CHALETS AVENUE is delayed beyond 31 Mar 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of THE CHALETS AVENUE?
The registered promoter entity is ASSETS REALITY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in THE CHALETS AVENUE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against THE CHALETS AVENUE?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for THE CHALETS AVENUE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at THE CHALETS AVENUE?
The professionals named in the filing: Architect: M SQUARE ARCHITECTS PROP MUKESH B MORE; Architect: PRAMOD PATIL AND ASSOCIATES; Engineer: Sanjay Ramsagar Yadav; Engineer: SAD CONSULTANT DARSHAN KASTURE; Engineer: PRAMOD KAMBLE; Chartered Accountant: CA Murtuza Husain Holawala. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in THE CHALETS AVENUE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback