Home / Browse projects / Pune, Maharashtra / The Balmoral Riverside - Tower C, Phase I

Registered No litigation declared Residential / Group Housing project

The Balmoral Riverside - Tower C, Phase I

By Keywest Realty Pvt Ltd

RG-MH-17394 · RERA P52100028816 · Last updated on MahaRERA portal: 10 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Internal walls, 92%
0Complaints at MahaRERAon this registration
Jump to the 97 documents Report an error

The Balmoral Riverside - Tower C, Phase I is a Residential / Group Housing project by Keywest Realty Pvt Ltd in Pune, Maharashtra, registered with MahaRERA as P52100028816 on 30 Mar 2021. Possession is promised by 30 Jun 2027.

At a glance

Project

  • NameThe Balmoral Riverside - Tower C, Phase I
  • TypeResidential / Group Housing
  • Location
    • jupiter Hospital
    • balewadi
    • Baner
    • Haveli
    • Pune
    • 411045
  • Pincode411045
  • RERA no.P52100028816
  • ReraGenie IDRG-MH-17394

Builder

  • NameKeywest Realty Pvt Ltd
  • Entity typeCompany
  • CINU45400PN2018PTC180275
  • GSTIN27AAHCK3727G1ZH
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorBrajesh Gupta
  • Other registrations3 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2021PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on30 Mar 2021
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed97 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower C The Balmoral Riverside BalewadiNA390000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 92%.

Tower C The Balmoral Riverside Balewadi: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)90%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises92%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 10 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes5%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed257

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots257
Closed/Covered242
Open Space15

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area703 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI23926.55
Proposed, not sanctioned23,740 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBaner Pune

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Keywest Realty Pvt Ltd-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Mar 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed97

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 TBR Tower C.PDF10 Apr 2026
Form 2File: TBR-C JAN-MAR-26.PDF10 Apr 2026
Form 3File: TBR Tower C - Form 3.PDF10 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold TBR C.PDF10 Apr 2026
Form 1File: Form 1 Architect Certificate Tower C.PDF9 Jan 2026
Form 2File: TBR-TC-ENGG CERTIFICATE.PDF9 Jan 2026
Form 3File: KRPL form 3 Tower C.PDF9 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Data- Tower C TBR -31st December 2025.PDF9 Jan 2026
Form 1File: TOWER C FORM 1 ARCHITECTS CERTIFICATE.PDF12 Oct 2025
Form 2File: TBR-C.PDF12 Oct 2025
Form 3File: Form 3 Tower C.PDF12 Oct 2025
Disclosure of Sold and Booked InventoryFile: TBR C sold unsold - Till 30 Sep 2025.PDF12 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower C.PDF12 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KRPl Form 3 Tower C.PDF12 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: TBR -C.PDF12 Jul 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold TBR C.pdf12 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: TBR Form -2 Tower C 07042025.PDF21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower C.PDF17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tower C.PDF17 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold - Tower C.pdf17 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: TBR C (1).PDF17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: TBR C.PDF9 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: TBR C.PDF9 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Keywest Tower C _Form 3.PDF1 Feb 2025
Disclosure of sold/ booked inventoryFile: TBR C Building.PDF15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 TBR Tower C.PDF25 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TBR Tower C Form 1 24-10-2024.PDF13 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: TBR Tower C.PDF13 Nov 2024
Disclosure of sold/ booked inventoryFile: TBR Tower C.PDF13 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TBR Tower B Architect Certificate.PDF11 Jul 2024
Disclosure of sold/ booked inventoryFile: KRPL Tower C_10072024180541 (1).PDF11 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: TBR C FY 20-21.PDF26 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: TBR C FY 22-23.PDF26 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: TBR C FY 21-22.PDF26 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: TBR C.PDF18 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower C.PDF18 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TBR Tower C.pdf30 Apr 2024
Disclosure of sold/ booked inventoryFile: TBR Tower C.PDF30 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: TBR C-2021.PDF6 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: TBR C -2022.PDF6 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: TBR C-2023.PDF6 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TBR-C-2-10.PDF5 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TBR-C-1-7.PDF5 Dec 2023
Disclosure of sold/ booked inventoryFile: C-june_21102023113408.pdf21 Oct 2023
Disclosure of sold/ booked inventoryFile: c- september_21102023113620.pdf21 Oct 2023
Disclosure of sold/ booked inventoryFile: TOWER C.PDF8 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Keywest_Tower C.PDF5 May 2023
Details of encumbrancesFile: Revised Bajaj Encumbrance Letter.PDF6 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower Ccompressed.pdf12 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Tower Ccompressed.pdf12 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower Ccompressed.pdf12 Jan 2023
Proforma of Agreement for saleFile: BALMORAL RIVERSIDE Tower C with changes 5th Dec 2022.pdf5 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.PDF15 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.PDF15 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.PDF15 Jul 2022
Disclosure of sold/ booked inventoryFile: TC sold unsold.pdf10 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1mb Form 1 TC.pdf17 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc C 10032022091819 compressed.pdf10 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng C 10032022091938 compressed.pdf10 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ca C 10032022091615 compressed.pdf10 Mar 2022
Details of encumbrancesFile: Keywest Encumbrances letter compressed.pdf16 Dec 2021
Disclosure of sold/ booked inventoryFile: Keywest C.pdf15 Nov 2021
Layout approvalFile: SANCTION PLAN LAYOUT 03521.pdf30 Aug 2021
Building plan approvalFile: SANCTION PLAN LAYOUT 03521.pdf30 Aug 2021
Copy of Layout Approval (in case of layout)File: SANCTION PLAN LAYOUT 03521.pdf30 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: SANCTION PLAN LAYOUT 03521.pdf30 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: CC 290421.pdf30 Aug 2021
Disclosure of sold/ booked inventoryFile: KRPL C Bldg_25062021141906.PDF29 Jun 2021
Building plan approvalFile: SANCTION PLAN LAYOUT 03521.pdf3 May 2021
Building Plan Approval / NA Order for plotted developmentFile: SANCTION PLAN LAYOUT 03521.pdf3 May 2021
Commencement Certificates / NA Order for plotted developmentFile: CC 290421.pdf3 May 2021
Proforma of Allotment letterFile: BALMORAL RIVERSIDE Tower C 030521.pdf3 May 2021
OtherFile: Keywest C Declaration.PDF3 May 2021
Proforma of Allotment letterFile: Draft Agreement Tower C 7421.pdf7 Apr 2021
Layout approvalFile: Sanction DP LAYOUT - Dt 25-3-2021.pdf1 Apr 2021
Layout approvalFile: Layout CC Dt 25-3-2021.pdf1 Apr 2021
Building plan approvalFile: Sanction Building Plan Dt 25-3-2021.pdf1 Apr 2021
Copy of Layout Approval (in case of layout)File: Sanction DP LAYOUT - Dt 25-3-2021.pdf1 Apr 2021
Copy of Layout Approval (in case of layout)File: Layout CC Dt 25-3-2021.pdf1 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: Sanction Building Plan Dt 25-3-2021.pdf1 Apr 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
The Balmoral Hillside-Tower A, Phase IIP52100052022Baner, Pune138Jul 2023OngoingJun 2029Not due yet

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The Balmoral Riverside - Tower C, Phase I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near balewadi13,700+ in Pune

Builder: Keywest Realty Pvt Ltd

Keywest Realty Pvt Ltd has 4 registrations on MahaRERA, including The Balmoral Riverside-Tower D, Phase II and The Balmoral Riverside - Tower C, Phase I. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if The Balmoral Riverside - Tower C, Phase I is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Balmoral Riverside - Tower C, Phase I?

The registered promoter entity is Keywest Realty Pvt Ltd, a company as per the filing. Its CIN U45400PN2018PTC180275 and GSTIN 27AAHCK3727G1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Balmoral Riverside - Tower C, Phase I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for The Balmoral Riverside - Tower C, Phase I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in The Balmoral Riverside - Tower C, Phase I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Balmoral Riverside - Tower C, Phase I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Balmoral Riverside - Tower C, Phase I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.