Home / Browse projects / Pune, Maharashtra / The Balmoral Riverside-Tower A, Phase IV

Registered No litigation declared Residential / Group Housing project

The Balmoral Riverside-Tower A, Phase IV

By Keywest Realty Pvt Ltd

RG-MH-72923 · RERA P52100052436 · Last updated on MahaRERA portal: 10 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Podiums (if any), 20%
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

The Balmoral Riverside-Tower A, Phase IV is a Residential / Group Housing project by Keywest Realty Pvt Ltd in Pune, Maharashtra, registered with MahaRERA as P52100052436 on 25 Aug 2023. Possession is promised by 31 Dec 2028.

At a glance

Project

  • NameThe Balmoral Riverside-Tower A, Phase IV
  • TypeResidential / Group Housing
  • Location
    • Jupiter Hospital Road
    • Balewadi
    • Haveli
    • Pune
    • 411045
  • Pincode411045
  • RERA no.P52100052436
  • ReraGenie IDRG-MH-72923

Builder

  • NameKeywest Realty Pvt Ltd
  • Entity typeCompany
  • CINU45400PN2018PTC180275
  • GSTIN27AAHCK3727G1ZH
  • DirectorBrajesh Gupta
  • Other registrations3 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Aug 2023
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed81 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
The Balmoral Riverside-Tower A, Phase IVNA380000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 20%.

The Balmoral Riverside-Tower A, Phase IV: 30% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)20%
Plinth100%
Stilt Floor0%
Slabs of Super Structure12%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 10 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed15

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots15
Open Space15

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area672 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI23736.43
Proposed, not sanctioned20,184 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAundh

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Keywest Realty Pvt Ltd-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 TBR Tower A.PDF10 Apr 2026
Form 2File: TBR-A JAN-MAR-26.PDF10 Apr 2026
Form 3File: TBR Tower A - Form 3.PDF10 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold TBR A.PDF10 Apr 2026
Form 1File: Form 1 Architect Certificate Tower A.PDF9 Jan 2026
Form 2File: TBR-TA-ENGG CERTIFICATE.PDF9 Jan 2026
Form 3File: KRPL form 3 Tower A.PDF9 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold -Unsold Data- Tower A TBR -31st December 2025.PDF9 Jan 2026
Form 1File: TOWER A FORM 1 ARCHITECTS CERTIFICATE.PDF12 Oct 2025
Form 2File: TBR-A.PDF12 Oct 2025
Form 3File: Form 3 Tower A.PDF12 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold-Unsold Data - Tower A (TBR) till date 30th Sep 2025.pdf12 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower A.PDF12 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KRPl Form 3 Tower A.PDF12 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: TBR -A.PDF12 Jul 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold TBR Tower A.pdf12 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower A.PDF17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KW Tower A.PDF17 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold - Tower A (1).pdf17 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: TBR A.PDF17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: TBR A.PDF9 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: TBR A.PDF9 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: TBR A.PDF9 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Keywest Tower A Form 3.PDF1 Feb 2025
Disclosure of sold/ booked inventoryFile: TBR A Building.PDF15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2TBR Tower A.PDF25 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TBR Tower A Form 1 24-10-2024.PDF13 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 TBR Tower A.PDF13 Nov 2024
Disclosure of sold/ booked inventoryFile: TBR Tower A.PDF13 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TBR Tower A Architect Certificate.PDF11 Jul 2024
Disclosure of sold/ booked inventoryFile: Krpl Tower A_10072024182420 (1).PDF11 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: TBR A.PDF18 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: TBR A Form 3.pdf18 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TBR Tower A.pdf30 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: TBR A.PDF30 Apr 2024
Disclosure of sold/ booked inventoryFile: TBR Tower A.PDF30 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: TBR A-2023.PDF6 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TBR A-2-10.PDF5 Dec 2023
Disclosure of sold/ booked inventoryFile: A- september_21102023113759.pdf21 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Keywest Realty TOWER A FORM 3.pdf23 Aug 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Finance.PDF24 Jul 2023
Details of encumbrances concerned to LegalFile: Encumbrance Finance.PDF24 Jul 2023
CERSAI detailsFile: CERSAI TBR A TOWER.pdf24 Jul 2023
Layout approvalFile: PLAN-01-27.pdf22 Jul 2023
Copy of Layout Approval (in case of layout)File: PLAN-01-27.pdf22 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: BP COMMENCEMENT CERTIFICATE.pdf22 Jul 2023
Declaration about Commencement CertificateFile: Declaration CC.PDF22 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 for TBR tower A.PDF22 Jul 2023
CERSAI detailsFile: CERSAI_Search_Report_200274833226_For_Asset_Based_Search_19_07_2023_14_18_55_927.pdf22 Jul 2023
Proforma of Agreement for saleFile: TBR ATS.pdf22 Jul 2023
Proforma of Allotment letterFile: Allotment.PDF22 Jul 2023
Deviation Report with respect to Allotment letterFile: Deviation Allotment.PDF22 Jul 2023
Deviation Report with respect to model copy of AgreementFile: Deviation report agreement.PDF22 Jul 2023
Building plan approvalFile: PLAN-01-27.pdf3 Jul 2023
Building plan approvalFile: PLAN-02-27.pdf3 Jul 2023
Building plan approvalFile: PLAN-03-27.pdf3 Jul 2023
Building plan approvalFile: PLAN-04-27.pdf3 Jul 2023
Building plan approvalFile: PLAN-05-27.pdf3 Jul 2023
Building plan approvalFile: PLAN-06-27.pdf3 Jul 2023
Building plan approvalFile: PLAN-07-27.pdf3 Jul 2023
Building plan approvalFile: PLAN-08-27.pdf3 Jul 2023
Building plan approvalFile: PLAN-09-27.pdf3 Jul 2023
Building plan approvalFile: PLAN-10-27.pdf3 Jul 2023
PAN CardFile: 1 PAN Card.pdf3 Jul 2023
Copy of the legal title reportFile: RERA-Balewadi-Kasturi - TITLE REPORT.pdf3 Jul 2023
Details of encumbrances concerned to FinanceFile: Encumbrance legal.PDF3 Jul 2023
Details of encumbrances concerned to LegalFile: Encumbrance legal.PDF3 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN-01-27.pdf3 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN-02-27.pdf3 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN-03-27.pdf3 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN-04-27.pdf3 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN-05-27.pdf3 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN-06-27.pdf3 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN-07-27.pdf3 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN-08-27.pdf3 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN-09-27.pdf3 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN-10-27.pdf3 Jul 2023
Declaration in FORM BFile: Affidavit cum declaration FORM B_compressed.pdf3 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: TBR A - Engineers Certificate.pdf3 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure in other organisation.PDF3 Jul 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
The Balmoral Hillside-Tower A, Phase IIP52100052022Baner, Pune138Jul 2023OngoingJun 2029Not due yet

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The Balmoral Riverside-Tower A, Phase IV on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Balewadi13,700+ in Pune

Builder: Keywest Realty Pvt Ltd

Keywest Realty Pvt Ltd has 4 registrations on MahaRERA, including The Balmoral Riverside-Tower D, Phase II and The Balmoral Riverside - Tower C, Phase I. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if The Balmoral Riverside-Tower A, Phase IV is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Balmoral Riverside-Tower A, Phase IV?

The registered promoter entity is Keywest Realty Pvt Ltd, a company as per the filing. Its CIN U45400PN2018PTC180275 and GSTIN 27AAHCK3727G1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Balmoral Riverside-Tower A, Phase IV?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for The Balmoral Riverside-Tower A, Phase IV?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in The Balmoral Riverside-Tower A, Phase IV?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Balmoral Riverside-Tower A, Phase IV. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Balmoral Riverside-Tower A, Phase IV to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.