Home / Browse projects / Nashik, Maharashtra / THE AVENUE MILESTONE - TOWER 1 - Wing A
THE AVENUE MILESTONE - TOWER 1 - Wing A
By NASHIK CONSTRUWELL PRIVATE LIMITED
RG-MH-79060 · RERA P51600053718 · Last updated on MahaRERA portal: 12 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 12.00 crore secured on the land, in favour of BAJAJ HOUSING FINANCE LIMITED
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
THE AVENUE MILESTONE - TOWER 1 - Wing A is a Others project by NASHIK CONSTRUWELL PRIVATE LIMITED in Nashik, Maharashtra, registered with MahaRERA as P51600053718 on 22 Nov 2023. Possession is promised by 31 Dec 2027. 9 of the 33 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameTHE AVENUE MILESTONE - TOWER 1 - Wing A
- TypeOthers
- Location
- Karmayogi Nagar
- Govind Nagar
- Nashik
- 422009
- Pincode422009
- RERA no.P51600053718
- ReraGenie IDRG-MH-79060
Builder
- NameNASHIK CONSTRUWELL PRIVATE LIMITED
- Entity typeCompany
- DirectorsMUKUND RAMSWARUP SABU, NAYAN SUBHASH BHANDARI, VASANT RATANLAL SURANA, GURMEETSINGH GURUCHARANSINGH RAJPAL, YOGESH SURESH BEDMUTHA, GURUDEEPSINGH GURUCHARANSINGH RAJPAL
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on22 Nov 2023
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed107 files
Current status
Figures as on 12 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| THE AVENUE MILESTONE - TOWER 1 - Wing A | NA | 17 | 16 | 30 | 3 | 33 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 12 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.
THE AVENUE MILESTONE - TOWER 1 - Wing A: 52% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 30% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 12 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed59
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| THE AVENUE MILESTONE - TOWER 1 - Wing A | NA | Rs 22.50 cr | Rs 16.92 cr |
| - | NA | Rs 3.00 cr | Rs 2.26 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Darshan Sancheti |
| Architect | Darshsan Sancheti |
| Engineer | Nandkumar Patil |
| Chartered Accountant | CA Bhavana Loya Bhushan |
| Chartered Accountant | Chetan Anand & Co. |
| Partner | Role in project |
|---|---|
| NASHIK CONSTRUWELL PRIVATE LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Sep 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Sep 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Nov 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed107
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 - MS T1 - Q4 25-26.pdf | 12 May 2026 |
| Withdrawal Update Form 2File: Final Form 2 T1.pdf | 12 May 2026 |
| Withdrawal Update Form 3File: merged with Bank Declaration.pdf | 12 May 2026 |
| Withdrawal Update Form 1File: T1 Form 1.pdf | 23 Mar 2026 |
| Withdrawal Update Form 2File: T1 Form 2.pdf | 23 Mar 2026 |
| Withdrawal Update Form 3File: T1 Form 3.pdf | 23 Mar 2026 |
| Withdrawal Update Form 1File: promoter signed form 1 NCPL T1.pdf | 12 Dec 2025 |
| Withdrawal Update Form 2File: M S T1 Form 2 Q2 FY 25-26.pdf | 12 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 T1 Q2.pdf | 12 Dec 2025 |
| Form 5 (FY 2024-2025)File: Nashik Construwell 2_0001 203.pdf | 27 Sep 2025 |
| Withdrawal Update Form 1File: NCPL T1 Q1 Form 1.pdf | 5 Sep 2025 |
| Withdrawal Update Form 2File: NCPL T1 Form 2 .pdf | 5 Sep 2025 |
| Withdrawal Update Form 3File: NCPL T1 -Form 3 .pdf | 5 Sep 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Milestone T1 - Form 1 - Q4 FY 24-25.pdf | 13 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Milestone T1 - Form 3 - Q4 FY 24-25.pdf | 13 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Milestone T1 - Form 2 - Q4 FY 24-25.pdf | 13 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Milestone T1 - Form 2 - Q3 FY 24-25.pdf | 11 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Milestone T1 - Form 1 - Q3 FY 24-25.pdf | 10 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: T1 Q3_0001.pdf | 10 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avenue Milestone - Tower 1 - Form 2 fy 24-25 Q3.pdf | 10 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Milestone T1 Form 1_compressed.pdf | 7 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final_compressed.pdf | 7 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: fORM 2.pdf | 7 Mar 2025 |
| Details of encumbrances concerned to FinanceFile: Milestone Encumbrance for Rera.pdf | 28 Feb 2025 |
| CERSAI detailsFile: Tower 1 Cersai Report.pdf | 28 Feb 2025 |
| Details of encumbrances concerned to LegalFile: Milestone Encumbrance for Rera.pdf | 28 Feb 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of secured loan.pdf | 28 Feb 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: CA Certificate for Tower 1.pdf | 28 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: T1_0001.pdf | 18 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: T1_0001.pdf | 18 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect - T1 - Form 1 - Q3 - FY 23-24.pdf | 7 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engenieer Certificate - T1 - Form 2 - Q3 - FY 23-24.pdf | 7 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Q3 T1 23-24.pdf | 7 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engenieer Certificate - T1 - Form 2 - Q4 - FY 23-24.pdf | 7 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect - T1 - Form 1 - Q4 - FY 23-24.pdf | 7 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA T1 Q4 23-24.pdf | 7 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect - T1 - Form 1 - Q1 - FY 24-25_compressed.pdf | 7 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engenieer Certificate - T1 - Form 2 - Q1 - FY 24-25.pdf | 7 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA T 1 Q1 24-25.pdf | 7 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect - T1 - Form 1 - Q3 - FY 23-24.pdf | 7 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect - T1 - Form 1 - Q4 - FY 23-24.pdf | 7 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect - T1 - Form 1 - Q1 - FY 24-25_compressed.pdf | 7 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Q3 T1 23-24.pdf | 7 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA T1 Q4 23-24.pdf | 7 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA T 1 Q1 24-25.pdf | 7 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engenieer Certificate - T1 - Form 2 - Q3 - FY 23-24.pdf | 7 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engenieer Certificate - T1 - Form 2 - Q4 - FY 23-24.pdf | 7 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engenieer Certificate - T1 - Form 2 - Q1 - FY 24-25.pdf | 7 Oct 2024 |
| Other - LegalFile: Intimation of suit filed - TOWER 1 - Wing A.pdf | 23 Jul 2024 |
| Declaration in FORM BFile: form b_compressed.pdf | 17 Nov 2023 |
| Building plan approvalFile: APPROVED PLAN T1.pdf | 13 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: APPROVED PLAN T1.pdf | 13 Nov 2023 |
| Other - TechnicalFile: Form B tower 1 wing a.pdf | 13 Nov 2023 |
| Other - TechnicalFile: T1-form d_compressed-edited.pdf | 13 Nov 2023 |
| Building plan approvalFile: P2_11zon.pdf | 11 Nov 2023 |
| Building plan approvalFile: P3 -EDITED_11zon.pdf | 11 Nov 2023 |
| Building plan approvalFile: P4_11zon.pdf | 11 Nov 2023 |
| Building plan approvalFile: approved plan-1 EDITED.pdf | 11 Nov 2023 |
| Building plan approvalFile: P1 E2_11zon.pdf | 11 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: finance encumbraces.pdf | 11 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: LEGAL ENCUMBARANCE_compressed.pdf | 11 Nov 2023 |
| Details of encumbrances concerned to LegalFile: finance encumbraces.pdf | 11 Nov 2023 |
| Details of encumbrances concerned to LegalFile: LEGAL ENCUMBARANCE_compressed.pdf | 11 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: P2_11zon.pdf | 11 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: P3 -EDITED_11zon.pdf | 11 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: P4_11zon.pdf | 11 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: approved plan-1 EDITED.pdf | 11 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: P1 E2_11zon.pdf | 11 Nov 2023 |
| CERSAI detailsFile: cersai report 1.pdf | 11 Nov 2023 |
| CERSAI detailsFile: cersai report 2.pdf | 11 Nov 2023 |
| CERSAI detailsFile: CERSAI Declaration.pdf | 11 Nov 2023 |
| Other - LegalFile: area declaaration.pdf | 11 Nov 2023 |
| Other - LegalFile: NON ENCUMBARANCE.pdf | 11 Nov 2023 |
| Other - TechnicalFile: rename declaration.pdf | 11 Nov 2023 |
| Other - LegalFile: Milestone - Index 2 of plot no 33.pdf | 19 Oct 2023 |
| Deviation Report with respect to Allotment letterFile: DEV RELATED TO ALLOTMENT.PDF | 4 Oct 2023 |
| Other - LegalFile: Plot 34 and 35 index2.pdf | 2 Oct 2023 |
| Other - LegalFile: Plot No 36,37 and 38 index 2.pdf | 2 Oct 2023 |
| Other - LegalFile: Plot 39 AND 40 index 2.pdf | 2 Oct 2023 |
| Other - LegalFile: Plot No 33 index 2.pdf | 2 Oct 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 107 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep THE AVENUE MILESTONE - TOWER 1 - Wing A on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Govind Nagar4,100+ in Nashik
STAR WORLD
DEEPAK KALYANJI CHANDE
VRAJ CENTRAL VISTA
DHAIRYA DEVELOPERS
ROONGTA TECHONE APARTMENT
SHREE TIRUMALA BUILDCON
VRAJ CAPITAL
KAPILAVASTU CREATORS
MAA BHAGWATI RESIDENCY APARTMENT
ROONGTA LANDMARKS LLP
THREE LEAVES PHASE ONE
DEEPAK INFRA AND HOMES PRIVATE LIMITED
See every Nashik project, with the district possession charts
Builder: NASHIK CONSTRUWELL PRIVATE LIMITED
NASHIK CONSTRUWELL PRIVATE LIMITED has 2 registrations on MahaRERA, including THE AVENUE MILESTONE - TOWER 1 - Wing A and THE AVENUE MILESTONE - TOWER 2 - Wing B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if THE AVENUE MILESTONE - TOWER 1 - Wing A is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of THE AVENUE MILESTONE - TOWER 1 - Wing A?
The registered promoter entity is NASHIK CONSTRUWELL PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in THE AVENUE MILESTONE - TOWER 1 - Wing A?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for THE AVENUE MILESTONE - TOWER 1 - Wing A?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at THE AVENUE MILESTONE - TOWER 1 - Wing A?
The professionals named in the filing: Architect: Darshan Sancheti; Architect: Darshsan Sancheti; Engineer: Nandkumar Patil; Chartered Accountant: CA Bhavana Loya Bhushan; Chartered Accountant: Chetan Anand & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in THE AVENUE MILESTONE - TOWER 1 - Wing A?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback