THE ADDRESS-PHASE 2

By DARSHAK SHAH AND DHARMENDRA TANDEL

RG-MH-00265 · RERA P49500000008 · Last updated on MahaRERA portal: 8 Nov 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 46 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Daman registration emailed to you, free during the pilot beta.
Dec 2022Possession promised46 months past this date
27 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

THE ADDRESS-PHASE 2 is a Mixed project by DARSHAK SHAH AND DHARMENDRA TANDEL in Daman, Daman & Diu, registered with MahaRERA as P49500000008 on 12 Apr 2018. Possession was promised by 30 Dec 2022 and is now 46 months past that date.

At a glance

Project

  • NameTHE ADDRESS-PHASE 2
  • TypeMixed
  • Location
    • COST GOURD ROAD
    • KATHIRIA AND DUNETHA
    • Daman
    • 396210
  • Pincode396210
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P49500000008
  • ReraGenie IDRG-MH-00265

Builder

  • NameDARSHAK SHAH AND DHARMENDRA TANDEL
  • Entity typeOthers
  • Named personsDHARMENDRA TANDEL, DARSHAK SHAH
  • Other registrations2 more →
  • Completed2 of 3
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

46 months past promisethis monthRegisteredApr 2018PromisedDec 2022

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on12 Apr 2018
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings3 building records
  • Documents filed54 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
I TYPE BUILDINGNA90000
J TYPE BUILDINGNA90000
K TYPE BUILDINGNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 8 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

27 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

I TYPE BUILDING82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
J TYPE BUILDING82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
K TYPE BUILDING82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 8 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed41

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots41
Closed/Covered1
Open Space40
BuildingClosed/CoveredOpen SpaceTotal
I TYPE BUILDING02020
J TYPE BUILDING01010
K TYPE BUILDING11011

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,465 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI9441.95
Proposed, not sanctioned9,006 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUNF FLOOR, SAPPHIRE BUILDING, DAULAT NAGAR, CHALA VAPI

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANISH DOSHI
EngineerJALIL SHAIKH
Chartered AccountantP.R. Desai &Co
PartnerRole in project
DARSHAK SHAH AND DHARMENDRA TANDEL-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Apr 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Apr 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Apr 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2018-2019)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19) (UT).pdf8 Nov 2025
Form 5 (FY 2019-2020)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20) (UT).pdf8 Nov 2025
Form 5 (FY 2020-2021)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21) (UT).pdf8 Nov 2025
Form 5 (FY 2021-2022)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22) (1).pdf8 Nov 2025
Form 5 (FY 2022-2023)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf8 Nov 2025
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM-1 The addrss phase-2.PDF15 Jan 2025
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: The Address.pdf16 Oct 2024
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: The Address.pdf9 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20) (UT)File: The Address Phase 2 19-20.pdf21 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21) (UT)File: The Address Phase 2 20-21.pdf21 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: The Address Phase 2 21-22.pdf21 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19) (UT)File: FORM 5 THE ADDRESS PHASE II FY 2018-19.pdf6 May 2024
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: The Address_11zon.pdf24 Apr 2024
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: The Address 2 QTR-4.pdf25 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: DSDT Address 2.pdf9 Dec 2023
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: architect CERTI TA PHASE-2_compressed (2).pdf31 Jul 2021
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: architect CERTI TA PHASE-2_compressed (1).pdf8 May 2021
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: TA Phase2 Architect Certificate.pdf15 Jan 2021
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: Architect's crtificate TA Phase II 31-3-20.pdf4 Nov 2020
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: Architect's crtificate TA Phase II 30-9-20.pdf4 Nov 2020
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: TA Phase 2.pdf18 Feb 2020
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: TA - P2.pdf14 Oct 2019
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: TA PHASE 2.pdf4 Sep 2019
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: TA-2 Architect dated 3-4-19_comp.pdf2 Sep 2019
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: TA-2 Architect dated 9-1-19_comp.pdf2 Sep 2019
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: TA-2 Architect dated 9-1-19_comp.pdf2 Sep 2019
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: Form-1-SUBMIT.pdf10 Jan 2019
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: form-2.pdf10 Jan 2019
Layout approvalFile: layout.pdf3 Apr 2018
Building plan approval or NA orderFile: I- DWG10.pdf3 Apr 2018
Building plan approval or NA orderFile: j-DWG11.pdf3 Apr 2018
Building plan approval or NA orderFile: k-DWG12.pdf3 Apr 2018
Layout approvalFile: PHASE 2 AREA PLAN.pdf3 Apr 2018
PAN CardFile: firm pan.pdf3 Apr 2018
PAN CardFile: DBS pan card.pdf3 Apr 2018
PAN CardFile: dharmendra pan.pdf3 Apr 2018
Copy of the legal title reportFile: TITLE.pdf3 Apr 2018
Details of encumbrancesFile: Nil Encumberance certificate.pdf3 Apr 2018
Copy of Layout Approval (in case of layout)File: layout.pdf3 Apr 2018
Copy of Layout Approval (in case of layout)File: PHASE 2 AREA PLAN.pdf3 Apr 2018
Building Plan Approval (IOD)File: I- DWG10.pdf3 Apr 2018
Building Plan Approval (IOD)File: j-DWG11.pdf3 Apr 2018
Building Plan Approval (IOD)File: k-DWG12.pdf3 Apr 2018
Commencement CertificatesFile: commencement certificate.pdf3 Apr 2018
Declaration in FORM BFile: FORM B.pdf3 Apr 2018
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf3 Apr 2018
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: engineer cert.pdf3 Apr 2018
Certificates of CA (Form 3) (UT)File: FORM 3 CA.pdf3 Apr 2018
Annual Report / Audited Financial Statements for the immediately preceding three financial yearsFile: AUDIT REPORT.pdf3 Apr 2018
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf3 Apr 2018
Proforma of Allotment letterFile: flat_Agreement for Sale.pdf3 Apr 2018
OtherFile: cost guard noc-1.pdf3 Apr 2018
OtherFile: cost guard noc-2.pdf3 Apr 2018
OtherFile: fire noc.pdf3 Apr 2018

How this compares with Daman

18%of Daman projects moved their completion datethis one has not
35%of Daman registrations have lapsed or been cancelledthis one is among them

Computed across the 59 Daman projects on ReraGenie, from their own filings.

Keep THE ADDRESS-PHASE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KATHIRIA AND DUNETHA59 in Daman

2 kmTHE ADDRESS-PHASE 2Completed 2Lapsed / revoked 5Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 11 registered projects within 2 km.

Builder: DARSHAK SHAH AND DHARMENDRA TANDEL

DARSHAK SHAH AND DHARMENDRA TANDEL has 3 registrations on MahaRERA, including THE ADDRESS-PHASE-1 and THE ADDRESS-PHASE 2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Daman district page.

Frequently asked questions

What does it mean that THE ADDRESS-PHASE 2 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if THE ADDRESS-PHASE 2 is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE ADDRESS-PHASE 2?

The registered promoter entity is DARSHAK SHAH AND DHARMENDRA TANDEL, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE ADDRESS-PHASE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE ADDRESS-PHASE 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE ADDRESS-PHASE 2?

The professionals named in the filing: Architect: MANISH DOSHI; Engineer: JALIL SHAIKH; Chartered Accountant: P.R. Desai &Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE ADDRESS-PHASE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE ADDRESS-PHASE 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE ADDRESS-PHASE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.