Registered No litigation declared Residential / Group Housing project

The Address by GS Tower D

By Raymond Realty Limited

RG-MH-07141 · RERA P51700053947 · Last updated on MahaRERA portal: 10 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 6 completed earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 13 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2029Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 50%
33 of 218Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 152 documents Report an error

The Address by GS Tower D is a Residential / Group Housing project by Raymond Realty Limited in Thane, Maharashtra, registered with MahaRERA as P51700053947 on 11 Dec 2023. Possession is promised by 31 Mar 2029. 185 of the 218 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameThe Address by GS Tower D
  • TypeResidential / Group Housing
  • Location
    • Pokharan Road no 01
    • JK Gram
    • Thane (M Corp.)
    • Thane
    • 400606
  • Pincode400606
  • RERA no.P51700053947
  • ReraGenie IDRG-MH-07141

Builder

  • NameRaymond Realty Limited
  • Entity typeCompany
  • CINU41000MH2019PLC332934
  • GSTIN27AAJCR9076K1ZL
  • Other registrations13 more →
  • Completed2 of 14
  • Declared earlier projects31 →

Key dates

this monthRegisteredDec 2023PromisedMar 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Dec 2023
  • Promised completion31 Mar 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed152 files

Current status

85%185 of 218 units booked
42.9%Work done, per cost certificate

Figures as on 10 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
The Address by GS Tower D - Wing 3NA46402180218

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 50%.

The Address by GS Tower D - Wing 3: 55% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 10 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed552

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots552
Closed/Covered552

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,074 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Sep 2025

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI38583.88
Proposed, not sanctioned38,584 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKhopat Next to MSRTC Bus Depo Thane West
Estimated costRs 356.41 cr
Cost incurredRs 153.00 cr
Work done42.93%
BuildingWingEstimatedIncurred
The Address by GS Tower D - Wing 3NARs 255.57 crRs 78.85 cr
-NARs 100.84 crRs 74.15 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSpaceage consultant
EngineerCBN Engineers India
EngineerRajesh Mishra
Chartered AccountantNiraj Sanghavi&associates
Chartered AccountantWalker Chandiok & Co LLP
PartnerRole in project
Raymond Realty Limited-

Litigation declared5

CaseCourtStatus
158/2012Bombay High CourtPending
13/2016Bombay High CourtPending
57/2016Bombay High CourtPending
71/2017Bombay High CourtPending
562/2019Maharashtra Revenue TribunalPending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2029

Documents filed152

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 152 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_Address By GS Tower D.pdf10 Jul 2026
Withdrawal Update Form 2File: Form 2_The Address By GS T D.pdf10 Jul 2026
Withdrawal Update Form 3File: Form 3_ The Address by GS Tower D.pdf10 Jul 2026
Form 2A (FY 2025-2026)File: TOWER D.pdf26 Jun 2026
Withdrawal Update Form 1File: Form 1_The Address By GS T D.pdf23 Apr 2026
Withdrawal Update Form 2File: Form 2_The Address By GS T D.pdf23 Apr 2026
Withdrawal Update Form 3File: Form 3 The Address By GS Tower D.pdf23 Apr 2026
Withdrawal Update Form 1File: Form 1_Sup Tower D.pdf22 Jan 2026
Withdrawal Update Form 2File: Form 2_Sup D.pdf22 Jan 2026
Withdrawal Update Form 3File: Form 3_Sup D_.pdf22 Jan 2026
Withdrawal Update Form 1File: Sup Tower D_Online.pdf17 Oct 2025
Withdrawal Update Form 2File: Form 2_Sup Tower D.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3_Sup Tower D.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 The Address by GS Tower D.pdf6 Oct 2025
Form 1File: Form 1_Tower D.pdf20 Jul 2025
Form 2File: Form 2 RERA.pdf20 Jul 2025
Form 3File: Form 3 GS Tower D.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold list.pdf20 Jul 2025
Form 2A (FY 2024-2025)File: TOWER D.pdf3 Jul 2025
Form 1File: Form 1 SP Tower D.pdf2 Jul 2025
Form 2File: Form 2 RERA - address by GS Tower D 310325.pdf2 Jul 2025
Form 3File: RERA Form 3 Super Prem Tower D.pdf2 Jul 2025
Disclosure of Sold and Booked InventoryFile: Tower D-Super Premium.pdf2 Jul 2025
Disclosure of sold/ booked inventoryFile: Tower D-Super Premium.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 Super Prem Tower D.pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 - Tower D (The Address by GS) - Certificate Number 30 signed.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA - address by GS Tower D 310325.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 SP Tower D.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower D.pdf17 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 Tower D.pdf17 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA address by GS Tower D 030325.pdf17 Mar 2025
Layout approvalFile: layout compress.pdf19 Feb 2025
Building plan approvalFile: 2.pdf19 Feb 2025
Building plan approvalFile: 3.pdf19 Feb 2025
Building plan approvalFile: 4.pdf19 Feb 2025
Building plan approvalFile: 5.pdf19 Feb 2025
Building plan approvalFile: 6.pdf19 Feb 2025
Building plan approvalFile: 7.pdf19 Feb 2025
Building plan approvalFile: 8.pdf19 Feb 2025
Building plan approvalFile: 9.pdf19 Feb 2025
Building plan approvalFile: 10.pdf19 Feb 2025
Building plan approvalFile: 11.pdf19 Feb 2025
Building plan approvalFile: 12.pdf19 Feb 2025
Building plan approvalFile: 13.pdf19 Feb 2025
Copy of Layout Approval (in case of layout)File: layout compress.pdf19 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf19 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf19 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 13.pdf19 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 12.pdf19 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 11.pdf19 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 10.pdf19 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 9.pdf19 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 8.pdf19 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 7.pdf19 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf19 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf19 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf19 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf19 Feb 2025
Declaration about Commencement CertificateFile: CC DECLARATION THE ADDRESS BY GS TOWER D.pdf19 Feb 2025
Disclosure of sold/ booked inventoryFile: The Address by GS Tower D.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA - address by GS Tower D 311224.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 tower -D_250113_123010.pdf15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 - Tower D (The Address by GS) - Certificate Number 282 signed.pdf15 Jan 2025
Disclosure of sold/ booked inventoryFile: Address by GS Tower D.pdf24 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed RERA Form 3 - Tower D (The Address by GS) - Certificate Number 189.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower D.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA - address by GS Tower D 300924.pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Annexure 16,THE ADDRESS BY GS TOWER D.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Tower D.pdf19 Jul 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD TOWER D.pdf18 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM2A.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA - address by GS Tower D 010724.pdf9 Jul 2024
Disclosure of sold/ booked inventoryFile: THE ADD BY GS TOWER D.pdf23 Apr 2024
CERSAI detailsFile: CERSAI_Search_Report_200304205677_For_Asset_Based_Search_18_04_2024_18_17_49_559.pdf19 Apr 2024
CERSAI detailsFile: CERSAI_Search_Report_200304205839_For_Asset_Based_Search_18_04_2024_18_18_13_450.pdf19 Apr 2024
CERSAI detailsFile: CERSAI_Search_Report_200304205987_For_Asset_Based_Search_18_04_2024_18_18_38_362.pdf19 Apr 2024
CERSAI detailsFile: CERSAI_Search_Report_200304206086_For_Asset_Based_Search_18_04_2024_18_18_53_080.pdf19 Apr 2024
CERSAI detailsFile: CERSAI_Search_Report_200304206218_For_Asset_Based_Search_18_04_2024_18_19_16_226.pdf19 Apr 2024
CERSAI detailsFile: CERSAI_Search_Report_200304206268_For_Asset_Based_Search_18_04_2024_18_19_28_872.pdf19 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: The Add by GS TOWER D.pdf18 Apr 2024

Promoter's earlier projects7

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered on promise1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
INVICTUS BY GSP51700052012Village Panchpakhadi, Thane102Jul 2023OngoingOct 2028Not due yet
TEN X Habitat Raymond Realty Tower GThe Mill Pokharan Road No-01 JK Gram Thane 400606291-OngoingJun 2026Jun 2026
TEN X Habitat Raymond Realty Tower FThe Mill Pokharan Road No-01 JK Gram Thane 400606399-OngoingMar 2026Mar 2026
TEN X Habitat Raymond Realty Tower KThe Mill Pokharan Road No 01 JK Gram Thane 400606318-OngoingSep 2025Sep 2025
TEN X Habitat Raymond Realty Tower HThe Mill Pokharan Road No-01 JK Gram Thane 400606320-OngoingSep 2025Sep 2025
TEN X Habitat Raymond Realty Tower EThe Mill Pokharan Road No-01 JK Gram Thane 400606320-OngoingSep 2025Sep 2025
TEN X Habitat Raymond Realty Tower JThe Mill Pokharan Road No-01 JK Gram Thane 400606320-OngoingJun 2025Jun 2025

How this compares with Thane

85%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The Address by GS Tower D on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near JK Gram7,600+ in Thane

Builder: Raymond Realty Limited

Raymond Realty Limited has 14 registrations on MahaRERA, including TEN X HABITAT Raymond Realty Tower F and TEN X HABITAT Raymond Realty Tower G. Its filings disclose 31 earlier MahaRERA projects: declares 23 of 24 past projects completed on time. Litigation is declared on 11 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if The Address by GS Tower D is delayed beyond 31 Mar 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Address by GS Tower D?

The registered promoter entity is Raymond Realty Limited, a company as per the filing. Its CIN U41000MH2019PLC332934 and GSTIN 27AAJCR9076K1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Address by GS Tower D?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for The Address by GS Tower D?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The Address by GS Tower D?

The professionals named in the filing: Architect: Spaceage consultant; Engineer: CBN Engineers India; Engineer: Rajesh Mishra; Chartered Accountant: Niraj Sanghavi&associates; Chartered Accountant: Walker Chandiok & Co LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Address by GS Tower D?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Address by GS Tower D. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Address by GS Tower D to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.