Home / Browse projects / Thane, Maharashtra / RAUNAK SERENE

Registered No litigation declared Residential / Group Housing project

RAUNAK SERENE

By RAUNAK CORPORATION

RG-MH-37322 · RERA P51700045210 · Last updated on MahaRERA portal: 3 Aug 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • All 12 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Apr 2029Possession promisedmoved 4 months from the original
2 of 11Construction stages donefurthest along: Basement (if any), 95%
56 of 208Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

RAUNAK SERENE is a Residential / Group Housing project by RAUNAK CORPORATION in Thane, Maharashtra, registered with MahaRERA as P51700045210 on 10 May 2022. Possession is promised by 30 Apr 2029. The completion date has moved by 4 months from the original filing. 152 of the 208 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameRAUNAK SERENE
  • TypeResidential / Group Housing
  • Location
    • POKHRAN ROAD
    • SHIVAI NAGAR
    • Thane (M Corp.)
    • Thane
    • 400606
  • Pincode400606
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700045210
  • ReraGenie IDRG-MH-37322

Builder

  • NameRAUNAK CORPORATION
  • Entity typePartnership
  • PartnerVIJAY PITAMBER MODY
  • Other registrations14 more →
  • Completed10 of 15
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects12 →

Key dates

this monthRegisteredMay 2022First promiseDec 2028Revised toApr 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 May 2022
  • Promised completion30 Apr 2029
  • Revised completionRevised to 30 Apr 2029 (originally 31 Dec 2028)
  • Buildings1 building record
  • Documents filed54 files

Current status

73%152 of 208 units booked
24.4%Work done, per cost certificate

Figures as on 3 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RAUNAK SERENENA32322008208

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 95%.

RAUNAK SERENE: 31% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)95%
Podiums (if any)0%
Plinth100%
Stilt Floor21%
Slabs of Super Structure15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises7%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.3%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsYes8%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes30%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes10%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed264

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots264
Closed/Covered264

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area500 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI18079.0
Proposed, not sanctioned6,079 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGlenmorgan, Veer Savarkar Marg,Panchpakhadi Thane w
Estimated costRs 62.00 cr
Cost incurredRs 15.11 cr
Work done24.37%
BuildingWingEstimatedIncurred
RAUNAK SERENENARs 53.00 crRs 14.76 cr
-NARs 9.00 crRs 35.00 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANGESH RANE
ArchitectDESIGN CONSORTIUM
EngineerRAJAN TIPNIS
EngineerHARSHAL MANOHARRAO POTODE
Chartered AccountantANKIT GOYANKA
Chartered AccountantSANDEEP SHETH
PartnerRole in project
RAUNAK CORPORATION-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P51700045210/WarDec 2028 → Apr 2029

Reason as filed by the promoterNA

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12400930Raunak CorporationVinesh Subhash Ganechari29/11/2024
CC12400931Raunak CorporationDilip Shantaram Bamugude29/11/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2029

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Withdrawal Application Form1 Serene.pdf3 Aug 2026
Withdrawal Update Form 2File: Withdrawal Application Form 2 Serene.pdf3 Aug 2026
Withdrawal Update Form 3File: CA Certificate Raunak Serene.pdf3 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A Raunak Serene RC.pdf11 Jun 2026
Withdrawal Update Form 1File: Form 1 Raunak Serene 31032026.pdf7 May 2026
Withdrawal Update Form 1File: Form 1 Raunak Serene 31032026.pdf7 May 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 Serene.pdf7 May 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 Serene.pdf7 May 2026
Withdrawal Update Form 3File: CA Certificate Raunak Serene 31122025.pdf7 May 2026
Withdrawal Update Form 3File: CA Certificate Raunak Serene 31122025.pdf7 May 2026
Withdrawal Update Form 1File: Form 1 Raunak Serene Dec 25.pdf13 Feb 2026
Withdrawal Update Form 1File: Form 1 Raunak Serene Dec 25.pdf13 Feb 2026
Withdrawal Update Form 1File: Form 1 Raunak Serene Dec 25.pdf13 Feb 2026
Withdrawal Update Form 2File: Form2 Serene.pdf13 Feb 2026
Withdrawal Update Form 2File: Raunak Serene.pdf13 Feb 2026
Withdrawal Update Form 2File: Raunak Serene.pdf13 Feb 2026
Withdrawal Update Form 3File: CA Certificate Raunak Serene 30092025.pdf13 Feb 2026
Withdrawal Update Form 3File: CA Certificate Raunak Serene 31122025.pdf13 Feb 2026
Withdrawal Update Form 3File: CA Certificate Raunak Serene 31122025.pdf13 Feb 2026
Withdrawal Update Form 1File: From 1 Raunak Serene.pdf18 Nov 2025
Withdrawal Update Form 2File: Form2 Serene.pdf18 Nov 2025
Withdrawal Update Form 3File: CA Certificate Raunak Serene 30092025.pdf18 Nov 2025
Form 5 (FY 2024-2025)File: Raunak Serene.pdf3 Nov 2025
Withdrawal Update Form 1File: Serene CERTIFICATE 30062025.pdf13 Oct 2025
Withdrawal Update Form 2File: Raunak Serene Form 2.pdf13 Oct 2025
Withdrawal Update Form 3File: CA Certificate Raunak Serene 30062025.pdf13 Oct 2025
Form 2A (FY 2024-2025)File: Form 2A RC Serene.pdf13 Oct 2025
Form 1File: Form 1 Raunak Serene 31032025.pdf17 Jul 2025
Form 2File: Form 2 Engineers Certificate Raunak Serene.pdf17 Jul 2025
Form 3File: CA Certificate Raunak Serene 31032025.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: Raunak Serene 31032025.pdf17 Jul 2025
Details of encumbrancesFile: Encumbarance - Serene.pdf10 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate Raunak Serene 31122024.pdf10 Feb 2025
Disclosure of sold/ booked inventoryFile: Raunak Serene 31122024.pdf4 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Serene.pdf29 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 10_Form-2A-Raunak Serene.pdf2 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC_Raunak City Sector VI-F2_01-02-2022 (1).pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certficate-RC-F2 - 1-2-22 (1).pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_Serene_01_05_23_compressed.pdf19 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form5_Seren.pdf23 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Raunak Serene Form 2A 2023.pdf4 Oct 2023
Copy of the legal title reportFile: Legal Title Report_compressed (1).pdf2 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Raunak Serene_compressed (1).pdf2 May 2022
Proforma of Allotment letterFile: FSA-Raunak Serene.pdf2 May 2022
Layout approvalFile: Lay-out- Raunak Serene.pdf4 Mar 2022
Building plan approvalFile: Building-Plan- Raunak Serene.pdf4 Mar 2022
PAN CardFile: PAN Card.pdf4 Mar 2022
Details of encumbrancesFile: No Encumbrance Certificate.pdf4 Mar 2022
Copy of Layout Approval (in case of layout)File: Lay-out- Raunak Serene.pdf4 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Building-Plan- Raunak Serene.pdf4 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: RAUNAK SERENE CC.pdf4 Mar 2022
Declaration about Commencement CertificateFile: RAUNAK SERENE CC Declaration.pdf4 Mar 2022
Declaration in FORM BFile: Form B - Raunak Serene.pdf4 Mar 2022
CERSAI detailsFile: CERSAI_Search_Report_Shivai Nagar.pdf4 Mar 2022

Promoter's earlier projects12

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

12 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
RAUNAK CITY SECTOR IV - D9P51700017488Near Adharwadi Jail, Don Bosco School, Thane-Aug 2018CompletedDec 2027Jul 2021
RAUNAK CITY SECTOR IV - D6P51700020261KALYAN WEST, Thane-Mar 2019CompletedDec 2027Jul 2024
RAUNAK CITY SECTOR IV - D7P51700020241KALYAN WEST, Thane-Mar 2019CompletedJun 2026Jul 2024
RAUNAK CITY SECTOR IV - D5P51700020240KALYAN WEST, Thane-Mar 2019CompletedJun 2026Jul 2024
RAUNAK CITY SECTOR IV - D8P51700020182KALYAN WEST, Thane-Mar 2019CompletedDec 2025Jul 2024
RAUNAK CITY SECTOR IV - D2P51700003210KALYAN, Thane-Aug 2017CompletedDec 2025Mar 2018
RAUNAK CITY SECTOR IV - D10P51700009331KALYAN WEST, Thane-Aug 2017CompletedDec 2025Jul 2019
RAUNAK CITY SECTOR IV - D1P51700003377KALYAN, Thane-Aug 2017CompletedDec 2025Mar 2018
RAUNAK CITY SECTOR IV - D4P51700019962KALYAN WEST, Thane-Mar 2019CompletedJun 2025Jun 2023
RAUNAK CITY SECTOR IV - D3P51700019790KALYAN WEST, Thane-Mar 2019CompletedDec 2024Jun 2023
RAUNAK CITY SECTOR IIIRAUNAK CITY VILLEGE WADEGHR NEAR DON BOSCO SCHOOL ADHAR WADI JAIL ROAD KALYAN WEST 421301669-CompletedDec 2017Jul 2017
RAUNAK CITY SECTOR IIRAUNAK CITY VILLEGE WADEGHR NEAR DON BOSCO SCHOOL ADHAR WADI JAIL ROAD KALYAN WEST 421301758-CompletedDec 2015Dec 2015

How this compares with Thane

73%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 4 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RAUNAK SERENE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHIVAI NAGAR7,600+ in Thane

2 kmRAUNAK SERENECompleted 37Lapsed / revoked 14Other 50Dot size: filed unitsN

Filed coordinates, straight-line distance. 101 registered projects within 2 km.

Builder: RAUNAK CORPORATION

RAUNAK CORPORATION has 15 registrations on MahaRERA, including RAUNAK CITY SECTOR IV - D10 and RAUNAK CITY SECTOR IV - D1. Its filings disclose 12 earlier MahaRERA projects: declares 12 of 12 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if RAUNAK SERENE is delayed beyond 30 Apr 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RAUNAK SERENE?

The registered promoter entity is RAUNAK CORPORATION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RAUNAK SERENE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against RAUNAK SERENE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for RAUNAK SERENE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RAUNAK SERENE?

The professionals named in the filing: Architect: MANGESH RANE; Architect: DESIGN CONSORTIUM; Engineer: RAJAN TIPNIS; Engineer: HARSHAL MANOHARRAO POTODE; Chartered Accountant: ANKIT GOYANKA; Chartered Accountant: SANDEEP SHETH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RAUNAK SERENE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAUNAK SERENE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAUNAK SERENE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.