Home / Browse projects / Thane, Maharashtra / THE ADDRESS BUILDING NO.7/8/9
THE ADDRESS BUILDING NO.7/8/9
By STRAWBERRY CONSTRUCTIONS PVT. LTD.
RG-MH-41427 · RERA P51700010224 · Last updated on MahaRERA portal: 6 Mar 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 31 months past the filed date
- Litigation declared, 5 cases
- 7 complaints at MahaRERA
- Completion date moved by 33 months
- 2 extensions taken
Clear
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
THE ADDRESS BUILDING NO.7/8/9 is a Residential / Group Housing project by STRAWBERRY CONSTRUCTIONS PVT. LTD. in Thane, Maharashtra, registered with MahaRERA as P51700010224 on 24 Aug 2017. Possession was promised by 7 Mar 2024 and is now 31 months past that date. The completion date has moved by 33 months from the original filing. 7 complaints are on record with the regulator.
At a glance
Project
- NameTHE ADDRESS BUILDING NO.7/8/9
- TypeResidential / Group Housing
- Location
- KANAKIA ROAD
- MIRA ROAD EAST
- Mira-Bhayandar (M Corp.)
- Thane
- 401107
- Pincode401107
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700010224
- ReraGenie IDRG-MH-41427
Builder
- NameSTRAWBERRY CONSTRUCTIONS PVT. LTD.
- Entity typeCompany
- Managing DirectorsBHARAT SHANTILAL SHAH, RASHESH BHARAT SHAH, RAJIV BHARAT SHAH, RADHIKA SHAH
- Other registrations7 more →
- Completed1 of 8
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on24 Aug 2017
- Promised completion7 Mar 2024
- Revised completionRevised to 7 Mar 2024 (originally 30 Jun 2021)
- Buildings3 building records
- Documents filed91 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING NO 7/8/9 | NA | 16 | 14 | 0 | 0 | 0 |
| BUILDING NO 8 | NA | 16 | 14 | 0 | 0 | 0 |
| BUILDING NO 9 | NA | 16 | 14 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 6 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
30 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.
BUILDING NO 7/8/991%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO 891%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO 991%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 6 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed3
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| BUILDING NO 7/8/9 | 1 | 1 |
| BUILDING NO 8 | 1 | 1 |
| BUILDING NO 9 | 1 | 1 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AVINASH MHATRE AND ASSOCIATES |
| Architect | Square Architects |
| Engineer | HIREN TANNA |
| Chartered Accountant | AJAY SHAH |
| Partner | Role in project |
|---|---|
| STRAWBERRY CONSTRUCTIONS PVT. LTD. | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterCivil work of the said buildings has been completed. Due to the Covid-19 pandemic the labours and machinery are shortage. Hence, the pending work like Garden/Lifts/doors and windows fitting are in slowly process.
Reason as filed by the promoterThe Construction work of the said building was completed in all respect on December 2021. Further we have given the possession of flats to the flat owners but we were delayed to obtained ULC NOC (Urban Land Ceiling NOC) due to this reason we were unable to obtained Occupation Certificate. But now we have obtained Occupation Certificate Vide Ref. No. MNP/NR/3978/2023-2024 dated 07.03.2024 and we have already give peaceful possession to our flat buyer.
Litigation declared5
| Case | Court | Status |
|---|---|---|
| 895/2012 | COURT OF THE CIVIL JUDGE SENIOR DIVISION THANE | FOR HEARING |
| 349/2015 | DISTRICT AND SESSION COURT THANE | AWAITING NOTICE |
| 430/2016 | COURT OF THE CIVIL JUDGE SENIOR DIVISION THANE | FOR WRITTEN STATEMENT |
| 12066/2017 | BOMBAY HIGH COURT | AWAITING NOTICE |
| 484/2016 | COURT OF THE CIVIL JUDGE SENIOR DIVISION THANE | FOR WRITTEN STATEMENT |
Complaints filed with MahaRERA7
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000396208 | AMARCHAND BHAGWAT SHARMA | strawberry construction pvt. ltd. | 17/06/2023 |
| CC006000000396629 | AMARCHAND BHAGWAT SHARMA | DILESH SHAH | 19/07/2023 |
| CC006000000397712 | AMARCHAND BHAGWAT SHARMA | M/S. STRAWBERRY CONSTRUCTION PVT LTD | 05/10/2023 |
| CC006000000397715 | AMARCHAND BHAGWAT SHARMA | M/S. STRAWBERRY CONSTRUCTION PVT LTD | 05/10/2023 |
| CC12504670 | STRAWBERRY CONSTRUCTIONS PVT. LTD. | SUBUHI NIAZI | 29/12/2025 |
| CC12600054 | AMARCHAND BHAGWAT SHARMA | STRAWBERRY CONSTRUCTIONS PVT. LTD. | 04/01/2026 |
| CC12600654 | STRAWBERRY CONSTRUCTIONS PVT. LTD. | Neeraj Shetty | 04/02/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Oct 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 11 Mar 2024
Documents filed91
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate March 2023.pdf | 6 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate June 2023.pdf | 6 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Dec 2023.pdf | 6 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Engineers Certificate March 2023.pdf | 6 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Engineers Certificate June 2023.pdf | 6 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Engineers Certificate Sep 2023.pdf | 6 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Engineers Certificate Dec 2023.pdf | 6 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory.pdf | 6 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A March 2023.pdf | 6 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A June 2023.pdf | 6 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A Sep 2023.pdf | 6 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A Dec 2023.pdf | 6 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Engineers Certificate.pdf | 3 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA_Certificate_-_Form_5_-_Bldg_No_789_-_31032024.pdf | 31 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A MARCH 2024.pdf | 13 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Architect Certificate 07032024.pdf | 10 Dec 2024 |
| Certificates of CA (Form 3)File: CA Certificate Form 3.pdf | 28 Nov 2024 |
| Certificates of CA (Form 3)File: CA Certificate Form 3 Bldg No 7-8-9 30-06-2024.pdf | 27 Nov 2024 |
| Certificates of CA (Form 3)File: CA Certificate Form 3 Bldg No 7-8-9 30-09-2024.pdf | 27 Nov 2024 |
| Declaration in FORM BFile: Form B Affidavit cum Declaration.pdf | 26 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Architect Certificate.pdf | 26 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Engineers Certificate.pdf | 26 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory.pdf | 26 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf | 26 Nov 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Architect Certificate 11032024.pdf | 12 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC 2024 BUILDING NO 789.pdf | 11 Mar 2024 |
| Certificates of CA (Form 3)File: CA Certificate - Form 3 - Bldg No 7-8-9 - 31122023.pdf | 20 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA_Certificate_-_Form_5_-_Bldg_No_789_-_31032023.pdf | 31 Oct 2023 |
| Certificates of CA (Form 3)File: CA Certificate - Form 3 - Bldg No 7-8-9 - 31032023.pdf | 21 Oct 2023 |
| Certificates of CA (Form 3)File: FORM_3_CA_Certificate_TA_789.PDF | 21 Oct 2023 |
| Certificates of CA (Form 3)File: CA Certificate - Form 3 - Bldg No 7-8-9 - 30092023.pdf | 21 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Engineers Certificate.pdf | 12 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A 21-22.pdf | 12 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 22-23.pdf | 12 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A June 2023.pdf | 12 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A Sep 2023.pdf | 12 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE.pdf | 11 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Engineers Certificate.pdf | 11 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A Sep 2023.pdf | 11 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A 21-22.pdf | 11 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 22-23.pdf | 11 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A June 2023.pdf | 11 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A Sep 2023.pdf | 11 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory.pdf | 11 Oct 2023 |
| Other - TechnicalFile: Application for OC.pdf | 11 Oct 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Application for OC 7 8 9.pdf | 16 Feb 2023 |
| Certificates of CA (Form 3)File: The Address Bldg No 7-8-9.pdf | 1 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form No 5 TA-789.pdf | 17 Dec 2022 |
| Certificates of CA (Form 3)File: CA Certificate Form 3 - Bldg No 7-8-9.pdf | 16 Dec 2022 |
| Certificates of CA (Form 3)File: CA_FORM_3_TA_BLDG NO-789_09-08-2022.PDF | 13 Aug 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form No 5 TA 789.pdf | 18 Apr 2022 |
| Details of encumbrancesFile: No Encumberances Certificate.pdf | 5 Mar 2022 |
| CERSAI detailsFile: CERSAI DETAILS.pdf | 5 Mar 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Bldg No 7 8 9.pdf | 17 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate - Bldg No 7 8 9.pdf | 17 Jan 2022 |
| Certificates of CA (Form 3)File: Form 3 CA Certificate TA Bldg No-7-8-9.pdf | 17 Jan 2022 |
| Certificates of CA (Form 3)File: Form 3 CA Certificate.pdf | 26 Jun 2021 |
| Declaration about Commencement CertificateFile: Declaration About CC.pdf | 23 Jun 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 23 Jun 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A.pdf | 23 Jun 2021 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory.pdf | 23 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: SCPL FORM NO 5 201819 .pdf | 22 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: SCPL FORM 5 201920 .pdf | 22 Jun 2021 |
| Certificates of CA (Form 5)File: Form_No -5_for_Bldg_No-789.pdf | 10 Dec 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Commecement Certificate.pdf | 15 Oct 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: The Address 789 Architects Certificate.pdf | 31 Mar 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: The Address 789 Engineer Certificate.pdf | 31 Mar 2018 |
| Certificates of CA (Form 3)File: CA CERTIFICATE.pdf | 31 Mar 2018 |
| Layout approvalFile: Address789 - Approved Plan.pdf | 29 Jul 2017 |
| Building plan approvalFile: Address789 - Commencement Certificate.pdf | 29 Jul 2017 |
| Layout approvalFile: Address789 - Approved Plan17.pdf | 29 Jul 2017 |
| Layout approvalFile: Address789 - Approved Plan18.pdf | 29 Jul 2017 |
| Layout approvalFile: Address789 - Approved Plan19.pdf | 29 Jul 2017 |
| Layout approvalFile: Address789 - Approved Plan20.pdf | 29 Jul 2017 |
| Layout approvalFile: Address789 - Approved Plan21.pdf | 29 Jul 2017 |
| PAN CardFile: SCPL PAN Card.pdf | 29 Jul 2017 |
| Copy of the legal title reportFile: Address789 - Title Certificate.pdf | 29 Jul 2017 |
| Details of encumbrancesFile: Address789 - Encumbrances Certificate.pdf | 29 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Address789 - Approved Plan17.pdf | 29 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Address789 - Approved Plan18.pdf | 29 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 6 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 7 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 91 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep THE ADDRESS BUILDING NO.7/8/9 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MIRA ROAD EAST7,600+ in Thane
Filed coordinates, straight-line distance. 294 registered projects within 2 km.
Codename StarLife
JP Infra Realty Private Limited
Prestige Garden Trails
PRESTIGE ESTATES PROJECTS LIMITED
TIARA HILLS PHASE I BLDG NO 3, 5 AND 2
PNK SPACE DEVELOPMENT PVT LTD
The Palace Tower B
JP Infra Realty Private Limited
Sector 2A - Wings JKL
Eversmile Properties Private Limited
CRESCENT WTC - WESTERN TRADE CENTER - PHASE -
CRESCENT SHELTERS
See every Thane project, with the district possession charts
Builder: STRAWBERRY CONSTRUCTIONS PVT. LTD.
STRAWBERRY CONSTRUCTIONS PVT. LTD. has 8 registrations on MahaRERA, including ONYX and THE ADDRESS BUILDING NO.7/8/9. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that THE ADDRESS BUILDING NO.7/8/9 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if THE ADDRESS BUILDING NO.7/8/9 is delayed beyond 7 Mar 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of THE ADDRESS BUILDING NO.7/8/9?
The registered promoter entity is STRAWBERRY CONSTRUCTIONS PVT. LTD., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in THE ADDRESS BUILDING NO.7/8/9?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against THE ADDRESS BUILDING NO.7/8/9?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for THE ADDRESS BUILDING NO.7/8/9?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at THE ADDRESS BUILDING NO.7/8/9?
The professionals named in the filing: Architect: AVINASH MHATRE AND ASSOCIATES; Architect: Square Architects; Engineer: HIREN TANNA; Chartered Accountant: AJAY SHAH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in THE ADDRESS BUILDING NO.7/8/9?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback