Home / Browse projects / Thane, Maharashtra / THE ADDRESS BUILDING NO.7/8/9

Registration lapsed Litigation declared Residential / Group Housing project

THE ADDRESS BUILDING NO.7/8/9

By STRAWBERRY CONSTRUCTIONS PVT. LTD.

RG-MH-41427 · RERA P51700010224 · Last updated on MahaRERA portal: 6 Mar 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 31 months past the filed date
  • Litigation declared, 5 cases
  • 7 complaints at MahaRERA
  • Completion date moved by 33 months
  • 2 extensions taken

Clear

  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2024Possession promised31 months past this date
30 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
7Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

THE ADDRESS BUILDING NO.7/8/9 is a Residential / Group Housing project by STRAWBERRY CONSTRUCTIONS PVT. LTD. in Thane, Maharashtra, registered with MahaRERA as P51700010224 on 24 Aug 2017. Possession was promised by 7 Mar 2024 and is now 31 months past that date. The completion date has moved by 33 months from the original filing. 7 complaints are on record with the regulator.

At a glance

Project

  • NameTHE ADDRESS BUILDING NO.7/8/9
  • TypeResidential / Group Housing
  • Location
    • KANAKIA ROAD
    • MIRA ROAD EAST
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700010224
  • ReraGenie IDRG-MH-41427

Builder

  • NameSTRAWBERRY CONSTRUCTIONS PVT. LTD.
  • Entity typeCompany
  • Managing DirectorsBHARAT SHANTILAL SHAH, RASHESH BHARAT SHAH, RAJIV BHARAT SHAH, RADHIKA SHAH
  • Other registrations7 more →
  • Completed1 of 8
  • No longer live1 lapsed, de-registered or revoked

Key dates

31 months past promisethis monthRegisteredAug 2017First promiseJun 2021Revised toMar 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on24 Aug 2017
  • Promised completion7 Mar 2024
  • Revised completionRevised to 7 Mar 2024 (originally 30 Jun 2021)
  • Buildings3 building records
  • Documents filed91 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 7/8/9NA1614000
BUILDING NO 8NA1614000
BUILDING NO 9NA1614000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 6 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

30 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

BUILDING NO 7/8/991%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 891%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 991%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 6 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed3

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3
Closed/Covered3
BuildingClosed/CoveredTotal
BUILDING NO 7/8/911
BUILDING NO 811
BUILDING NO 911

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,429 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 May 2026

Approvals and building plan

Sanctioning authorityMira Bhayander Municipal Corporation
Permissible FSI12866.71
Proposed, not sanctioned12,867 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOPERA HOUSE MUMBAI - 400 004

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAVINASH MHATRE AND ASSOCIATES
ArchitectSquare Architects
EngineerHIREN TANNA
Chartered AccountantAJAY SHAH
PartnerRole in project
STRAWBERRY CONSTRUCTIONS PVT. LTD.-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700009922Jun 2021 → Dec 2021

Reason as filed by the promoterCivil work of the said buildings has been completed. Due to the Covid-19 pandemic the labours and machinery are shortage. Hence, the pending work like Garden/Lifts/doors and windows fitting are in slowly process.

EXT51700025218Jun 2021 → Mar 2024

Reason as filed by the promoterThe Construction work of the said building was completed in all respect on December 2021. Further we have given the possession of flats to the flat owners but we were delayed to obtained ULC NOC (Urban Land Ceiling NOC) due to this reason we were unable to obtained Occupation Certificate. But now we have obtained Occupation Certificate Vide Ref. No. MNP/NR/3978/2023-2024 dated 07.03.2024 and we have already give peaceful possession to our flat buyer.

Litigation declared5

CaseCourtStatus
895/2012COURT OF THE CIVIL JUDGE SENIOR DIVISION THANEFOR HEARING
349/2015DISTRICT AND SESSION COURT THANEAWAITING NOTICE
430/2016COURT OF THE CIVIL JUDGE SENIOR DIVISION THANEFOR WRITTEN STATEMENT
12066/2017BOMBAY HIGH COURTAWAITING NOTICE
484/2016COURT OF THE CIVIL JUDGE SENIOR DIVISION THANEFOR WRITTEN STATEMENT

Complaints filed with MahaRERA7

Case no.ComplainantRespondentFiled
CC006000000396208AMARCHAND BHAGWAT SHARMAstrawberry construction pvt. ltd.17/06/2023
CC006000000396629AMARCHAND BHAGWAT SHARMADILESH SHAH19/07/2023
CC006000000397712AMARCHAND BHAGWAT SHARMAM/S. STRAWBERRY CONSTRUCTION PVT LTD05/10/2023
CC006000000397715AMARCHAND BHAGWAT SHARMAM/S. STRAWBERRY CONSTRUCTION PVT LTD05/10/2023
CC12504670STRAWBERRY CONSTRUCTIONS PVT. LTD.SUBUHI NIAZI29/12/2025
CC12600054AMARCHAND BHAGWAT SHARMASTRAWBERRY CONSTRUCTIONS PVT. LTD.04/01/2026
CC12600654STRAWBERRY CONSTRUCTIONS PVT. LTD.Neeraj Shetty04/02/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Oct 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Mar 2024

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate March 2023.pdf6 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate June 2023.pdf6 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Dec 2023.pdf6 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Engineers Certificate March 2023.pdf6 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Engineers Certificate June 2023.pdf6 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Engineers Certificate Sep 2023.pdf6 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Engineers Certificate Dec 2023.pdf6 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A March 2023.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A June 2023.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A Sep 2023.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A Dec 2023.pdf6 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Engineers Certificate.pdf3 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA_Certificate_-_Form_5_-_Bldg_No_789_-_31032024.pdf31 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A MARCH 2024.pdf13 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Architect Certificate 07032024.pdf10 Dec 2024
Certificates of CA (Form 3)File: CA Certificate Form 3.pdf28 Nov 2024
Certificates of CA (Form 3)File: CA Certificate Form 3 Bldg No 7-8-9 30-06-2024.pdf27 Nov 2024
Certificates of CA (Form 3)File: CA Certificate Form 3 Bldg No 7-8-9 30-09-2024.pdf27 Nov 2024
Declaration in FORM BFile: Form B Affidavit cum Declaration.pdf26 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Architect Certificate.pdf26 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Engineers Certificate.pdf26 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory.pdf26 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf26 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Architect Certificate 11032024.pdf12 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC 2024 BUILDING NO 789.pdf11 Mar 2024
Certificates of CA (Form 3)File: CA Certificate - Form 3 - Bldg No 7-8-9 - 31122023.pdf20 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA_Certificate_-_Form_5_-_Bldg_No_789_-_31032023.pdf31 Oct 2023
Certificates of CA (Form 3)File: CA Certificate - Form 3 - Bldg No 7-8-9 - 31032023.pdf21 Oct 2023
Certificates of CA (Form 3)File: FORM_3_CA_Certificate_TA_789.PDF21 Oct 2023
Certificates of CA (Form 3)File: CA Certificate - Form 3 - Bldg No 7-8-9 - 30092023.pdf21 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Engineers Certificate.pdf12 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A 21-22.pdf12 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 22-23.pdf12 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A June 2023.pdf12 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A Sep 2023.pdf12 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE.pdf11 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Engineers Certificate.pdf11 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A Sep 2023.pdf11 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A 21-22.pdf11 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 22-23.pdf11 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A June 2023.pdf11 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A Sep 2023.pdf11 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory.pdf11 Oct 2023
Other - TechnicalFile: Application for OC.pdf11 Oct 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Application for OC 7 8 9.pdf16 Feb 2023
Certificates of CA (Form 3)File: The Address Bldg No 7-8-9.pdf1 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form No 5 TA-789.pdf17 Dec 2022
Certificates of CA (Form 3)File: CA Certificate Form 3 - Bldg No 7-8-9.pdf16 Dec 2022
Certificates of CA (Form 3)File: CA_FORM_3_TA_BLDG NO-789_09-08-2022.PDF13 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form No 5 TA 789.pdf18 Apr 2022
Details of encumbrancesFile: No Encumberances Certificate.pdf5 Mar 2022
CERSAI detailsFile: CERSAI DETAILS.pdf5 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Bldg No 7 8 9.pdf17 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate - Bldg No 7 8 9.pdf17 Jan 2022
Certificates of CA (Form 3)File: Form 3 CA Certificate TA Bldg No-7-8-9.pdf17 Jan 2022
Certificates of CA (Form 3)File: Form 3 CA Certificate.pdf26 Jun 2021
Declaration about Commencement CertificateFile: Declaration About CC.pdf23 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf23 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A.pdf23 Jun 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory.pdf23 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: SCPL FORM NO 5 201819 .pdf22 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: SCPL FORM 5 201920 .pdf22 Jun 2021
Certificates of CA (Form 5)File: Form_No -5_for_Bldg_No-789.pdf10 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: Commecement Certificate.pdf15 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: The Address 789 Architects Certificate.pdf31 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: The Address 789 Engineer Certificate.pdf31 Mar 2018
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf31 Mar 2018
Layout approvalFile: Address789 - Approved Plan.pdf29 Jul 2017
Building plan approvalFile: Address789 - Commencement Certificate.pdf29 Jul 2017
Layout approvalFile: Address789 - Approved Plan17.pdf29 Jul 2017
Layout approvalFile: Address789 - Approved Plan18.pdf29 Jul 2017
Layout approvalFile: Address789 - Approved Plan19.pdf29 Jul 2017
Layout approvalFile: Address789 - Approved Plan20.pdf29 Jul 2017
Layout approvalFile: Address789 - Approved Plan21.pdf29 Jul 2017
PAN CardFile: SCPL PAN Card.pdf29 Jul 2017
Copy of the legal title reportFile: Address789 - Title Certificate.pdf29 Jul 2017
Details of encumbrancesFile: Address789 - Encumbrances Certificate.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: Address789 - Approved Plan17.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: Address789 - Approved Plan18.pdf29 Jul 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 33 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THE ADDRESS BUILDING NO.7/8/9 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MIRA ROAD EAST7,600+ in Thane

2 kmTHE ADDRESS BUILDING NO.Completed 106Lapsed / revoked 79Other 109Dot size: filed unitsN

Filed coordinates, straight-line distance. 294 registered projects within 2 km.

Builder: STRAWBERRY CONSTRUCTIONS PVT. LTD.

STRAWBERRY CONSTRUCTIONS PVT. LTD. has 8 registrations on MahaRERA, including ONYX and THE ADDRESS BUILDING NO.7/8/9. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that THE ADDRESS BUILDING NO.7/8/9 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if THE ADDRESS BUILDING NO.7/8/9 is delayed beyond 7 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE ADDRESS BUILDING NO.7/8/9?

The registered promoter entity is STRAWBERRY CONSTRUCTIONS PVT. LTD., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE ADDRESS BUILDING NO.7/8/9?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against THE ADDRESS BUILDING NO.7/8/9?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for THE ADDRESS BUILDING NO.7/8/9?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE ADDRESS BUILDING NO.7/8/9?

The professionals named in the filing: Architect: AVINASH MHATRE AND ASSOCIATES; Architect: Square Architects; Engineer: HIREN TANNA; Chartered Accountant: AJAY SHAH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE ADDRESS BUILDING NO.7/8/9?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE ADDRESS BUILDING NO.7/8/9. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE ADDRESS BUILDING NO.7/8/9 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.