Completed Litigation declared Others project

THARWANI ARIANA PHASE IV

By ANIL HARDASMAL THARWANI

RG-MH-48450 · RERA P51700047534 · Last updated on MahaRERA portal: 23 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 3 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2026Possession promisedregistration recorded completed
8 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 6%
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

THARWANI ARIANA PHASE IV is a Others project by ANIL HARDASMAL THARWANI in Thane, Maharashtra, registered with MahaRERA as P51700047534 on 7 Nov 2022. The registration is recorded completed; possession was promised by 30 Jun 2026.

At a glance

Project

  • NameTHARWANI ARIANA PHASE IV
  • TypeOthers
  • Location
    • BARVE DAM ROAD
    • CHIKLOLI
    • Ambarnath(M Cl)
    • Ambarnath
    • Thane
    • 421501
  • Pincode421501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700047534
  • ReraGenie IDRG-MH-48450

Builder

  • NameANIL HARDASMAL THARWANI
  • Entity typeIndividual
  • Other registrations10 more →
  • Completed6 of 11
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

this monthRegisteredNov 2022PromisedJun 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on7 Nov 2022
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed68 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
E1- MELODYNA260000
E2- NEBULANA260000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 23 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 6%.

E1- MELODY36%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E2- NEBULA37%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure6%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed86

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots86
Closed/Covered2
Open Space84
BuildingClosed/CoveredOpen SpaceTotal
E1- MELODY14243
E2- NEBULA14243

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,640 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityAMBERNATH MUNICIPAL COUNCIL
Permissible FSI28719.84
Proposed, not sanctioned18,580 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKHADAKPADA 421301

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBAJAJ AND ASSOCIATES
EngineerKIRAN SHARAD WARE
Chartered AccountantSUNNY BHAGIA AND ASSOCIATES
PartnerRole in project
ANIL HARDASMAL THARWANI-

Litigation declared2

CaseCourtStatus
539/2015CHOPRA COURTKEPT FOR DISMISSAL ORDER
11/2013KALYANPENDING FOR HEARING AND FINAL DISPOSAL

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jul 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: ARIANA PHASE 4 SIGNED FORM 2A_compressed.pdf23 Apr 2026
Form 5 (FY 2024-2025)File: Final Form 5_Tharwani Ariana Phase IV_ 2024- 25.pdf3 Feb 2026
Form 1File: Form 1_Ariana Ph IV March 2025.pdf12 Jul 2025
Form 2File: Form 2_Ariana Ph IV 25032025.pdf12 Jul 2025
Form 3File: Scanned Form 3_Tharwani Ariana Phase IV_compressed.pdf12 Jul 2025
Disclosure of Sold and Booked InventoryFile: Ariana Ph IV_Sold Booked_25032025_compressed.pdf12 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A_Ariana Phase IV_2024-25.pdf4 Jul 2025
Occupational CertificateFile: Part OC of Ariana Shops.pdf12 Jun 2025
Form 3File: Scanned Form 3_Ariana Ph IV Dec 2024_compressed.pdf20 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ariana.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Ariana Ph IV Dec 2024.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Ariana_Sept 2024.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scanned Form 3_Ariana Ph IV_Sep 2024_compressed.pdf6 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Ariana_June 2024.pdf31 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scanned Form 3 Ariana Ph IV_compressed.pdf17 Dec 2024
Proforma of Agreement for saleFile: ARIANA PHASE IV - AGREEMENT FOR SALE.pdf25 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Ariana Ph IV_Sep 2024.pdf19 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FINAL FORM-5 ARIANA PHASE-IV SCANNED.pdf9 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Tharawani Ariana Phase IV.pdf31 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2 ARIANA PHASE - IV_compressed.pdf27 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: THARAWANI ARIANA PHASE -IV.pdf27 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3_Ariana Ph IV_March 2024.pdf8 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-THARWANI REALTY ARIANA PHASE 4.pdf1 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Tharwani Ariana Phase IV.pdf26 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Arina Phase IV-December 2023_Final with UDIN.pdf17 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ariana phase 4- Form 1.pdf25 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ariana phase 4 Form 2.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 Ariana Phase IV_Sep 2023.pdf16 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARIANA PHASE 4 form 1.pdf13 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Final Form 5- Signed with UDIN.pdf29 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ariana phase 4 form 1.pdf27 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ARIANA PHASE 4 FORM 2.pdf27 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3- Signed_compressed.pdf27 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_March 2023_Ariana Phase IV.pdf22 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_March 2023_Ariana Phase IV.pdf22 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Arina Phase IV-Mar 2023_Final_14072023.pdf19 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_ARIANA phase 4_FY 2223.pdf13 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ariana Phase IV - Sept 2022_Final Scanned 12.pdf17 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ariana Phase IV Dec 2022_Final Scanned_compressed.pdf17 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Ariana Phase IV Sept 22.pdf16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Ariana Phase IV Dec 22.pdf16 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DocScanner 14 Feb 2023 11-53 am.pdf15 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30june 22ariana ph4 form 1.pdf14 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30september22 Ariana phase 4 form 1.pdf14 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31 December 22 Ariana phase 4 form 1.pdf14 Feb 2023
Proforma of Agreement for saleFile: Tharwani Ariana AFS.pdf22 Oct 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report AFS (2).pdf22 Oct 2022
Details of encumbrances concerned to LegalFile: Declaration of Encumbrance.pdf15 Oct 2022
Deviation Report with respect to Allotment letterFile: Deviation Report (Allotment Letter).pdf13 Sep 2022
Proforma of Allotment letterFile: Allotment letter draft (2).pdf12 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised Form 3 Arina Phase IV_Modified (1).pdf5 Sep 2022
Copy of the legal title reportFile: Title certificate_compressed_11zon.pdf30 Aug 2022
Declaration in FORM BFile: Form B Declaration.pdf30 Aug 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration for Bank Ac.pdf30 Aug 2022
Other - LegalFile: Declaration for litigation.pdf30 Aug 2022
Layout approvalFile: layout Plan.pdf15 Jul 2022
Building plan approvalFile: Building Plan 1.pdf15 Jul 2022
Building plan approvalFile: Building Plan 2.pdf15 Jul 2022
Copy of Layout Approval (in case of layout)File: layout Plan.pdf15 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 1.pdf15 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 2.pdf15 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: Ariana latest CC.pdf15 Jul 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Designated Bank Account.pdf15 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architect's Certificate.pdf8 Jun 2022
CERSAI detailsFile: Cersai_compressed.pdf28 May 2022
PAN CardFile: 1 PAN Card.pdf25 May 2022
Details of encumbrancesFile: No encumbrance scan.pdf25 May 2022
Declaration about Commencement CertificateFile: Declaration of Commencement certi scan-compressed.pdf25 May 2022

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
THARWANI ARIANA PHASE ISURVEY NO. 133 1 AND 133 1 P VILLAGE CHIKHLOLI TALKUA KALYAN238CompletedDec 2016Dec 2016
RIVERDALE VISTASURVEY NO 25 HISSA NO 1 VILLAGE BARAVE TALUKA KALYAN DIST THANE188CompletedSep 2016Sep 2016
ROSEWOOD HEIGHTSPLOT NO 270 SECTOR 10 KHARGHAR NAVI MUMBAI234CompletedMar 2012Mar 2012

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THARWANI ARIANA PHASE IV on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHIKLOLI7,600+ in Thane

2 kmTHARWANI ARIANA PHASE IVCompleted 55Lapsed / revoked 26Other 28Dot size: filed unitsN

Filed coordinates, straight-line distance. 109 registered projects within 2 km.

Builder: ANIL HARDASMAL THARWANI

ANIL HARDASMAL THARWANI has 11 registrations on MahaRERA, including THARWANI ARIANA PHASE II and THARWANI ARIANA PHASE III. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if THARWANI ARIANA PHASE IV is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THARWANI ARIANA PHASE IV?

The registered promoter entity is ANIL HARDASMAL THARWANI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THARWANI ARIANA PHASE IV?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THARWANI ARIANA PHASE IV?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THARWANI ARIANA PHASE IV?

The professionals named in the filing: Architect: BAJAJ AND ASSOCIATES; Engineer: KIRAN SHARAD WARE; Chartered Accountant: SUNNY BHAGIA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THARWANI ARIANA PHASE IV?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THARWANI ARIANA PHASE IV. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THARWANI ARIANA PHASE IV to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.