Completed No litigation declared Residential / Group Housing project

THAPAR SUBURBIA

By VEDHAS REALTORS PVT LTD

RG-MH-14469 · RERA P51800023381 · Last updated on MahaRERA portal: 5 Jun 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2025Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 140 documents Report an error

THAPAR SUBURBIA is a Residential / Group Housing project by VEDHAS REALTORS PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800023381 on 12 Dec 2019. The registration is recorded completed; possession was promised by 30 Jun 2025.

At a glance

Project

  • NameTHAPAR SUBURBIA
  • TypeResidential / Group Housing
  • Location
    • N G ACHARYA MARG
    • GOVANDI EAST CHEMBUR
    • Kurla
    • Mumbai Suburban
    • 400088
  • Pincode400088
  • RERA no.P51800023381
  • ReraGenie IDRG-MH-14469

Builder

  • NameVEDHAS REALTORS PVT LTD
  • Entity typeCompany
  • DirectorsDINESH PARASRAM THAPAR, PARESH DAMODARDAS MAHANT, RAKESH SHAYAMLAL CHAUMAL

Key dates

this monthRegisteredDec 2019PromisedJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on12 Dec 2019
  • Promised completion30 Jun 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed140 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
THAPAR SUBURBIANA220000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Jun 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

THAPAR SUBURBIA: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 5 Jun 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed105

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots105
Closed/Covered92
Open Space13

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,024 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI6558.63
Proposed, not sanctioned6,554 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCHEMBUR

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectB H WADHWA
ArchitectPOSITRON
EngineerRAM MUKE ADVANCE CREATIVEDESIGN CONSULTANATS
EngineerDATTA VADAK
Chartered AccountantBimal R. Mehta & Associates
Chartered AccountantSHASHANK R JAIN
PartnerRole in project
VEDHAS REALTORS PVT LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Nov 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Nov 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 May 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 Jun 2023

Documents filed140

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 140 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 31032023 Vedhas.pdf5 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A ENGINEERS CERTIFICATE FOR QUALITY ASSURANCE.pdf5 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 - Vedhas 2023.pdf28 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE 30092022 Uploaded.pdf18 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE 30092022 Uploaded.pdf18 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: fORM 1 Architect Certificate 30062023_compressed.pdf18 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE 30092022 Uploaded.pdf18 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE 30092022 Uploaded.pdf18 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE 30062023.pdf18 Jul 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD 30-06-2023.pdf18 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Vedhas 30062023_compressed.pdf18 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PART OC.pdf21 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCC FINAL.pdf21 Jun 2023
Architect’s Certificate on Completion of Project (Form 4)File: FORM-4 ARCHITECT CERTIFICATES.pdf21 Jun 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Shilpshree registration society certificate.pdf20 Jun 2023
Status of ConveyanceFile: DEEMED CONVEYANCE SHILPSHREE.pdf20 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 A R Associates.pdf15 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31032023 Vedhas compress.pdf15 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 A R Associates_compressed.pdf15 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31032023 Vedhas_compressed.pdf15 Apr 2023
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold Inventory 31032023 Vedhas.pdf15 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31032023 Vedhas_compressed.pdf15 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1_Thapar_31-12-2022.pdf13 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2_Thapar_31-12-2022.pdf13 Jan 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf13 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_Thapar_31-12-2022_compressed.pdf13 Jan 2023
Details of encumbrances concerned to LegalFile: Encumerance to Legal.pdf19 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE 30092022 Uploaded.pdf19 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE 30092022 Uploaded.pdf19 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf19 Oct 2022
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold and Unsold Inventory 30-09-2022 Uploaded.pdf19 Oct 2022
CERSAI detailsFile: cersai.pdf19 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_Thapar_30-09-2022_Uploaded.pdf19 Oct 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration.pdf19 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form-5 Vedhas 2022 Signed copy.pdf30 Sep 2022
OtherFile: Form-5 Vedhas 2022 Signed copy.pdf29 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 30062022_compressed.pdf12 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 30062022_compressed.pdf12 Jul 2022
Disclosure of sold/ booked inventoryFile: discolsure of Sold Unsold inventory 30062022_compressed.pdf12 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_30062022_Thappar Builders_compressed.pdf12 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 (ARCHITECT) 310322_compressed.pdf20 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Apr 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory.pdf20 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf20 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 (ARCHITECT) 311221 NEW FORMAT_compressed.pdf28 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 (ENGINEER) 31122021 Final_compressed.pdf28 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 (ENGINEER) 31122021 Final_compressed.pdf28 Feb 2022
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold and Unsold Inventory - 31-12-2021.pdf28 Feb 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Scanned_compressed.pdf28 Feb 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold 30092021.pdf16 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1ARCHITECT.pdf15 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ENGINEER.pdf15 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 Costing To CA - 30-09-2021 (2).pdf15 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 RERA 2021.pdf30 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A 31-03-2021_Compressed.pdf10 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate.pdf6 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate.pdf6 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A Quality Assurance Certificate.pdf6 Aug 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold 31-03-2021.pdf6 Aug 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold 30-06-2021.pdf6 Aug 2021
Declaration about Commencement CertificateFile: Full CC Declaration.pdf24 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: FORMAT - D 16062021.pdf16 Jun 2021
Building plan approvalFile: Plan -1.pdf3 May 2021
Building plan approvalFile: PLANS 2-3.pdf3 May 2021
Building plan approvalFile: PLANS 4-5.pdf3 May 2021
Building plan approvalFile: PLANS 6-7-8.pdf3 May 2021
Building plan approvalFile: PLANS 9-10.pdf3 May 2021
Building plan approvalFile: AMENDED PLANS 06022021.pdf3 May 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan -1.pdf3 May 2021
Building Plan Approval / NA Order for plotted developmentFile: PLANS 2-3.pdf3 May 2021
Building Plan Approval / NA Order for plotted developmentFile: PLANS 4-5.pdf3 May 2021
Building Plan Approval / NA Order for plotted developmentFile: PLANS 6-7-8.pdf3 May 2021
Building Plan Approval / NA Order for plotted developmentFile: PLANS 9-10.pdf3 May 2021
Building Plan Approval / NA Order for plotted developmentFile: AMENDED PLANS 06022021.pdf3 May 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-I (ARCHITECT) 31-03-2021_Compressed.pdf3 May 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 (ENGINEER) 31-03-2021_Compressed.pdf3 May 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 Final_Compressed.pdf3 May 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 Final_Compressed.pdf3 May 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BH WADHWA (Form-1)_Compressed.pdf10 Feb 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cert - Thapar Suburbia_Compressed.pdf10 Feb 2021

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THAPAR SUBURBIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GOVANDI EAST CHEMBUR6,700+ in Mumbai Suburban

Builder: VEDHAS REALTORS PVT LTD

VEDHAS REALTORS PVT LTD has 1 registration on MahaRERA, including THAPAR SUBURBIA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if THAPAR SUBURBIA is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THAPAR SUBURBIA?

The registered promoter entity is VEDHAS REALTORS PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THAPAR SUBURBIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THAPAR SUBURBIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THAPAR SUBURBIA?

The professionals named in the filing: Architect: B H WADHWA; Architect: POSITRON; Engineer: RAM MUKE ADVANCE CREATIVEDESIGN CONSULTANATS; Engineer: DATTA VADAK; Chartered Accountant: Bimal R. Mehta & Associates; Chartered Accountant: SHASHANK R JAIN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THAPAR SUBURBIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THAPAR SUBURBIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THAPAR SUBURBIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.