Home / Browse projects / Thane, Maharashtra / Thane Shivam Chs Ltd

Registered No litigation declared Others project

Thane Shivam Chs Ltd

By Mahesh Shriram Borkar

RG-MH-49900 · RERA P51700048226 · Last updated on MahaRERA portal: 4 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Internal walls, 85%
6 of 37Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

Thane Shivam Chs Ltd is a Others project by Mahesh Shriram Borkar in Thane, Maharashtra, registered with MahaRERA as P51700048226 on 19 Dec 2022. Possession is promised by 31 Dec 2026. 31 of the 37 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameThane Shivam Chs Ltd
  • TypeOthers
  • Location
    • Near Express Highway
    • Pachpakhadi
    • Thane (M Corp.)
    • Thane
    • 400602
  • Pincode400602
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700048226
  • ReraGenie IDRG-MH-49900

Builder

  • NameMahesh Shriram Borkar
  • Entity typeIndividual
  • Other registrations7 more →
  • Completed7 of 8
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Dec 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed81 files

Current status

84%31 of 37 units booked
53.2%Work done, per cost certificate

Figures as on 4 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Thane Shivam CHS LTDNA161529837

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 85%.

Thane Shivam CHS LTD: 67% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities15

As on 4 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes40%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed60

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots60
Closed/Covered54
Open Space6

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,128 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Feb 2026
LandownerVillageDistrict
Thane Shivam Co-Operative Housing Society LtdKalwarThane

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI3713.47
Proposed, not sanctioned3,713 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRam Maruti Road, Naupada, Thane West
Estimated costRs 16.68 cr
Cost incurredRs 8.87 cr
Work done53.19%
BuildingWingEstimatedIncurred
Thane Shivam CHS LTDNARs 16.68 crRs 8.87 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMakarand Torasakar & Associates
EngineerRohit Birwadkar
Chartered AccountantDinesh Kori
Chartered AccountantDeepak Gage
PartnerRole in project
Mahesh Shriram Borkar-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A - March 26 .pdf4 Jul 2026
Form 2A (FY 2022-2023)File: Form 2A - March 23 .pdf4 Jul 2026
Form 2A (FY 2023-2024)File: Form 2A - March 24 .pdf4 Jul 2026
Withdrawal Update Form 1File: AR - thane shivam - march 26.pdf30 Apr 2026
Withdrawal Update Form 2File: Form 2 - Engg Certificate Thane Shivam March 2026.pdf30 Apr 2026
Withdrawal Update Form 3File: CA Mar 26.pdf30 Apr 2026
Form 1File: AR.pdf21 Mar 2026
Form 2File: Form 2.pdf21 Mar 2026
Form 3File: Form 3.pdf21 Mar 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory-Thane Shivam March 2025.pdf21 Mar 2026
Form 2A (FY 2024-2025)File: Form 2A - March 25 - Thane shivam .pdf21 Mar 2026
Form 5 (FY 2022-2023)File: RERA Audit 2022-23.pdf21 Mar 2026
Form 1File: AR -Thane shivam Dec 25 .pdf31 Jan 2026
Form 2File: Form 2 - Engg Certificate Thane Shivam Dec 2025.pdf31 Jan 2026
Form 3File: THANE SHIVAM FORM 3 DEC 2025.pdf31 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure - Dec 25 Thane shivam .pdf31 Jan 2026
Form 1File: AR - Sep 25 - Thane Shivam - Work Completion.pdf11 Nov 2025
Form 2File: ER - Sep 25 - Thane Shivam - Engineer cert - IIIrd Quarter.pdf11 Nov 2025
Form 3File: CA - Sep 25 - Thane Shivam - Financial Work Progress - IInd Quarter.pdf11 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure - Sep 25.pdf11 Nov 2025
Form 1File: AR - June 25 - Thane Shivam June 2025.pdf7 Nov 2025
Form 2File: ER - June 25 - Thane Shivam June 2025.pdf7 Nov 2025
Form 3File: CA - June 25 - Thane Shivam - Financial Work Progress - 1st Quarter.pdf7 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory-Thane Shivam June 2025.pdf7 Nov 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: sivam form 3 march.pdf26 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engg Certificate Thane Shivam March 2025.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR.pdf25 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory-Thane Shivam March 2025.pdf25 Apr 2025
Other - TechnicalFile: Quality Assurance Certificate Form 2A- Thane Shivam.pdf25 Apr 2025
Building plan approvalFile: Thane Shivam Approved Plans FINAL-1.pdf24 Apr 2025
Building plan approvalFile: Thane Shivam Approved Plans FINAL-2-3-1.pdf24 Apr 2025
Building plan approvalFile: Thane Shivam Approved Plans FINAL-2-3-2.pdf24 Apr 2025
Building plan approvalFile: Thane Shivam Approved Plans FINAL-4-5.pdf24 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: Thane Shivam CC FINAL.pdf24 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Thane Shivam Approved Plans FINAL-1.pdf24 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Thane Shivam Approved Plans FINAL-2-3-1.pdf24 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Thane Shivam Approved Plans FINAL-2-3-2.pdf24 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Thane Shivam Approved Plans FINAL-4-5.pdf24 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory-Thane Shivam March 2025.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Thane Shivam 30 Sep 2024.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engg Certificate Thane Shivam Sept 24.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engg Certificate Thane Shivam Dec 24.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR (2).pdf14 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure 1.pdf14 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory-Thane Shivam December 2024.pdf14 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate Form 2A- Thane Shivam.pdf6 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory-Thane Shivam 31_03_2024.pdf6 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 Shivam chs.pdf4 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Thane Shivam 30 December 23.pdf19 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory-Thane Shivam 08_01_2024 PDF.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Letter Thane Shivam 30 Sep 23.pdf18 Oct 2023
Other - LegalFile: Architect Letter Thane Shivam 30 Sep 23.pdf18 Oct 2023
Disclosure of sold/ booked inventoryFile: Trushna Disclos of Sold and Booked Inventory 30 Sep 23.pdf5 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory-Thane Shivam 06_07_2023.pdf10 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Thane Shivam Quarterly Updation 31 March 2023.pdf6 Jun 2023
Disclosure of sold/ booked inventoryFile: Thane Shivam Disclosure of Sold and Booked Inventory 31 March 23.pdf6 Jun 2023
Other - TechnicalFile: Engineers Quality Asurance Certificare THANE SHIVAM.pdf16 May 2023
Proforma of Agreement for saleFile: Agreement to Sale as per Deviation Report 08 12 2022.pdf13 Dec 2022
Other - FinanceFile: Mahesh Borker CA certificate-final.pdf6 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account Declaration-Thane Shivam Chs Ltd.pdf5 Dec 2022
Deviation Report with respect to model copy of AgreementFile: Deviation for Agreement For Sale 24 11 2022.pdf5 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mahesh Boarkar _ Initial _ Signed .pdf21 Nov 2022
Copy of the legal title reportFile: Title Certificate - Thane Shivam .pdf19 Nov 2022
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Finance-Thane Shivam Chs Ltd.pdf18 Nov 2022
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Legal-Thane Shivam Chs Ltd.pdf18 Nov 2022
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Finance-Thane Shivam Chs Ltd.pdf18 Nov 2022
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal-Thane Shivam Chs Ltd.pdf18 Nov 2022
Declaration about Commencement CertificateFile: Form D-Thane Shivam Chs Ltd.pdf18 Nov 2022
Declaration in FORM BFile: Form B of Developers.pdf18 Nov 2022
CERSAI detailsFile: CRESAI Report.pdf18 Nov 2022
Proforma of Allotment letterFile: Allotment Letter-Thane Shivam Chs Ltd.pdf18 Nov 2022
Deviation Report with respect to Allotment letterFile: Deviation of Allotment Letter-thane shivam.pdf18 Nov 2022
Layout approvalFile: Approved Plans compressed.pdf11 Nov 2022
Building plan approvalFile: Approved Plans compressed.pdf11 Nov 2022
PAN CardFile: Mahesh Borkar Pan Card.pdf11 Nov 2022
Copy of Layout Approval (in case of layout)File: Approved Plans compressed.pdf11 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: Approved Plans compressed.pdf11 Nov 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Kamdhenu Prasad Co-operative Housing Society LimitedTikka number 15 CTS number 28 c42CompletedDec 2018Sep 2017

How this compares with Thane

84%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Thane Shivam Chs Ltd on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pachpakhadi7,600+ in Thane

2 kmThane Shivam Chs LtdCompleted 121Lapsed / revoked 78Other 160Dot size: filed unitsN

Filed coordinates, straight-line distance. 359 registered projects within 2 km.

Builder: Mahesh Shriram Borkar

Mahesh Shriram Borkar has 8 registrations on MahaRERA, including Kamdhenu Prasad CHS Ltd. and Gautam Co-operative Housing Society. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Thane Shivam Chs Ltd is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Thane Shivam Chs Ltd?

The registered promoter entity is Mahesh Shriram Borkar, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Thane Shivam Chs Ltd?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Thane Shivam Chs Ltd?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Thane Shivam Chs Ltd?

The professionals named in the filing: Architect: Makarand Torasakar & Associates; Engineer: Rohit Birwadkar; Chartered Accountant: Dinesh Kori; Chartered Accountant: Deepak Gage. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Thane Shivam Chs Ltd?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Thane Shivam Chs Ltd. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Thane Shivam Chs Ltd to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.