ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / terminal ONE

Completed No litigation declared Commercial project

terminal ONE

By AVNEE AND TEJAS ASSOCIATES

RG-MH-04692 · RERA P52100020386 · Last updated on MahaRERA portal: 11 Dec 2024

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
14 of 22Construction stages doneacross 2 buildings; furthest along: External plumbing and external plaster, 98%
1Complaints at MahaRERAon this registration
Jump to the 101 documents Report an error

terminal ONE is a Commercial project by AVNEE AND TEJAS ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100020386 on 9 Apr 2019. The registration is recorded completed; possession was promised by 30 Dec 2026. 1 complaint is on record with the regulator.

At a glance

Project

  • Nameterminal ONE
  • TypeCommercial
  • Location
    • Hinjewadi Phase II Road
    • Hinjewadi Phase II
    • Hinjavadi (CT)
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • RERA no.P52100020386
  • ReraGenie IDRG-MH-04692

Builder

  • NameAVNEE AND TEJAS ASSOCIATES
  • Entity typePartnership
  • PartnersGAUTAM NARENDRA KAPUR, UDAYKUMAR GHANANAND CHITNIS, FAROOKH PHEROZE SETHNA, DARSHAN TARUNKUMAR DHUMAVAT, MAHANTESH BABULAL PALRESHA, SACHIN SUBHASHCHAND BOHARA

Key dates

this monthRegisteredApr 2019PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Apr 2019
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed101 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA80000
BNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 11 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is External plumbing and external plaster, at 98%.

A82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B70%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises92%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 11 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes75%
Water SupplyYes30%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes40%
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes70%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes90%

Parking filed912

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots912
Closed/Covered862
Open Space50

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area17,450 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
Treon InvestmentsPune (M Corp.)Pune
Global Sakhare AssociatesPune (M Corp.)Pune
Malhari Pandurang SakhareHinjavadi (CT)Pune
Ashok Pandurang RanawadePune (M Corp.)Pune

Approvals and building plan

Permissible FSI27601.0
Proposed, not sanctioned23,424 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, 28/2, North Main Road, Koregaon Park, Pune - 411001

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA DESIGN STUDIO
EngineerAMIT DORLE
Chartered AccountantK G Jhamvar & Co
Chartered AccountantBirla And Company
PartnerRole in project
AVNEE AND TEJAS ASSOCIATES-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12502306MS MALAA TREONAVNEE AND TEJAS ASSOCIATES08/07/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Mar 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Mar 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Dec 2024

Documents filed101

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ATA FORM 1 ARCHITECTS CERTIFICATE JUN 24.pdf11 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ATA Architects ertificate -Sept -24.pdf11 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ATA Engineer Certificate Jun 2024.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ATA Engineers Certificate Sept- 24.pdf11 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FINAL COMPLETION CERTIFICATE_compressed.pdf11 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Form 5 - Terminal One - Signed.pdf6 Nov 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration Format A on Separate Bank Account.pdf8 Jul 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration on Separate bank account - Developer.pdf14 May 2024
Certificates of CA (Form 3)File: ATA Form 3 - March -24_compressed.pdf13 May 2024
Declaration about Commencement CertificateFile: ATA - Declaration About Commencement Certificate.pdf11 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ATA - Architect Certificate - Terminal One.pdf11 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ATA - Engineer Certificate - 31-03-2024.pdf11 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: ATA - Form 2A - 31-03-2020.pdf11 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ATA - Form 2A - 31-03-2021.pdf11 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: ATA - Form 2A - 31-03-2022.pdf11 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ATA - Form 2A - 31-03-2023.pdf11 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ATA - Form 2A - 31-03-2024.pdf11 May 2024
Disclosure of sold/ booked inventoryFile: ATA - Disclosure of Sold-Booked Inventory.pdf11 May 2024
Layout approvalFile: 1.pdf2 May 2024
Copy of Layout Approval (in case of layout)File: 1.pdf2 May 2024
Commencement Certificates / NA Order for plotted developmentFile: CC_compressed.pdf2 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ATA - Architect Certificate - 31 Dec 2023.pdf2 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ATA FORM 1 ARCHITECTS CERTIFICATE JAN TO MARCH 24.pdf2 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ATA - Engineers Certificate - Dec-23.pdf2 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ATA ENGINEER CERTIFICATE MARCH -24.pdf2 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold or Booked Inventory - Dec 23.pdf2 May 2024
Certificates of CA (Form 3)File: CA Certificate - terminal one - Dec 23.pdf2 May 2024
Certificates of CA (Form 3)File: CA Certificate - terminal one - Mar 24_compressed.pdf2 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ATA Architect Certificate Form 1- Fy-2021-22 Qtr-2.pdf22 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ATA Architect Certificate Form 1- Fy-2021-22 Qtr-3.pdf22 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Jun-22_compressed.pdf22 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sep-22_compressed.pdf22 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Dec-22_compressed.pdf22 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ATA - Architects Certificate Form 1 Mar-2023.pdf22 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ATA - Architect Certificate Form 1 - 30 JUNE 2023.pdf22 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ATA - Architect Certificate - 31 Dec 2023.pdf22 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sep 23.pdf22 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ATA Engineering Certificate Form 2- Fy-2021-22 Qtr-2.pdf22 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ATA Engineering Certificate Form 2- Fy-2021-22 Qtr-3.pdf22 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate Mar-22.pdf22 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate Jun-22.pdf22 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate Sep-22.pdf22 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate Dec-22.pdf22 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ATA - Engineers Certificate - Mar23.pdf22 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Terminal ONE - June 23.pdf22 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - Sept-23.pdf22 Mar 2024
Certificates of CA (Form 3)File: Form 3 - Sep 22_compressed.pdf22 Mar 2024
Certificates of CA (Form 3)File: Form 3 - Dec 22_compressed.pdf22 Mar 2024
Certificates of CA (Form 3)File: Form 3 Mar 23_compressed.pdf22 Mar 2024
Certificates of CA (Form 3)File: Form 3 June 23_compressed.pdf22 Mar 2024
Certificates of CA (Form 3)File: Form 3 - Signed_compressed.pdf22 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA Form 5 - Terminal One - Signed.pdf25 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Jun-22_compressed.pdf2 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ATA Architect Certificate Form 1- Fy-2021-22 Qtr-3.pdf2 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ATA Architect Certificate Form 1- Fy-2021-22 Qtr-2.pdf2 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ATA Architect Certificate Form 1- Fy-2021-22 Qtr-1.pdf2 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate Jun-22.pdf2 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate Mar-22.pdf2 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ATA Engineering Certificate Form 2- Fy-2021-22 Qtr-3.pdf2 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ATA Engineering Certificate Form 2- Fy-2021-22 Qtr-2.pdf2 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ATA Engineering Certificate Form 2- Fy-2021-22 Qtr-1.pdf2 Mar 2023
Certificates of CA (Form 3)File: CA Certificate - terminal one - June 21.pdf2 Mar 2023
Certificates of CA (Form 3)File: CA Certificate - terminal one - Dec 21.pdf2 Mar 2023
Certificates of CA (Form 3)File: CA Certificate - terminal one - Sep 21.pdf2 Mar 2023
Certificates of CA (Form 3)File: CA Certificate - terminal one - Mar 22.pdf2 Mar 2023
Certificates of CA (Form 3)File: CA Certificate - terminal one - June 22.pdf2 Mar 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate Terminal 1 A Part Completion.pdf18 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion cerificate 17 01 2023_compressed.pdf18 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sep-22_compressed.pdf14 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Dec-22_compressed.pdf14 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate Sep-22.pdf14 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate Dec-22.pdf14 Feb 2023
Certificates of CA (Form 3)File: Form 3 - Sep 22_compressed.pdf14 Feb 2023
Certificates of CA (Form 3)File: Form 3 - Dec 22_compressed.pdf14 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5.pdf17 Dec 2022
Details of encumbrancesFile: Encumbrances Certificate dated 17-05-2022-compressed.pdf17 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Terminal One Form 1 (Oct_2020 to Dec_2020)_compressed.pdf5 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Oct to Dec-20_compressed.pdf5 Apr 2022
Certificates of CA (Form 3)File: CA Certificate - terminal ONE - Dec 20_compressed.pdf5 Apr 2022

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep terminal ONE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hinjewadi Phase II13,700+ in Pune

Builder: AVNEE AND TEJAS ASSOCIATES

AVNEE AND TEJAS ASSOCIATES has 1 registration on MahaRERA, including terminal ONE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if terminal ONE is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of terminal ONE?

The registered promoter entity is AVNEE AND TEJAS ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in terminal ONE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against terminal ONE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for terminal ONE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at terminal ONE?

The professionals named in the filing: Architect: A DESIGN STUDIO; Engineer: AMIT DORLE; Chartered Accountant: K G Jhamvar & Co; Chartered Accountant: Birla And Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in terminal ONE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About terminal ONE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save terminal ONE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.