Home / Browse projects / Thane, Maharashtra / TEN X HABITAT Raymond Realty Tower F

Completed Litigation declared Residential / Group Housing project

TEN X HABITAT Raymond Realty Tower F

By Raymond Realty Limited

RG-MH-57448 · RERA P51700034190 · Last updated on MahaRERA portal: 19 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 11 cases
  • 7 complaints at MahaRERA
  • Completion date moved by 5 months
  • 1 extension taken

Clear

  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 4 completed earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Aug 2026Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
7 of 391Units unsoldnot recorded sold or booked
7Complaints at MahaRERAon this registration
Jump to the 131 documents Report an error

TEN X HABITAT Raymond Realty Tower F is a Residential / Group Housing project by Raymond Realty Limited in Thane, Maharashtra, registered with MahaRERA as P51700034190 on 25 Mar 2022. The registration is recorded completed; possession was promised by 31 Aug 2026. The completion date has moved by 5 months from the original filing. 384 of the 391 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 7 complaints are on record with the regulator.

At a glance

Project

  • NameTEN X HABITAT Raymond Realty Tower F
  • TypeResidential / Group Housing
  • Location
    • Pokhran Road No 1
    • Thane
    • Thane (M Corp.)
    • 400606
  • Pincode400606
  • RERA no.P51700034190
  • ReraGenie IDRG-MH-57448

Builder

  • NameRaymond Realty Limited
  • Entity typeCompany
  • CINU41000MH2019PLC332934
  • GSTIN27AAJCR9076K1ZL
  • Managing DirectorHarmohan Harminder Sahni
  • Other registrations13 more →
  • Completed2 of 14
  • Declared earlier projects31 →

Key dates

this monthRegisteredMar 2022First promiseMar 2026Revised toAug 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Mar 2022
  • Promised completion31 Aug 2026
  • Revised completionRevised to 31 Aug 2026 (originally 31 Mar 2026)
  • Buildings1 building record
  • Documents filed131 files

Current status

98%384 of 391 units booked
100.0%Work done, per cost certificate

Figures as on 19 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower FNA52503910391

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Tower F: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 19 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed802

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots802
Closed/Covered782
Open Space20

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,207 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Sep 2025

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI36552.92
Proposed, not sanctioned36,553 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDhiraj Baug Near Hari Niwas Circle LBS Marg,Thane West Thane -400602
Estimated costRs 245.72 cr
Cost incurredRs 245.72 cr
Work done100.0%
BuildingWingEstimatedIncurred
Tower FNARs 169.78 crRs 169.78 cr
-NARs 75.94 crRs 75.94 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSpaceage Consultants
EngineerEpicons Consultants Pvt Ltd
EngineerVijay Krishnarao Deshpande
Chartered AccountantNiraj Sanghavi Associates
Chartered AccountantWalker Chandiok & Co LLP
PartnerRole in project
Raymond Realty Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA13052620947Mar 2026 → Aug 2026

Reason as filed by the promoterWe have received the Occupation Certificate of the said Project on 25th March, 2026 which is prior to completion date and we have already offered possession to the customers. Further we have updated the copy of the said Occupation Certificate on RERA Portal under Completion update, however it is rejected by the authority stating reasons: “The building details i.e. No of floors, parking, units etc are not updated in the original/ project/Proposal while migrating the Project in 2.0 system. so the same is required to be corrected by promotor by following due process of correction. However up till

Litigation declared11

CaseCourtStatus
10/2015Sub Division Office ThaneFavorably Disposed off
27/2022Maharashtra Revenue Tribunal Mumbai against RLPending for argument
158/2012Bombay High Court against RLPending
13/2016Bombay High Court against RLPending
57/2016High Court Bombay against RLPending
71/2017High Court Bombay against RLPending
997/2019Civil Judge Senior Division Thane against RLFor evidence of plaintiff
34/2020District Court Thane against RLArgument of order dt eleven feb two thousand twenty in sr no seven above
315/2020Civil Judge Senior Division Thane against RLPending for argument on injunction application
583/2021High Court Bombay by RLfor argument
57/2016Bombay High CourtOngoing

Complaints filed with MahaRERA7

Case no.ComplainantRespondentFiled
CC12503772Akhilesh DalviRaymond Realty Limited29/10/2025
CC12600938Raymond Realty LimitedTejas Arvind Shinde20/02/2026
CC12600937Raymond Realty LimitedArchana Vinod Sawant20/02/2026
CC12601659Raymond Realty LimitedNarayan Gangaram Gawandalkar24/03/2026
CC12603151Manjiri mahadeo ShenaviRaymond Realty Limited27/05/2026
CC12604278Gorachand NagRaymond Realty Limited08/07/2026
CC12604232Sundeep Joseph MachadoRaymond Realty Limited06/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 May 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 May 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed131

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 131 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: OC copy.pdf19 Jun 2026
Layout approvalFile: 1 Plan 1 Layout.pdf27 May 2026
Building plan approvalFile: 2 TYPICAL 1 6 8 11 13 16 18 21 23 26 28 31 33 36 38 41 43 46 48 50 FLOOR PLAN.pdf27 May 2026
Building plan approvalFile: 4 TYPICAL 7 12 16 18 21 23 26 28 30 FLOOR PLAN.pdf27 May 2026
Building plan approvalFile: 5 plan 32 37 42 47 FLOOR PLAN.pdf27 May 2026
Building plan approvalFile: 3 Terrace Floor Plan and section.pdf27 May 2026
Withdrawal Update Form 1File: Form 1_Habitat Tower F 3103.pdf23 Apr 2026
Withdrawal Update Form 2File: Form 2_Hbaitat F 3103.pdf23 Apr 2026
Withdrawal Update Form 3File: Form 3_Habitat Tower F 3103.pdf23 Apr 2026
Withdrawal Update Form 1File: Form 1_Habitat Tower F.pdf23 Jan 2026
Withdrawal Update Form 2File: Form 2_Hbaitat F.pdf23 Jan 2026
Withdrawal Update Form 3File: Form 3_Habitat Tower F_.pdf23 Jan 2026
Withdrawal Update Form 1File: Habitat Tower F online.pdf17 Oct 2025
Withdrawal Update Form 2File: Form 2_Habitat F.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3_Habitat Tower F.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: TenX Habitat_Tower F_Statement and Certificate.pdf27 Sep 2025
Form 1File: Form 1_Habitat Tower F.pdf30 Jul 2025
Form 2File: Form 2 Tower F.pdf30 Jul 2025
Form 3File: Form 3 Tower F_.pdf30 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold list.pdf30 Jul 2025
Form 2A (FY 2024-2025)File: TOWER F.pdf17 Jul 2025
Disclosure for secured/unsecured finance availed for the projectFile: Habitat Tower F.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 - Ten X Habitat Tower F - Certificate Number 25 signed.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Tower F.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower F.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: Tower F.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 tower -f_250113_123123.pdf15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 - Ten X Habitat Tower F - Certificate Number 286 signed.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FOrm 2 Tower F 311224.pdf15 Jan 2025
Disclosure of sold/ booked inventoryFile: Tower F.pdf24 Oct 2024
Details of encumbrancesFile: release of loan.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed RERA Form 3 - Ten X ERA Tower F - Certificate Number 193.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower F 270924.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Tower F 270924.pdf10 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Annexure 7- TENX Habitat Tower F.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD TOWER F.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 - Ten X ERA Tower F - Certificate Number 103 signed.pdf17 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf16 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower F 270624.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA - Tower F -300624.pdf9 Jul 2024
Disclosure of sold/ booked inventoryFile: TOWER F.pdf23 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: TOWER F FROM2A.pdf18 Apr 2024
CERSAI detailsFile: CERSAI_Search_Report_200304022849_For_Asset_Based_Search_16_04_2024_19_01_04_374.pdf18 Apr 2024
CERSAI detailsFile: CERSAI_Search_Report_200304022893_For_Asset_Based_Search_16_04_2024_19_01_39_260.pdf18 Apr 2024
CERSAI detailsFile: CERSAI_Search_Report_200304022921_For_Asset_Based_Search_16_04_2024_19_01_54_637.pdf18 Apr 2024
CERSAI detailsFile: CERSAI_Search_Report_200304022949_For_Asset_Based_Search_16_04_2024_19_02_09_692.pdf18 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Habitat TOWER F.pdf15 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower F.pdf8 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-Ten X Habitat Tower F.pdf8 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower F Habitat.pdf8 Apr 2024
Disclosure of sold/ booked inventoryFile: TEN X HABITAT TOWER -F_240123_123710.pdf23 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Tower F.pdf18 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293545181_For_Asset_Based_Search_15_01_2024_16_36_57_974.pdf16 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293545232_For_Asset_Based_Search_15_01_2024_16_37_25_591.pdf16 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293545301_For_Asset_Based_Search_15_01_2024_16_37_54_937.pdf16 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293545808_For_Asset_Based_Search_15_01_2024_16_41_34_319.pdf16 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293546115_For_Asset_Based_Search_15_01_2024_16_43_02_635.pdf16 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293546210_For_Asset_Based_Search_15_01_2024_16_43_30_119.pdf16 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293546306_For_Asset_Based_Search_15_01_2024_16_44_04_734.pdf16 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293546395_For_Asset_Based_Search_15_01_2024_16_44_33_289.pdf16 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ten X Habitat Tower F_240109_174350.pdf12 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: tower f_240112_161905.pdf12 Jan 2024
Disclosure of sold/ booked inventoryFile: TOWER F.pdf31 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower F.pdf31 Oct 2023
CERSAI detailsFile: 1.pdf27 Oct 2023
CERSAI detailsFile: 2.pdf27 Oct 2023
CERSAI detailsFile: 2.pdf27 Oct 2023
CERSAI detailsFile: 3.pdf27 Oct 2023
CERSAI detailsFile: 4.pdf27 Oct 2023
CERSAI detailsFile: 5.pdf27 Oct 2023
CERSAI detailsFile: 6.pdf27 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower F.pdf26 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tower F.pdf26 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: tower f.pdf26 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: TOWER F F.pdf30 Sep 2023
Disclosure of sold/ booked inventoryFile: TOWER F.pdf25 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Tower F Form2A.pdf30 May 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD TOWER F.pdf19 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower F.pdf17 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Tower F.pdf17 Apr 2023

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
INVICTUS BY GSP51700052012Village Panchpakhadi, Thane102Jul 2023OngoingOct 2028Not due yet
TEN X HABITAT Raymond Realty Tower E128B, Pokhran Road , J K Gram, , Thane, Thane, 400606, MAHARASHTRA--CompletedSep 2025Feb 2025
TEN X HABITAT RAYMOND REALTY TOWER DThe Mill Pokhrana Road no 1 JK gram Thane 400606244-CompletedSep 2024Mar 2024
TEN X HABITAT RAYMOND REALTY TOWER CThe Mill Pokhran Road no 1 J K gram Thane 400606244-CompletedMar 2024Mar 2024
TEN X HABITAT RAYMOND REALTY TOWER A and BThe Mill Pokhran Road No 1 JK Gram Thane 400606638-CompletedMar 2024Mar 2024

How this compares with Thane

98%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 5 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep TEN X HABITAT Raymond Realty Tower F on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Thane7,600+ in Thane

Builder: Raymond Realty Limited

Raymond Realty Limited has 14 registrations on MahaRERA, including TEN X HABITAT Raymond Realty Tower F and TEN X HABITAT Raymond Realty Tower G. Its filings disclose 31 earlier MahaRERA projects: declares 23 of 24 past projects completed on time. Litigation is declared on 11 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if TEN X HABITAT Raymond Realty Tower F is delayed beyond 31 Aug 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TEN X HABITAT Raymond Realty Tower F?

The registered promoter entity is Raymond Realty Limited, a company as per the filing. Its CIN U41000MH2019PLC332934 and GSTIN 27AAJCR9076K1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TEN X HABITAT Raymond Realty Tower F?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against TEN X HABITAT Raymond Realty Tower F?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for TEN X HABITAT Raymond Realty Tower F?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TEN X HABITAT Raymond Realty Tower F?

The professionals named in the filing: Architect: Spaceage Consultants; Engineer: Epicons Consultants Pvt Ltd; Engineer: Vijay Krishnarao Deshpande; Chartered Accountant: Niraj Sanghavi Associates; Chartered Accountant: Walker Chandiok & Co LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TEN X HABITAT Raymond Realty Tower F?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TEN X HABITAT Raymond Realty Tower F. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TEN X HABITAT Raymond Realty Tower F to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.