TEN X HABITAT Raymond Realty Tower F
RG-MH-57448 · RERA P51700034190 · Last updated on MahaRERA portal: 19 Jun 2026
Source: official MahaRERA filing
Red flags
- Litigation declared, 11 cases
- 7 complaints at MahaRERA
- Completion date moved by 5 months
- 1 extension taken
Clear
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 4 completed earlier projects delivered on promise
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
TEN X HABITAT Raymond Realty Tower F is a Residential / Group Housing project by Raymond Realty Limited in Thane, Maharashtra, registered with MahaRERA as P51700034190 on 25 Mar 2022. The registration is recorded completed; possession was promised by 31 Aug 2026. The completion date has moved by 5 months from the original filing. 384 of the 391 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 7 complaints are on record with the regulator.
At a glance
Project
- NameTEN X HABITAT Raymond Realty Tower F
- TypeResidential / Group Housing
- Location
- Pokhran Road No 1
- Thane
- Thane (M Corp.)
- 400606
- Pincode400606
- RERA no.P51700034190
- ReraGenie IDRG-MH-57448
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on25 Mar 2022
- Promised completion31 Aug 2026
- Revised completionRevised to 31 Aug 2026 (originally 31 Mar 2026)
- Buildings1 building record
- Documents filed131 files
Current status
Figures as on 19 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower F | NA | 52 | 50 | 391 | 0 | 391 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 19 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
Tower F: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 19 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Parking filed802
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Tower F | NA | Rs 169.78 cr | Rs 169.78 cr |
| - | NA | Rs 75.94 cr | Rs 75.94 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Spaceage Consultants |
| Engineer | Epicons Consultants Pvt Ltd |
| Engineer | Vijay Krishnarao Deshpande |
| Chartered Accountant | Niraj Sanghavi Associates |
| Chartered Accountant | Walker Chandiok & Co LLP |
| Partner | Role in project |
|---|---|
| Raymond Realty Limited | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe have received the Occupation Certificate of the said Project on 25th March, 2026 which is prior to completion date and we have already offered possession to the customers. Further we have updated the copy of the said Occupation Certificate on RERA Portal under Completion update, however it is rejected by the authority stating reasons: “The building details i.e. No of floors, parking, units etc are not updated in the original/ project/Proposal while migrating the Project in 2.0 system. so the same is required to be corrected by promotor by following due process of correction. However up till
Litigation declared11
| Case | Court | Status |
|---|---|---|
| 10/2015 | Sub Division Office Thane | Favorably Disposed off |
| 27/2022 | Maharashtra Revenue Tribunal Mumbai against RL | Pending for argument |
| 158/2012 | Bombay High Court against RL | Pending |
| 13/2016 | Bombay High Court against RL | Pending |
| 57/2016 | High Court Bombay against RL | Pending |
| 71/2017 | High Court Bombay against RL | Pending |
| 997/2019 | Civil Judge Senior Division Thane against RL | For evidence of plaintiff |
| 34/2020 | District Court Thane against RL | Argument of order dt eleven feb two thousand twenty in sr no seven above |
| 315/2020 | Civil Judge Senior Division Thane against RL | Pending for argument on injunction application |
| 583/2021 | High Court Bombay by RL | for argument |
| 57/2016 | Bombay High Court | Ongoing |
Complaints filed with MahaRERA7
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12503772 | Akhilesh Dalvi | Raymond Realty Limited | 29/10/2025 |
| CC12600938 | Raymond Realty Limited | Tejas Arvind Shinde | 20/02/2026 |
| CC12600937 | Raymond Realty Limited | Archana Vinod Sawant | 20/02/2026 |
| CC12601659 | Raymond Realty Limited | Narayan Gangaram Gawandalkar | 24/03/2026 |
| CC12603151 | Manjiri mahadeo Shenavi | Raymond Realty Limited | 27/05/2026 |
| CC12604278 | Gorachand Nag | Raymond Realty Limited | 08/07/2026 |
| CC12604232 | Sundeep Joseph Machado | Raymond Realty Limited | 06/07/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Mar 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 May 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 May 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed131
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 131 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: OC copy.pdf | 19 Jun 2026 |
| Layout approvalFile: 1 Plan 1 Layout.pdf | 27 May 2026 |
| Building plan approvalFile: 2 TYPICAL 1 6 8 11 13 16 18 21 23 26 28 31 33 36 38 41 43 46 48 50 FLOOR PLAN.pdf | 27 May 2026 |
| Building plan approvalFile: 4 TYPICAL 7 12 16 18 21 23 26 28 30 FLOOR PLAN.pdf | 27 May 2026 |
| Building plan approvalFile: 5 plan 32 37 42 47 FLOOR PLAN.pdf | 27 May 2026 |
| Building plan approvalFile: 3 Terrace Floor Plan and section.pdf | 27 May 2026 |
| Withdrawal Update Form 1File: Form 1_Habitat Tower F 3103.pdf | 23 Apr 2026 |
| Withdrawal Update Form 2File: Form 2_Hbaitat F 3103.pdf | 23 Apr 2026 |
| Withdrawal Update Form 3File: Form 3_Habitat Tower F 3103.pdf | 23 Apr 2026 |
| Withdrawal Update Form 1File: Form 1_Habitat Tower F.pdf | 23 Jan 2026 |
| Withdrawal Update Form 2File: Form 2_Hbaitat F.pdf | 23 Jan 2026 |
| Withdrawal Update Form 3File: Form 3_Habitat Tower F_.pdf | 23 Jan 2026 |
| Withdrawal Update Form 1File: Habitat Tower F online.pdf | 17 Oct 2025 |
| Withdrawal Update Form 2File: Form 2_Habitat F.pdf | 17 Oct 2025 |
| Withdrawal Update Form 3File: Form 3_Habitat Tower F.pdf | 17 Oct 2025 |
| Form 5 (FY 2024-2025)File: TenX Habitat_Tower F_Statement and Certificate.pdf | 27 Sep 2025 |
| Form 1File: Form 1_Habitat Tower F.pdf | 30 Jul 2025 |
| Form 2File: Form 2 Tower F.pdf | 30 Jul 2025 |
| Form 3File: Form 3 Tower F_.pdf | 30 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: sold list.pdf | 30 Jul 2025 |
| Form 2A (FY 2024-2025)File: TOWER F.pdf | 17 Jul 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Habitat Tower F.pdf | 24 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 - Ten X Habitat Tower F - Certificate Number 25 signed.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Tower F.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower F.pdf | 17 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Tower F.pdf | 21 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 tower -f_250113_123123.pdf | 15 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 - Ten X Habitat Tower F - Certificate Number 286 signed.pdf | 15 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FOrm 2 Tower F 311224.pdf | 15 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Tower F.pdf | 24 Oct 2024 |
| Details of encumbrancesFile: release of loan.pdf | 16 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed RERA Form 3 - Ten X ERA Tower F - Certificate Number 193.pdf | 16 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower F 270924.pdf | 10 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Tower F 270924.pdf | 10 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Annexure 7- TENX Habitat Tower F.pdf | 7 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD TOWER F.pdf | 18 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 - Ten X ERA Tower F - Certificate Number 103 signed.pdf | 17 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf | 16 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower F 270624.pdf | 15 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA - Tower F -300624.pdf | 9 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: TOWER F.pdf | 23 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: TOWER F FROM2A.pdf | 18 Apr 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200304022849_For_Asset_Based_Search_16_04_2024_19_01_04_374.pdf | 18 Apr 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200304022893_For_Asset_Based_Search_16_04_2024_19_01_39_260.pdf | 18 Apr 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200304022921_For_Asset_Based_Search_16_04_2024_19_01_54_637.pdf | 18 Apr 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200304022949_For_Asset_Based_Search_16_04_2024_19_02_09_692.pdf | 18 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Habitat TOWER F.pdf | 15 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower F.pdf | 8 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-Ten X Habitat Tower F.pdf | 8 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower F Habitat.pdf | 8 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: TEN X HABITAT TOWER -F_240123_123710.pdf | 23 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Tower F.pdf | 18 Jan 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200293545181_For_Asset_Based_Search_15_01_2024_16_36_57_974.pdf | 16 Jan 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200293545232_For_Asset_Based_Search_15_01_2024_16_37_25_591.pdf | 16 Jan 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200293545301_For_Asset_Based_Search_15_01_2024_16_37_54_937.pdf | 16 Jan 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200293545808_For_Asset_Based_Search_15_01_2024_16_41_34_319.pdf | 16 Jan 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200293546115_For_Asset_Based_Search_15_01_2024_16_43_02_635.pdf | 16 Jan 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200293546210_For_Asset_Based_Search_15_01_2024_16_43_30_119.pdf | 16 Jan 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200293546306_For_Asset_Based_Search_15_01_2024_16_44_04_734.pdf | 16 Jan 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200293546395_For_Asset_Based_Search_15_01_2024_16_44_33_289.pdf | 16 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ten X Habitat Tower F_240109_174350.pdf | 12 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: tower f_240112_161905.pdf | 12 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: TOWER F.pdf | 31 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower F.pdf | 31 Oct 2023 |
| CERSAI detailsFile: 1.pdf | 27 Oct 2023 |
| CERSAI detailsFile: 2.pdf | 27 Oct 2023 |
| CERSAI detailsFile: 2.pdf | 27 Oct 2023 |
| CERSAI detailsFile: 3.pdf | 27 Oct 2023 |
| CERSAI detailsFile: 4.pdf | 27 Oct 2023 |
| CERSAI detailsFile: 5.pdf | 27 Oct 2023 |
| CERSAI detailsFile: 6.pdf | 27 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower F.pdf | 26 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tower F.pdf | 26 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: tower f.pdf | 26 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: TOWER F F.pdf | 30 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: TOWER F.pdf | 25 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Tower F Form2A.pdf | 30 May 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD TOWER F.pdf | 19 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower F.pdf | 17 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Tower F.pdf | 17 Apr 2023 |
Promoter's earlier projects5
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| INVICTUS BY GSP51700052012 | Village Panchpakhadi, Thane | 102 | Jul 2023 | Ongoing | Oct 2028 | Not due yet |
| TEN X HABITAT Raymond Realty Tower E | 128B, Pokhran Road , J K Gram, , Thane, Thane, 400606, MAHARASHTRA | - | - | Completed | Sep 2025 | Feb 2025 |
| TEN X HABITAT RAYMOND REALTY TOWER D | The Mill Pokhrana Road no 1 JK gram Thane 400606 | 244 | - | Completed | Sep 2024 | Mar 2024 |
| TEN X HABITAT RAYMOND REALTY TOWER C | The Mill Pokhran Road no 1 J K gram Thane 400606 | 244 | - | Completed | Mar 2024 | Mar 2024 |
| TEN X HABITAT RAYMOND REALTY TOWER A and B | The Mill Pokhran Road No 1 JK Gram Thane 400606 | 638 | - | Completed | Mar 2024 | Mar 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 13 other registrations, which the RERA portal never shows together
- All 131 filed documents as one ZIP, foldered, with a manifest
Keep TEN X HABITAT Raymond Realty Tower F on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Thane7,600+ in Thane
Jai Bhavani Chs Ltd SRA Project
HEER REALTY VENTURES PVT LTD
Glorio Grand Central
Ekdant Constructions and Developers Privat
Veer Hills
Yash Infra
L and T Realty Evara Heights T1
ELANTE PROPERTIES PRIVATE LIMITED
Tenx District 9 Tower B
Raymond Realty Limited
MAHAVIR VISTA AND VISTA POINT
VINAYAK DEVELOPERS
See every Thane project, with the district possession charts
Builder: Raymond Realty Limited
Raymond Realty Limited has 14 registrations on MahaRERA, including TEN X HABITAT Raymond Realty Tower F and TEN X HABITAT Raymond Realty Tower G. Its filings disclose 31 earlier MahaRERA projects: declares 23 of 24 past projects completed on time. Litigation is declared on 11 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if TEN X HABITAT Raymond Realty Tower F is delayed beyond 31 Aug 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of TEN X HABITAT Raymond Realty Tower F?
The registered promoter entity is Raymond Realty Limited, a company as per the filing. Its CIN U41000MH2019PLC332934 and GSTIN 27AAJCR9076K1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in TEN X HABITAT Raymond Realty Tower F?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against TEN X HABITAT Raymond Realty Tower F?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for TEN X HABITAT Raymond Realty Tower F?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at TEN X HABITAT Raymond Realty Tower F?
The professionals named in the filing: Architect: Spaceage Consultants; Engineer: Epicons Consultants Pvt Ltd; Engineer: Vijay Krishnarao Deshpande; Chartered Accountant: Niraj Sanghavi Associates; Chartered Accountant: Walker Chandiok & Co LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in TEN X HABITAT Raymond Realty Tower F?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback