Home / Browse projects / Thane, Maharashtra / TEN X ERA Raymond Realty Tower A

Registered No litigation declared Residential / Group Housing project

TEN X ERA Raymond Realty Tower A

By Raymond Realty Limited

RG-MH-06661 · RERA P51700053528 · Last updated on MahaRERA portal: 26 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 completed earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 13 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Aug 2029Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 94%
26 of 302Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 125 documents Report an error

TEN X ERA Raymond Realty Tower A is a Residential / Group Housing project by Raymond Realty Limited in Thane, Maharashtra, registered with MahaRERA as P51700053528 on 10 Nov 2023. Possession is promised by 31 Aug 2029. 276 of the 302 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameTEN X ERA Raymond Realty Tower A
  • TypeResidential / Group Housing
  • Location
    • Pokhran Road No 1 ( Sector No-IV)
    • J K Gram ( Panchpakhadi)
    • Thane (M Corp.)
    • Thane
    • 400606
  • Pincode400606
  • RERA no.P51700053528
  • ReraGenie IDRG-MH-06661

Builder

  • NameRaymond Realty Limited
  • Entity typeCompany
  • CINU41000MH2019PLC332934
  • GSTIN27AAJCR9076K1ZL
  • Other registrations13 more →
  • Completed2 of 14
  • Declared earlier projects31 →

Key dates

this monthRegisteredNov 2023PromisedAug 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Nov 2023
  • Promised completion31 Aug 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed125 files

Current status

91%276 of 302 units booked
66.5%Work done, per cost certificate

Figures as on 26 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing A -TEN X ERA Raymond Realty Tower ANA43403020302

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 94%.

Wing A -TEN X ERA Raymond Realty Tower A: 56% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure94%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises17%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 26 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed618

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots618
Closed/Covered618

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,092 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Sep 2025

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI28591.64
Proposed, not sanctioned28,592 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchThane
Estimated costRs 211.93 cr
Cost incurredRs 141.04 cr
Work done66.55%
BuildingWingEstimatedIncurred
Wing A -TEN X ERA Raymond Realty Tower ANARs 129.95 crRs 98.13 cr
-NARs 81.98 crRs 42.91 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSpaceage Consultants
EngineerEngineering Creations Consultancy
EngineerVishal Chandrakant Koli
Chartered AccountantNiraj Sanghavi & Associates
Chartered AccountantWalker Chandiok & Co LLP
PartnerRole in project
Raymond Realty Limited-

Litigation declared4

CaseCourtStatus
71/2017Bombay High CourtPending
158/2012Bombay High CourtPending
13/2016Bombay High CourtPending
57/2016Bombay High CourtPending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Nov 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Aug 2029

Documents filed125

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 125 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: TOWER A.pdf26 Jun 2026
Withdrawal Update Form 1File: Form 1_Era Twr A.pdf23 Apr 2026
Withdrawal Update Form 2File: Form 2_Tenx ERA Tower A.pdf23 Apr 2026
Withdrawal Update Form 3File: Form 3_Tenx ERA A.pdf23 Apr 2026
Withdrawal Update Form 1File: Form1_ERA A.pdf21 Jan 2026
Withdrawal Update Form 2File: Form 2_ERA A.pdf21 Jan 2026
Withdrawal Update Form 3File: Form 3 ERA Tower A_C.pdf21 Jan 2026
Withdrawal Update Form 1File: ERA Tower A_Online.pdf17 Oct 2025
Withdrawal Update Form 2File: Form 2_TenX ERA A.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3_TenX ERA A.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: TenX ERA_Tower A_Statement and Certificate.pdf29 Sep 2025
Form 1File: Form 1_TenX ERA Tower A.pdf20 Jul 2025
Form 2File: Form 2 ERA TOWER-A.pdf20 Jul 2025
Form 3File: Form 3_TenX ERA Tower A.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold unsold declaration.pdf20 Jul 2025
Form 2A (FY 2024-2025)File: TOWER A.pdf17 Jul 2025
Form 1File: Form 1 TenX ERA Tower A.pdf1 Jul 2025
Form 2File: Form 2 TenX ERA Tower A.pdf1 Jul 2025
Form 3File: RERA Form 3 - Tower X ERA Tower A - Certificate Number 18 signed.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: ERA TOWER A.pdf1 Jul 2025
Disclosure of sold/ booked inventoryFile: ERA TOWER A.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 - Tower X ERA Tower A - Certificate Number 18 signed.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 TenX ERA Tower A.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 TenX ERA Tower A.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: ERA Tower A.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 RERA - Tower A TenX ERA.pdf15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RERA - Ten X ERA Tower A.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA - Tower A TenX ERA.pdf15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower A.pdf17 Dec 2024
Disclosure of sold/ booked inventoryFile: ERA TOWER A.pdf24 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Tower A.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RERA Tower A.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Tower A.pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Annexure 11,Form 5 ERA ERA Tower A.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD TOWER A ERA.pdf18 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RERA - Tenx ERA Tower A.pdf15 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1 ERA Tower A.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tenx Era_Form 2 _Tower A 3006.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - ERA A.pdf30 May 2024
Disclosure of sold/ booked inventoryFile: ERA TOWER A.pdf23 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 RERA Tenx ERA Tower A.pdf18 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA TenX ERA Tower-A.pdf18 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: JAN FORM2A ERA TOWER A.pdf18 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: TEN XERA TOWER A.pdf18 Apr 2024
CERSAI detailsFile: CERSAI_Search_Report_200304102824_For_Asset_Based_Search_17_04_2024_17_45_57_508.pdf18 Apr 2024
CERSAI detailsFile: CERSAI_Search_Report_200304103304_For_Asset_Based_Search_17_04_2024_17_52_22_269.pdf18 Apr 2024
CERSAI detailsFile: CERSAI_Search_Report_200304103324_For_Asset_Based_Search_17_04_2024_17_52_37_588.pdf18 Apr 2024
CERSAI detailsFile: CERSAI_Search_Report_200304103341_For_Asset_Based_Search_17_04_2024_17_52_52_166.pdf18 Apr 2024
CERSAI detailsFile: CERSAI_Search_Report_200304103376_For_Asset_Based_Search_17_04_2024_17_53_11_518.pdf18 Apr 2024
CERSAI detailsFile: CERSAI_Search_Report_200304104651_For_Asset_Based_Search_17_04_2024_18_10_23_519.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RERA - Ten X ERA Tower A.pdf18 Apr 2024
Disclosure of sold/ booked inventoryFile: TEN X ERA TOWER-A_240123_150233.pdf23 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293535407_For_Asset_Based_Search_15_01_2024_15_34_02_859.pdf16 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293535603_For_Asset_Based_Search_15_01_2024_15_35_27_529.pdf16 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293535745_For_Asset_Based_Search_15_01_2024_15_36_21_215.pdf16 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293535950_For_Asset_Based_Search_15_01_2024_15_37_42_162.pdf16 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293536026_For_Asset_Based_Search_15_01_2024_15_38_11_113.pdf16 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293536085_For_Asset_Based_Search_15_01_2024_15_38_38_291.pdf16 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293536118_For_Asset_Based_Search_15_01_2024_15_38_54_144.pdf16 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293541498_For_Asset_Based_Search_15_01_2024_16_12_10_950.pdf16 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293541568_For_Asset_Based_Search_15_01_2024_16_12_34_370.pdf16 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293542596_For_Asset_Based_Search_15_01_2024_16_19_44_646.pdf16 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293542854_For_Asset_Based_Search_15_01_2024_16_21_42_750.pdf16 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293542945_For_Asset_Based_Search_15_01_2024_16_22_07_146.pdf16 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293543002_For_Asset_Based_Search_15_01_2024_16_22_32_211.pdf16 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293543079_For_Asset_Based_Search_15_01_2024_16_23_04_628.pdf16 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293543079_For_Asset_Based_Search_15_01_2024_16_23_04_628.pdf16 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293543162_For_Asset_Based_Search_15_01_2024_16_23_40_649.pdf16 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293543235_For_Asset_Based_Search_15_01_2024_16_24_12_918.pdf16 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293543298_For_Asset_Based_Search_15_01_2024_16_24_37_351.pdf16 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower A Era.pdf12 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA - Tower A.pdf12 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FOrm 3 Tower A ERA_240112_143635.pdf12 Jan 2024
Declaration about Commencement CertificateFile: CC DECLARATION.pdf8 Nov 2023
Layout approvalFile: layout.pdf6 Nov 2023
Building plan approvalFile: 1 1st Floor Wing A,B,C_compressed.pdf6 Nov 2023
Building plan approvalFile: 1 Basement plan_compressed.pdf6 Nov 2023
Building plan approvalFile: 2 Gr plan_compressed.pdf6 Nov 2023
Building plan approvalFile: 3 1st Podium_compressed.pdf6 Nov 2023

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 under way, not due yet
ProjectLocationFlatsStatusPromisedDelivered
INVICTUS BY GSp5170005201265 132/2, Pokhran Road No 1, Village Panchpakhadi, Thane (M Corp.), Thane, Thane, 400606, MAHARASHTRA-OngoingOct 2028Not due yet
TEN X HABITAT RAYMOND REALTY TOWER GThe Mill Pokharan Road No-01 JK Gram Thane 400006291OngoingJun 2026Jun 2026
TEN X HABITAT RAYMOND REALTY TOWER FThe Mill Pokharan Road No-01 JK Gram Thane 400006399OngoingMar 2026Mar 2026

How this compares with Thane

91%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep TEN X ERA Raymond Realty Tower A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near J K Gram ( Panchpakhadi)7,600+ in Thane

Builder: Raymond Realty Limited

Raymond Realty Limited has 14 registrations on MahaRERA, including TEN X HABITAT Raymond Realty Tower F and TEN X HABITAT Raymond Realty Tower G. Its filings disclose 31 earlier MahaRERA projects: declares 23 of 24 past projects completed on time. Litigation is declared on 11 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if TEN X ERA Raymond Realty Tower A is delayed beyond 31 Aug 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TEN X ERA Raymond Realty Tower A?

The registered promoter entity is Raymond Realty Limited, a company as per the filing. Its CIN U41000MH2019PLC332934 and GSTIN 27AAJCR9076K1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TEN X ERA Raymond Realty Tower A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for TEN X ERA Raymond Realty Tower A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TEN X ERA Raymond Realty Tower A?

The professionals named in the filing: Architect: Spaceage Consultants; Engineer: Engineering Creations Consultancy; Engineer: Vishal Chandrakant Koli; Chartered Accountant: Niraj Sanghavi & Associates; Chartered Accountant: Walker Chandiok & Co LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TEN X ERA Raymond Realty Tower A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TEN X ERA Raymond Realty Tower A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TEN X ERA Raymond Realty Tower A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.