Home / Browse projects / Solapur, Maharashtra / Tembhurni Prime City Mall - Wing A - Smart Office - Phase A2
Tembhurni Prime City Mall - Wing A - Smart Office - Phase A2
By Dhariwal And Chhoriya Buildcon Pvt Ltd
RG-MH-97382 · RERA P52600018004 · Last updated on MahaRERA portal: 30 Dec 2022
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 34 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Tembhurni Prime City Mall - Wing A - Smart Office - Phase A2 is a Commercial project by Dhariwal And Chhoriya Buildcon Pvt Ltd in Solapur, Maharashtra, registered with MahaRERA as P52600018004 on 3 Oct 2018. Possession was promised by 30 Dec 2023 and is now 34 months past that date.
At a glance
Project
- NameTembhurni Prime City Mall - Wing A - Smart Office - Phase A2
- TypeCommercial
- Location
- Akluj To Tembhurni State highway
- Tembhurni
- Madha
- Solapur
- 413211
- Pincode413211
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52600018004
- ReraGenie IDRG-MH-97382
Builder
- NameDhariwal And Chhoriya Buildcon Pvt Ltd
- Entity typeCompany
- Managing DirectorAnmol Kanhaiyalal Chhoriya
- Other registrations11 more →
- Completed11 of 12
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on3 Oct 2018
- Promised completion30 Dec 2023
- Revised completionNone
- Buildings1 building record
- Documents filed45 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Prime City mall - Smart Office | NA | 1 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Dec 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 10%.
Prime City mall - Smart Office: 2% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 10% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 30 Dec 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed40
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SUBHA ARCHITECTS |
| Engineer | SPECTRUM CONSULTANTS |
| Partner | Role in project |
|---|---|
| Dhariwal And Chhoriya Buildcon Pvt Ltd | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jul 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Sep 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Jul 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Jul 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed45
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Er tembhurni a2 site.pdf | 30 Dec 2022 |
| Certificates of CA (Form 3)File: CA tembhurni A2_11zon.pdf | 30 Dec 2022 |
| Disclosure of sold/ booked inventoryFile: Tembhurni A2.pdf | 28 Dec 2022 |
| Certificates of CA (Form 3)File: CA TembhuniA2_11zon.pdf | 28 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Er tembhurni a2.pdf | 27 Sep 2022 |
| Disclosure of sold/ booked inventoryFile: Tembhurni A2.pdf | 27 Sep 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Er tembhurni a2_11zon.pdf | 23 Sep 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A2_page-0001.pdf | 7 Jul 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certi Tembhurni prime city Mall A wing smart office phase A2.pdf | 7 Jul 2022 |
| Certificates of CA (Form 3)File: CA certi Tembhurni prime city Mall wing A smart office phase A2.pdf | 7 Jul 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tembhurni A2 er certificate_compressed.pdf | 13 May 2022 |
| CERSAI detailsFile: CERSAI TEMBHURNI PRIME CITY MALL PH-2.pdf | 13 May 2022 |
| Certificates of CA (Form 3)File: FORM 3 CA TEMBHURNI PRIME CITY PHASE 2_compressed.pdf | 30 Dec 2021 |
| Declaration about Commencement CertificateFile: DECLARATION TEMBHURNI PROME CITY MALL WING A PHASE A2.pdf | 30 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 TEMBURNI PRIME CITY PHASE A2 2018.pdf | 27 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 TEMBURNI PRIME CITY 2019.pdf | 27 Oct 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certi prime city mall A2 Wing Up to - June 19.pdf | 20 Jan 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Up To Sep - 19.pdf | 20 Jan 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certi prime city mall A2 Wing Up to - June 19.pdf | 20 Jan 2020 |
| Engineers Certificate on Quality Assurance (Form 2A)File: Quality Assurance June - 19.pdf | 20 Jan 2020 |
| Certificates of CA (Form 3)File: CA Certi prime city mall A2 Wing Up to - June 19.pdf | 20 Jan 2020 |
| Certificates of CA (Form 3)File: CA Certificate Up To Sep - 19.pdf | 20 Jan 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archi Certi prime city mall A2 wing Up to March - 18.pdf | 12 Aug 2019 |
| Engineers Certificate on Quality Assurance (Form 2A)File: Quality Assurance Certi prime city mall A2 wing Up to March - 18.pdf | 12 Aug 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certi prime city mall A2 wing Up to March - 18.pdf | 6 Jul 2019 |
| Certificates of CA (Form 3)File: Ca Certi prime city mall A2 wing Up to March - 18.pdf | 6 Jul 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate prime mall Ph - A2 up to Dec - 18.pdf | 20 Jun 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archi Certificate prime mall Ph - A2 up to Dec - 18.pdf | 19 Jun 2019 |
| Certificates of CA (Form 3)File: Ca Certificate prime mall Ph - A2 up to Dec - 18.pdf | 19 Jun 2019 |
| Layout approvalFile: Phase Wise Sanctioned Layout Plan - Phase - A2 Prime Mall.pdf | 20 Sep 2018 |
| Copy of Layout Approval (in case of layout)File: Phase Wise Sanctioned Layout Plan - Phase - A2 Prime Mall.pdf | 20 Sep 2018 |
| Declaration in FORM BFile: Declerartion Form - B - Prime Mall Phase - A2 Completion Date - 2022.pdf | 18 Sep 2018 |
| Certificates of CA (Form 3)File: CA Crtificate Prime mall A2.pdf | 13 Aug 2018 |
| Layout approvalFile: Revised Sanction - 196 Prime City Mall With Smart Office - 1.pdf | 30 Jul 2018 |
| Building plan approvalFile: Revised Sanction - 196 Prime City Mall With Smart Office - 4.pdf | 30 Jul 2018 |
| Building plan approvalFile: Revised Sanction - 196 Prime City Mall With Smart Office - 5.pdf | 30 Jul 2018 |
| PAN CardFile: D And C Pvt Ltd Pan Card.pdf | 30 Jul 2018 |
| Copy of the legal title reportFile: Tembhrni commercial Search Report.pdf | 30 Jul 2018 |
| Details of encumbrancesFile: Tembhurni Comm Bldg Encumbrances certificate 1.pdf | 30 Jul 2018 |
| Copy of Layout Approval (in case of layout)File: Revised Sanction - 196 Prime City Mall With Smart Office - 1.pdf | 30 Jul 2018 |
| Building Plan Approval (IOD)File: Revised Sanction - 196 Prime City Mall With Smart Office - 4.pdf | 30 Jul 2018 |
| Building Plan Approval (IOD)File: Revised Sanction - 196 Prime City Mall With Smart Office - 5.pdf | 30 Jul 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Revised Commencement Certificate - 196 Prime City Mall With Smart Office.pdf | 30 Jul 2018 |
| Proforma of Allotment letterFile: Allotment Tembhurni Commercial Draft-WING A.pdf | 30 Jul 2018 |
| Proforma of Allotment letterFile: ATS Draft-WING A2 New.pdf | 30 Jul 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Solapur
Computed across the 550+ Solapur projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 11 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 45 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Tembhurni Prime City Mall - Wing A - Smart O on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Tembhurni550+ in Solapur
Filed coordinates, straight-line distance. 5 registered projects within 2 km.
R M Dhariwal Township Tembhurni Plotting
Dhariwal And Chhoriya Buildcon Pvt Ltd
SURYAMALA-B PHASE I
SUVASTU PROPERTIES
AMARS WONDERLAND
M/s PRAGATI REALTY
Tembhurni Prime City Mall - Wing - A - GF And
Dhariwal And Chhoriya Buildcon Pvt Ltd
Tembhurni Prime City Mall - Wing - B - GF And
Dhariwal And Chhoriya Buildcon Pvt Ltd
Tembhurni Prime Park
Dhariwal And Chhoriya Buildcon Pvt Ltd
See every Solapur project, with the district possession charts
Builder: Dhariwal And Chhoriya Buildcon Pvt Ltd
Dhariwal And Chhoriya Buildcon Pvt Ltd has 12 registrations on MahaRERA, including R M Dhariwal Township Tuljapur Plotting and R M Dhariwal Township Wardha Plotting. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Solapur district page.
Frequently asked questions
What does it mean that Tembhurni Prime City Mall - Wing A - Smart Office - Phase A2 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Tembhurni Prime City Mall - Wing A - Smart Office - Phase A2 is delayed beyond 30 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Tembhurni Prime City Mall - Wing A - Smart Office - Phase A2?
The registered promoter entity is Dhariwal And Chhoriya Buildcon Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Tembhurni Prime City Mall - Wing A - Smart Office - Phase A2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Tembhurni Prime City Mall - Wing A - Smart Office - Phase A2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Tembhurni Prime City Mall - Wing A - Smart Office - Phase A2?
The professionals named in the filing: Architect: SUBHA ARCHITECTS; Engineer: SPECTRUM CONSULTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Tembhurni Prime City Mall - Wing A - Smart Office - Phase A2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback