Home / Browse projects / Solapur, Maharashtra / SURYAMALA-B PHASE I
SURYAMALA-B PHASE I
RG-MH-20632 · RERA P52600009648 · Last updated on MahaRERA portal: 8 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 120 months
- 3 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SURYAMALA-B PHASE I is a Residential / Group Housing project by SUVASTU PROPERTIES in Solapur, Maharashtra, registered with MahaRERA as P52600009648 on 22 Aug 2017. Possession is promised by 24 Jul 2029. The completion date has moved by 120 months from the original filing. 17 of the 56 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.
At a glance
Project
- NameSURYAMALA-B PHASE I
- TypeResidential / Group Housing
- Location
- Tembhurni
- Madha
- Solapur
- 413211
- Pincode413211
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52600009648
- ReraGenie IDRG-MH-20632
Builder
- NameSUVASTU PROPERTIES
- Entity typePartnership
- PartnersBHALCHANDRA SURYAJI MANE, SAURABH BHALCHANDRA MANE
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on22 Aug 2017
- Promised completion24 Jul 2029
- Revised completionRevised to 24 Jul 2029 (originally 25 Jul 2019)
- Buildings1 building record
- Documents filed161 files
Current status
Figures as on 8 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| B | NA | 8 | 7 | 56 | 0 | 56 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 8 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 60%.
B: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 60% |
Progress on shared amenities15
As on 8 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 60% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 80% |
| Landscaping & Tree Planting | Yes | 80% |
| Street Lighting | Yes | 40% |
| Community Buildings | Yes | 90% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 80% |
| Solid Waste Management And Disposal | Yes | 80% |
| Water conservation /Rain water harvesting | Yes | 10% |
| Energy managemcnt | Yes | 50% |
| Fire protection and fire safety requirements | Yes | 90% |
| Electrical meter room, sub-station, receiving station | Yes | 60% |
| Aggregate area of recreational Open Space | Yes | 90% |
| Open Parking | Yes | 0% |
Parking filed94
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| B | NA | Rs 5.60 cr | Rs 4.00 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Anand Koppa |
| Engineer | Ankit Benkar |
| Engineer | Navjyot Navnath Pandhare |
| Chartered Accountant | Nitin Kudale |
| Chartered Accountant | Vrinda Gonte |
| Chartered Accountant | K P Joshi and Associates |
| Partner | Role in project |
|---|---|
| SUVASTU PROPERTIES | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterlabour problem and circumstances in the rural area and recession & lockdown also are the major reason.
Reason as filed by the promoterThe Reasons for the delay/Extension are as follow: The extension is majorly due to significant Material shortages, which severely have impacted the construction timeline, delaying important stages of project. Hence, additional time is required to address the delays and complete the project work, requesting you to grant us the same.
Reason as filed by the promoterThe extension is majorly as we are facing financial constraints due to low cash flow, as the flats have not yet been sold. This has further impacted our ability to progress as planned. As a result, additional time is necessary to address the delays and complete the required tasks. Hence, additional time is required to address the delays, requesting you to grant us the same
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Feb 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 20 Jan 2024
Documents filed161
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 161 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2023-2024)File: Form 2A FY 23-24.pdf | 8 Jun 2026 |
| Form 5 (FY 2023-2024)File: Form 5 FY 23-24.pdf | 8 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 Q4 2025 2026.pdf | 30 May 2026 |
| Withdrawal Update Form 2File: Form 2 Q4 2025 2026.pdf | 30 May 2026 |
| Withdrawal Update Form 3File: Form 3 Q4 2025-2026.pdf | 30 May 2026 |
| Form 1File: form 1 Q4 (1).pdf | 20 Mar 2026 |
| Form 2File: form 2 Q4 2024 2025.pdf | 20 Mar 2026 |
| Form 3File: form 3 Q4 2024 2025.pdf | 20 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Book Inventory.pdf | 20 Mar 2026 |
| Withdrawal Update Form 1File: form 1 Q1 2025 2026.pdf | 18 Mar 2026 |
| Withdrawal Update Form 1File: form 1 Q2 2025 2026.pdf | 18 Mar 2026 |
| Withdrawal Update Form 1File: form 1 Q3 2025 2026.pdf | 18 Mar 2026 |
| Withdrawal Update Form 2File: form 2 Q1 2025 2026.pdf | 18 Mar 2026 |
| Withdrawal Update Form 2File: form 2 Q2 2025 2026.pdf | 18 Mar 2026 |
| Withdrawal Update Form 2File: form 3 Q3 2025 2026.pdf | 18 Mar 2026 |
| Withdrawal Update Form 3File: form 3 Q1 2025 2026.pdf | 18 Mar 2026 |
| Withdrawal Update Form 3File: form 2 Q2 2025 2026.pdf | 18 Mar 2026 |
| Withdrawal Update Form 3File: form 3 Q3 2025 2026.pdf | 18 Mar 2026 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A.pdf | 2 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: From no 5.pdf | 2 Apr 2025 |
| Declaration in FORM BFile: Form B notarized_c.pdf | 4 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q3 2024-2025.pdf | 18 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q2 2024-2025.pdf | 18 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q1 2024-2025.pdf | 18 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4 2023-2024 (1) (1).pdf | 18 Feb 2025 |
| Declaration in FORM BFile: Form B notarized.pdf | 11 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4 Jan - Mar (2017-2018).pdf | 11 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q3 Oct-Dec (2023-2024).pdf | 11 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q2 Jul-Sep (2023-2024).pdf | 11 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q1 Apr-Jun (2023-2024).pdf | 11 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4 Jan-Mar (2022-2023).pdf | 11 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q2 Jul-Sep (2022-2023).pdf | 11 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q1 Apr-Jun (2022-2023).pdf | 11 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4 Jan-Mar (2021-2022).pdf | 11 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q3 Apr-Dec (2021-2022).pdf | 11 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4 Jan-Mar (2020-2021).pdf | 11 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4 Jan-Mar (2019-2020).pdf | 11 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4 Jan-Mar (2018-2019).pdf | 11 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q3 Oct-Dec (2022-2023).pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: 2 SUVASTU RERA Q4 2018 2019.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: 3 SUVASTU RERA Q4 2019 2020.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: 4 SUVASTU RERA Q4 2020 2021.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: 5 SUVASTU RERA Q3 2021 2022.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: 6 SUVASTU RERA Q4 2021 2022.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: 7 SUVASTU RERA Q1 2022 2023.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: 8 SUVASTU RERA Q2 2022 2023.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: 9 SUVASTU RERA Q3 2022 2023.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: 10 SUVASTU RERA Q4 2022 2023.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: 11 SUVASTU RERA Q1 2023 2024.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: 12 SUVASTU RERA Q2 2023 2024.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: 13 SUVASTU RERA Q3 2023 2024.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: 14 SUVASTU RERA Q4 2023 2024.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: 15 SUVASTU RERA Q1 2024 2025.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: 16 SUVASTU RERA Q2 2024 2025.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: 17 SUVASTU RERA Q3 2024 25.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: 17 SUVASTU RERA Q3 2024 25.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: 1 SUVASTU RERA Q4 2017-2018.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: 1 SUVASTU RERA Q4 2017-2018.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: 2 SUVASTU RERA Q4 2018 2019.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: 3 SUVASTU RERA Q4 2019 2020.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: 5 SUVASTU RERA Q3 2021 2022.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: 6 SUVASTU RERA Q4 2021 2022.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: 7 SUVASTU RERA Q1 2022 2023.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: 8 SUVASTU RERA Q2 2022 2023.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: 10 SUVASTU RERA Q4 2022 2023.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: 11 SUVASTU RERA Q1 2023 2024.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: 12 SUVASTU RERA Q2 2023 2024.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: 13 SUVASTU RERA Q3 2023 2024.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: 14 SUVASTU RERA Q4 2023 2024.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: 15 SUVASTU RERA Q1 2024 2025.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: 16 SUVASTU RERA Q2 2024 2025.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: 9 SUVASTU RERA Q3 2022 2023.pdf | 11 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q3 2022 2023.pdf | 11 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q4 2022 2023.pdf | 11 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q1 2023 2024.pdf | 11 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q2 2023 2024.pdf | 11 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q3 2023 2024.pdf | 11 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q4 2023 2024.pdf | 11 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q1 2024 2025.pdf | 11 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2020.pdf | 11 Feb 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Solapur
Computed across the 550+ Solapur projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 161 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SURYAMALA-B PHASE I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Tembhurni550+ in Solapur
Filed coordinates, straight-line distance. 4 registered projects within 2 km.
R M Dhariwal Township Tembhurni Plotting
Dhariwal And Chhoriya Buildcon Pvt Ltd
AMARS WONDERLAND
M/s PRAGATI REALTY
Tembhurni Prime City Mall - Wing - A - GF And
Dhariwal And Chhoriya Buildcon Pvt Ltd
Tembhurni Prime City Mall - Wing - B - GF And
Dhariwal And Chhoriya Buildcon Pvt Ltd
Tembhurni Prime City Mall - Wing A - Smart Off
Dhariwal And Chhoriya Buildcon Pvt Ltd
Tembhurni Prime Park
Dhariwal And Chhoriya Buildcon Pvt Ltd
See every Solapur project, with the district possession charts
Builder: SUVASTU PROPERTIES
SUVASTU PROPERTIES has 1 registration on MahaRERA, including SURYAMALA-B PHASE I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Solapur district page.
Frequently asked questions
What are my rights if SURYAMALA-B PHASE I is delayed beyond 24 Jul 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SURYAMALA-B PHASE I?
The registered promoter entity is SUVASTU PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SURYAMALA-B PHASE I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SURYAMALA-B PHASE I?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SURYAMALA-B PHASE I?
The professionals named in the filing: Architect: Anand Koppa; Engineer: Ankit Benkar; Engineer: Navjyot Navnath Pandhare; Chartered Accountant: Nitin Kudale; Chartered Accountant: Vrinda Gonte; Chartered Accountant: K P Joshi and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SURYAMALA-B PHASE I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback