ReraGenieLog inGet a buyer report

Home / Browse projects / Solapur, Maharashtra / SURYAMALA-B PHASE I

Registered No litigation declared Residential / Group Housing project

SURYAMALA-B PHASE I

By SUVASTU PROPERTIES

RG-MH-20632 · RERA P52600009648 · Last updated on MahaRERA portal: 8 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 120 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.
Jul 2029Possession promisedmoved 120 months from the original
6 of 11Construction stages donefurthest along: Internal walls, 60%
39 of 56Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 161 documents Report an error

SURYAMALA-B PHASE I is a Residential / Group Housing project by SUVASTU PROPERTIES in Solapur, Maharashtra, registered with MahaRERA as P52600009648 on 22 Aug 2017. Possession is promised by 24 Jul 2029. The completion date has moved by 120 months from the original filing. 17 of the 56 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameSURYAMALA-B PHASE I
  • TypeResidential / Group Housing
  • Location
    • Tembhurni
    • Madha
    • Solapur
    • 413211
  • Pincode413211
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52600009648
  • ReraGenie IDRG-MH-20632

Builder

  • NameSUVASTU PROPERTIES
  • Entity typePartnership
  • PartnersBHALCHANDRA SURYAJI MANE, SAURABH BHALCHANDRA MANE

Key dates

this monthRegisteredAug 2017First promiseJul 2019Revised toJul 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Aug 2017
  • Promised completion24 Jul 2029
  • Revised completionRevised to 24 Jul 2029 (originally 25 Jul 2019)
  • Buildings1 building record
  • Documents filed161 files

Current status

30%17 of 56 units booked
71.5%Work done, per cost certificate

Figures as on 8 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BNA8756056

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 60%.

B: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%

Progress on shared amenities15

As on 8 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes60%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes80%
Street LightingYes40%
Community BuildingsYes90%
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes80%
Water conservation /Rain water harvestingYes10%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceYes90%
Open ParkingYes0%

Parking filed94

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots94
Closed/Covered94

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,000 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on13 Mar 2026

Approvals and building plan

Sanctioning authorityAssistant Director Of Town Planning, Solapur
Permissible FSI6014.96
Proposed, not sanctioned6,015 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMAHAVIR PATH AKLUJ TAL MALSHIRAS DIST SOLAPUR
Estimated costRs 5.60 cr
Cost incurredRs 4.00 cr
Work done71.46%
BuildingWingEstimatedIncurred
BNARs 5.60 crRs 4.00 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnand Koppa
EngineerAnkit Benkar
EngineerNavjyot Navnath Pandhare
Chartered AccountantNitin Kudale
Chartered AccountantVrinda Gonte
Chartered AccountantK P Joshi and Associates
PartnerRole in project
SUVASTU PROPERTIES-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52600006149Jul 2019 → Jul 2022

Reason as filed by the promoterlabour problem and circumstances in the rural area and recession & lockdown also are the major reason.

EXT52600013739Jul 2019 → Jul 2026

Reason as filed by the promoterThe Reasons for the delay/Extension are as follow: The extension is majorly due to significant Material shortages, which severely have impacted the construction timeline, delaying important stages of project. Hence, additional time is required to address the delays and complete the project work, requesting you to grant us the same.

EA15062621368Jul 2019 → Jul 2029

Reason as filed by the promoterThe extension is majorly as we are facing financial constraints due to low cash flow, as the flats have not yet been sold. This has further impacted our ability to progress as planned. As a result, additional time is necessary to address the delays and complete the required tasks. Hence, additional time is required to address the delays, requesting you to grant us the same

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 Jan 2024

Documents filed161

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 161 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2023-2024)File: Form 2A FY 23-24.pdf8 Jun 2026
Form 5 (FY 2023-2024)File: Form 5 FY 23-24.pdf8 Jun 2026
Withdrawal Update Form 1File: Form 1 Q4 2025 2026.pdf30 May 2026
Withdrawal Update Form 2File: Form 2 Q4 2025 2026.pdf30 May 2026
Withdrawal Update Form 3File: Form 3 Q4 2025-2026.pdf30 May 2026
Form 1File: form 1 Q4 (1).pdf20 Mar 2026
Form 2File: form 2 Q4 2024 2025.pdf20 Mar 2026
Form 3File: form 3 Q4 2024 2025.pdf20 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Book Inventory.pdf20 Mar 2026
Withdrawal Update Form 1File: form 1 Q1 2025 2026.pdf18 Mar 2026
Withdrawal Update Form 1File: form 1 Q2 2025 2026.pdf18 Mar 2026
Withdrawal Update Form 1File: form 1 Q3 2025 2026.pdf18 Mar 2026
Withdrawal Update Form 2File: form 2 Q1 2025 2026.pdf18 Mar 2026
Withdrawal Update Form 2File: form 2 Q2 2025 2026.pdf18 Mar 2026
Withdrawal Update Form 2File: form 3 Q3 2025 2026.pdf18 Mar 2026
Withdrawal Update Form 3File: form 3 Q1 2025 2026.pdf18 Mar 2026
Withdrawal Update Form 3File: form 2 Q2 2025 2026.pdf18 Mar 2026
Withdrawal Update Form 3File: form 3 Q3 2025 2026.pdf18 Mar 2026
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A.pdf2 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: From no 5.pdf2 Apr 2025
Declaration in FORM BFile: Form B notarized_c.pdf4 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q3 2024-2025.pdf18 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q2 2024-2025.pdf18 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q1 2024-2025.pdf18 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4 2023-2024 (1) (1).pdf18 Feb 2025
Declaration in FORM BFile: Form B notarized.pdf11 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4 Jan - Mar (2017-2018).pdf11 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q3 Oct-Dec (2023-2024).pdf11 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q2 Jul-Sep (2023-2024).pdf11 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q1 Apr-Jun (2023-2024).pdf11 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4 Jan-Mar (2022-2023).pdf11 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q2 Jul-Sep (2022-2023).pdf11 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q1 Apr-Jun (2022-2023).pdf11 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4 Jan-Mar (2021-2022).pdf11 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q3 Apr-Dec (2021-2022).pdf11 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4 Jan-Mar (2020-2021).pdf11 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4 Jan-Mar (2019-2020).pdf11 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4 Jan-Mar (2018-2019).pdf11 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q3 Oct-Dec (2022-2023).pdf11 Feb 2025
Certificates of CA (Form 3)File: 2 SUVASTU RERA Q4 2018 2019.pdf11 Feb 2025
Certificates of CA (Form 3)File: 3 SUVASTU RERA Q4 2019 2020.pdf11 Feb 2025
Certificates of CA (Form 3)File: 4 SUVASTU RERA Q4 2020 2021.pdf11 Feb 2025
Certificates of CA (Form 3)File: 5 SUVASTU RERA Q3 2021 2022.pdf11 Feb 2025
Certificates of CA (Form 3)File: 6 SUVASTU RERA Q4 2021 2022.pdf11 Feb 2025
Certificates of CA (Form 3)File: 7 SUVASTU RERA Q1 2022 2023.pdf11 Feb 2025
Certificates of CA (Form 3)File: 8 SUVASTU RERA Q2 2022 2023.pdf11 Feb 2025
Certificates of CA (Form 3)File: 9 SUVASTU RERA Q3 2022 2023.pdf11 Feb 2025
Certificates of CA (Form 3)File: 10 SUVASTU RERA Q4 2022 2023.pdf11 Feb 2025
Certificates of CA (Form 3)File: 11 SUVASTU RERA Q1 2023 2024.pdf11 Feb 2025
Certificates of CA (Form 3)File: 12 SUVASTU RERA Q2 2023 2024.pdf11 Feb 2025
Certificates of CA (Form 3)File: 13 SUVASTU RERA Q3 2023 2024.pdf11 Feb 2025
Certificates of CA (Form 3)File: 14 SUVASTU RERA Q4 2023 2024.pdf11 Feb 2025
Certificates of CA (Form 3)File: 15 SUVASTU RERA Q1 2024 2025.pdf11 Feb 2025
Certificates of CA (Form 3)File: 16 SUVASTU RERA Q2 2024 2025.pdf11 Feb 2025
Certificates of CA (Form 3)File: 17 SUVASTU RERA Q3 2024 25.pdf11 Feb 2025
Certificates of CA (Form 3)File: 17 SUVASTU RERA Q3 2024 25.pdf11 Feb 2025
Certificates of CA (Form 3)File: 1 SUVASTU RERA Q4 2017-2018.pdf11 Feb 2025
Certificates of CA (Form 3)File: 1 SUVASTU RERA Q4 2017-2018.pdf11 Feb 2025
Certificates of CA (Form 3)File: 2 SUVASTU RERA Q4 2018 2019.pdf11 Feb 2025
Certificates of CA (Form 3)File: 3 SUVASTU RERA Q4 2019 2020.pdf11 Feb 2025
Certificates of CA (Form 3)File: 5 SUVASTU RERA Q3 2021 2022.pdf11 Feb 2025
Certificates of CA (Form 3)File: 6 SUVASTU RERA Q4 2021 2022.pdf11 Feb 2025
Certificates of CA (Form 3)File: 7 SUVASTU RERA Q1 2022 2023.pdf11 Feb 2025
Certificates of CA (Form 3)File: 8 SUVASTU RERA Q2 2022 2023.pdf11 Feb 2025
Certificates of CA (Form 3)File: 10 SUVASTU RERA Q4 2022 2023.pdf11 Feb 2025
Certificates of CA (Form 3)File: 11 SUVASTU RERA Q1 2023 2024.pdf11 Feb 2025
Certificates of CA (Form 3)File: 12 SUVASTU RERA Q2 2023 2024.pdf11 Feb 2025
Certificates of CA (Form 3)File: 13 SUVASTU RERA Q3 2023 2024.pdf11 Feb 2025
Certificates of CA (Form 3)File: 14 SUVASTU RERA Q4 2023 2024.pdf11 Feb 2025
Certificates of CA (Form 3)File: 15 SUVASTU RERA Q1 2024 2025.pdf11 Feb 2025
Certificates of CA (Form 3)File: 16 SUVASTU RERA Q2 2024 2025.pdf11 Feb 2025
Certificates of CA (Form 3)File: 9 SUVASTU RERA Q3 2022 2023.pdf11 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q3 2022 2023.pdf11 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q4 2022 2023.pdf11 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q1 2023 2024.pdf11 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q2 2023 2024.pdf11 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q3 2023 2024.pdf11 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q4 2023 2024.pdf11 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q1 2024 2025.pdf11 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2020.pdf11 Feb 2025

How this compares with Solapur

30%of this project is bookeddistrict median 15%
15%of Solapur projects moved their completion datethis one moved by 120 months
39%of Solapur registrations have lapsed or been cancelledthis one is on the register

Computed across the 550+ Solapur projects on ReraGenie, from their own filings.

Keep SURYAMALA-B PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Tembhurni550+ in Solapur

2 kmSURYAMALA-B PHASE ICompleted 3Lapsed / revoked 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 4 registered projects within 2 km.

Builder: SUVASTU PROPERTIES

SUVASTU PROPERTIES has 1 registration on MahaRERA, including SURYAMALA-B PHASE I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Solapur district page.

Frequently asked questions

What are my rights if SURYAMALA-B PHASE I is delayed beyond 24 Jul 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SURYAMALA-B PHASE I?

The registered promoter entity is SUVASTU PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SURYAMALA-B PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SURYAMALA-B PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SURYAMALA-B PHASE I?

The professionals named in the filing: Architect: Anand Koppa; Engineer: Ankit Benkar; Engineer: Navjyot Navnath Pandhare; Chartered Accountant: Nitin Kudale; Chartered Accountant: Vrinda Gonte; Chartered Accountant: K P Joshi and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SURYAMALA-B PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SURYAMALA-B PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SURYAMALA-B PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.