TEJELEVIA BUILDING D & TEJONE BANER
RG-MH-68141 · RERA PM1262022501416 · Last updated on MahaRERA portal: 24 Sep 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 2 cases
- Completion date moved by 4 months
- 1 extension taken
- Allotment letter deviates from the model form
Clear
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
TEJELEVIA BUILDING D & TEJONE BANER is a Mixed project by TEJRAJ REALTORS LLP in Pune, Maharashtra, registered with MahaRERA as PM1262022501416 on 10 Nov 2025. Possession is promised by 24 Jan 2030. The completion date has moved by 4 months from the original filing. 41 of the 158 units on this registration are recorded sold or booked, and 3 of 20 construction stages are filed complete.
At a glance
Project
- NameTEJELEVIA BUILDING D & TEJONE BANER
- TypeMixed
- Location
- PAN CARD Club Road
- Baner
- Baner
- Haveli
- Pune
- 411045
- Pincode411045
- MapView location on Google Maps (as filed on RERA)
- RERA no.PM1262022501416
- ReraGenie IDRG-MH-68141
Builder
- NameTEJRAJ REALTORS LLP
- Entity typePartnership
- GSTIN27AAUFM7114K1ZQ
- PartnersTEJRAJ GANPATRAO PATIL, MEERA PATIL, Tejraj Promoter & Builders Private Limited
- Other registrations2 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on10 Nov 2025
- Promised completion24 Jan 2030
- Revised completionRevised to 24 Jan 2030 (originally 24 Sep 2029)
- Buildings2 building records
- Documents filed44 files
Current status
Figures as on 24 Sep 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| COMMERCIAL E WING | NA | 12 | 9 | 0 | 42 | 42 |
| RESIDENTIAL BUILDING D | NA | 37 | 29 | 116 | 0 | 116 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 24 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 20 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 96%.
COMMERCIAL E WING0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
RESIDENTIAL BUILDING D40%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 96% |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 24 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | 0% |
| Water Supply | No | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | 20% |
| Storm Water Drains | No | 0% |
| Landscaping & Tree Planting | No | 0% |
| Street Lighting | No | 0% |
| Community Buildings | No | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | 0% |
| Solid Waste Management And Disposal | No | 0% |
| Water conservation /Rain water harvesting | No | 0% |
| Energy managemcnt | No | 0% |
| Fire protection and fire safety requirements | No | 0% |
| Electrical meter room, sub-station, receiving station | No | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed253
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Podiums / Upper Parking Floor | Total |
|---|---|---|
| COMMERCIAL E WING | 165 | 165 |
| RESIDENTIAL BUILDING D | 88 | 88 |
Land and ownership9
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| NITIN MARUTI KALAMKAR | Baner | Pune |
| GULAB MARUTRAO DHANKUDE | - | Pune |
| Sau Shaila Maruti Kalamkar | Baner | Pune |
| Sau Monali Pramod Raskar | Baner | Pune |
| Sau Urmila Suresh Gore | Baner | Pune |
| Sau Surekha Mahesh Abhang | Baner | Pune |
| Sau Shilpa Nitin Kalamkar | Baner | Pune |
| Shri Shreyas Nitin Kalamkar | Baner | Pune |
| Shri Shriyansh Nitin Kalamkar | Baner | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| RESIDENTIAL BUILDING D | NA | Rs 49.33 cr | Rs 9.07 cr |
| - | NA | Rs 15.02 cr | Rs 3.54 cr |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Deepali S Agarwal |
| Engineer | SURESH FULARI |
| Engineer | Yuvraj Kamble |
| Engineer | Rajendra Bhasme |
| Chartered Accountant | DRP & CO LLP |
| Chartered Accountant | P B SHAH |
| Chartered Accountant | Ritesh Chandrakant Gujar |
| Chartered Accountant | V.S. Potdar & Co |
| Partner | Role in project |
|---|---|
| TEJRAJ REALTORS LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterNA
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 1159/2019 | CJSD Pune | Ongoing |
| 1576/2018 | CJSD | Ongoing |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportNot on the file
A lawyer's report on who owns the land and what is registered against it.
- Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Oct 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Oct 2025 - Commencement CertificateNot on the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
- Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 24 Jan 2030
Documents filed44
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM1-TEJELEVIA D TEJONE BANER_001.pdf | 24 Sep 2026 |
| Withdrawal Update Form 1File: FORM1 TEJELEVIA BUILDING D.pdf | 24 Sep 2026 |
| Withdrawal Update Form 1File: FORM1 TEJELEVIA BUILDING D.pdf | 24 Sep 2026 |
| Withdrawal Update Form 2File: Tej Elevia D E RERA Form 02 Q1 FY 2026-27.pdf | 24 Sep 2026 |
| Withdrawal Update Form 2File: FORM 2 D BLDG.pdf | 24 Sep 2026 |
| Withdrawal Update Form 2File: FORM 2 D BLDG.pdf | 24 Sep 2026 |
| Withdrawal Update Form 3File: Form 3 - D_compressed.pdf | 24 Sep 2026 |
| Withdrawal Update Form 3File: Form 3 - D_compressed.pdf | 24 Sep 2026 |
| Withdrawal Update Form 3File: FORM 3 D Rev.pdf | 24 Sep 2026 |
| Form 2A (FY 2025-2026)File: Tej Elevia Tower D E Form-2A...pdf | 28 Jul 2026 |
| Withdrawal Update Form 1File: FORM1-TEJELEVIA D TEJONE BANER_001.pdf | 18 Jul 2026 |
| Withdrawal Update Form 2File: Tej Elevia D E RERA Form 02 Q1 FY 2026-27.pdf | 18 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 Tejone Baner With Sign_0001_compressed (1).pdf | 18 Jul 2026 |
| Withdrawal Update Form 1File: Form-1 Tej Elevia_D E.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Form-2 Tej Elevia Tower D TejOne Baner_.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Form 3_Elevia D_compressed.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Dec 25.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Dec 25.pdf | 20 Jan 2026 |
| Layout approvalFile: Layout Plan_1.pdf | 27 Oct 2025 |
| Building plan approvalFile: Building Plan_1.pdf | 27 Oct 2025 |
| Building plan approvalFile: Building Plan_2.pdf | 27 Oct 2025 |
| Building plan approvalFile: Building Plan_3.pdf | 27 Oct 2025 |
| Building plan approvalFile: Building Plan_4.pdf | 27 Oct 2025 |
| Building plan approvalFile: Building Plan_5.pdf | 27 Oct 2025 |
| Building plan approvalFile: Building Plan_6.pdf | 27 Oct 2025 |
| Building plan approvalFile: Building Plan_7.pdf | 27 Oct 2025 |
| Building plan approvalFile: Building Plan_8.pdf | 27 Oct 2025 |
| Building plan approvalFile: Building Plan_9.pdf | 27 Oct 2025 |
| Building plan approvalFile: Building Plan_10.pdf | 27 Oct 2025 |
| Building plan approvalFile: Building Plan_11.pdf | 27 Oct 2025 |
| Building plan approvalFile: Building Plan_12.pdf | 27 Oct 2025 |
| Building plan approvalFile: Building Plan_13.pdf | 27 Oct 2025 |
| Building plan approvalFile: Building Plan_14.pdf | 27 Oct 2025 |
| Building plan approvalFile: Building Plan_15.pdf | 27 Oct 2025 |
| Building plan approvalFile: Building Plan_16.pdf | 27 Oct 2025 |
| Building plan approvalFile: Building Plan_17.pdf | 27 Oct 2025 |
| Building plan approvalFile: Building Plan_18.pdf | 27 Oct 2025 |
| Layout approvalFile: Layout Plan_1.pdf | 27 Oct 2025 |
| Layout approvalFile: Layout Plan_2.pdf | 27 Oct 2025 |
| Layout approvalFile: Layout Plan_3.pdf | 27 Oct 2025 |
| Layout approvalFile: Layout Plan_4.pdf | 27 Oct 2025 |
| Layout approvalFile: Layout Plan_5.pdf | 27 Oct 2025 |
| Declaration and undertaking (Annexure A)File: Annexure A- Declaration cum undertaking as per Order 50.pdf | 16 Oct 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 44 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep TEJELEVIA BUILDING D & TEJONE BANER on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Baner13,700+ in Pune
Filed coordinates, straight-line distance. 386 registered projects within 2 km.
EARTH 1 BY VTP LUXE PHASE 1
MAHALUNGE REAL ESTATE DEVELOPERS PVT. LTD.
Godrej Meadows
Mahalunge Township Developers Private Limi
Godrej Green Vistas
Mahalunge Township Developers Private Limi
Godrej Hill Retreat
Mahalunge Township Developers Private Limi
Godrej Green Cove
Mahalunge Township Developers Private Limi
NYATI EMERALD I
NYATI BUILDERS PRIVATE LIMITED
Builder: TEJRAJ REALTORS LLP
TEJRAJ REALTORS LLP has 3 registrations on MahaRERA, including TEJELEVIA BUILDING - A,B and TEJELEVIA BUILDING C. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if TEJELEVIA BUILDING D & TEJONE BANER is delayed beyond 24 Jan 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of TEJELEVIA BUILDING D & TEJONE BANER?
The registered promoter entity is TEJRAJ REALTORS LLP, a partnership as per the filing. Its GSTIN 27AAUFM7114K1ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in TEJELEVIA BUILDING D & TEJONE BANER?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for TEJELEVIA BUILDING D & TEJONE BANER?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at TEJELEVIA BUILDING D & TEJONE BANER?
The professionals named in the filing: Architect: Deepali S Agarwal; Engineer: SURESH FULARI; Engineer: Yuvraj Kamble; Engineer: Rajendra Bhasme; Chartered Accountant: DRP & CO LLP; Chartered Accountant: P B SHAH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in TEJELEVIA BUILDING D & TEJONE BANER?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback