Red flags

  • Litigation declared, 2 cases
  • Rs 50.00 crore secured on the land, in favour of ADITYA BIRLA FINANCE LTD
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 82%
8 of 116Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 133 documents Report an error

TEJELEVIA BUILDING C is a Residential / Group Housing project by TEJRAJ REALTORS LLP in Pune, Maharashtra, registered with MahaRERA as P52100050379 on 5 Apr 2023. Possession is promised by 24 Dec 2028. 108 of the 116 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameTEJELEVIA BUILDING C
  • TypeResidential / Group Housing
  • Location
    • Baner
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411045
  • Pincode411045
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100050379
  • ReraGenie IDRG-MH-95789

Builder

  • NameTEJRAJ REALTORS LLP
  • Entity typePartnership
  • GSTIN27AAUFM7114K1ZQ
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnerTEJRAJ GANPATRAO PATIL
  • Other registrations2 more →

Key dates

this monthRegisteredApr 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Apr 2023
  • Promised completion24 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed133 files

Current status

93%108 of 116 units booked
73.7%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TEJELEVIA BUILDING CNA35321160116

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 82%.

TEJELEVIA BUILDING C: 51% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure82%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed53

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots53
Closed/Covered53

Land and ownership2

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,561 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared present
Charge in favour ofADITYA BIRLA FINANCE LTD
Secured amountRs 50.00 crore
Declared on3 Jun 2026
LandownerVillageDistrict
MARUTI LAXMAN KALAMKARPune (M Corp.)Pune
GULAB DHANKUDEPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI15068.0
Proposed, not sanctioned10,803 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPUNE
Estimated costRs 56.69 cr
Cost incurredRs 41.79 cr
Work done73.72%
BuildingWingEstimatedIncurred
TEJELEVIA BUILDING CNARs 46.94 crRs 36.23 cr
-NARs 9.75 crRs 5.56 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDeepali S Agarwal
EngineerSuresh Fulari
EngineerYuvraj Kamble
EngineerGanesh Pillay
Chartered AccountantRitesh Chandrakant Gujar
Chartered AccountantDRP & CO LLP
Chartered AccountantV.S. Potdar & Co
Chartered AccountantP B Shah
PartnerRole in project
TEJRAJ REALTORS LLP-

Litigation declared2

CaseCourtStatus
1159/2019CJSD PuneOn hearing
6935/2019HC of Judicature at BombayRestrained order against opponent

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 24 Dec 2028

Documents filed133

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 133 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1 Tej Elevia C (1).pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 Elevia C bld.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 Tej Elevia C_compressed.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1 C Dec 25.pdf21 Jan 2026
Withdrawal Update Form 2File: Tej Elevia Bldg C - Form 2 Dec 25.pdf21 Jan 2026
Withdrawal Update Form 3File: Tej Elevia Bldg C - Form 3 Dec 25.pdf21 Jan 2026
Withdrawal Update Form 1File: Form 1 C Dec 25.pdf20 Jan 2026
Withdrawal Update Form 2File: Tej Elevia Bldg C - Form 2 Dec 25.pdf20 Jan 2026
Withdrawal Update Form 3File: Tej Elevia Bldg C - Form 3 Dec 25.pdf20 Jan 2026
Form 5 (FY 2023-2024)File: Form 5_Tej Elevia_C WING_2023-24.pdf14 Nov 2025
Form 5 (FY 2024-2025)File: Form 5_Tej Elevia C_2024-25.pdf14 Nov 2025
Form 2A (FY 2023-2024)File: Form 2A_Tej Elevia Building C_2023-24.pdf5 Nov 2025
Form 2A (FY 2024-2025)File: Form 2A Tej Elevia C Building_2024-25.pdf5 Nov 2025
Withdrawal Update Form 1File: Form 1_Tej Elevia Building C_Sept 25.pdf22 Oct 2025
Withdrawal Update Form 2File: Form 2_Tej Elevia Building C_Sept 25.pdf22 Oct 2025
Withdrawal Update Form 3File: Form 3_TejElevia C_Sept 25.pdf22 Oct 2025
Withdrawal Update Form 1File: Form 1_TejElevia C_June 25.pdf21 Jul 2025
Withdrawal Update Form 2File: Form 2_Tej Elevia C_June 25.PDF21 Jul 2025
Withdrawal Update Form 3File: Form 3_TRLLP C Building_June 25.pdf21 Jul 2025
Form 1File: Form 1_Tej Elevia C_March 25.pdf18 Jul 2025
Form 2File: Form 2_Tej Elevia C_Mrach 2025.pdf18 Jul 2025
Form 3File: Form 3_Tej Elevia C_March 25.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold_Elevia C_March 25.pdf18 Jul 2025
Form 1File: Form 1_Tej Elevia_C_Dec 24.pdf18 Jul 2025
Form 2File: Form 2_Tej Elevia C_Dec 24.pdf18 Jul 2025
Form 3File: Form 3_TejElevia C_Dec 24.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold and Unsold_Tejelevia C_Dec 24.pdf18 Jul 2025
Form 1File: Form 1-Tej Elevia C_ Sept 24.pdf18 Jul 2025
Form 2File: Form 2 -Tej elevia C_Sept 24.pdf18 Jul 2025
Form 3File: Form 3- CA certificate_Sept 2024.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold and Unsold_Tej Elevia C_Sept 2024.pdf18 Jul 2025
Form 1File: Form 1_Tej Elevia C_June 24.pdf18 Jul 2025
Form 2File: Form 2_Tej Elevia C_June 24.pdf18 Jul 2025
Form 3File: Form 3 _Tej Elevia C_ June 24.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold and Unsold_Tej Elevia C_June 24.pdf18 Jul 2025
Form 1File: Form 1_Tej Elevia C_ March 24.pdf18 Jul 2025
Form 2File: Form 2_Tej Elevia C_March 24.pdf18 Jul 2025
Form 3File: Form 3_Tej Elevia C_March 24.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold and Unsold_Tej Elevia C_March 24.pdf18 Jul 2025
Form 1File: Form 1_Tej Elevia C_Dec 23.pdf18 Jul 2025
Form 2File: Form 2_Tej Elevia C_ Dec 23.pdf18 Jul 2025
Form 3File: Form 3 _Tej Elevia C_Dec 23.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold_Tej Elevia C_Dec 23.pdf18 Jul 2025
Form 1File: Form 1_Tej Elevia C Bldg - Sept 23.pdf18 Jul 2025
Form 2File: Form 2_Tej Elevia C Bldg - Sept 23.pdf18 Jul 2025
Form 3File: Form 3_Tej Elevia C Bldg_Sept 23.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold_Tej Elevia C_Sept 23.pdf18 Jul 2025
Form 1File: Form 1 - TEJ ELEVIA C - June 23.pdf18 Jul 2025
Form 2File: Form 2 - Tej Elevia C- June 23.pdf18 Jul 2025
Form 3File: Form 3 Tej Elevia C Building_June23_signed.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold_Tej Elevia C_June 23.pdf18 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Tej Elevia C_March 25.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Tej Elevia C_March 25.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold_Elevia C_March 25.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-Tej Elevia_C.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_TejElevia C_Dec 24.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Tej Elevia C_Dec 24.pdf17 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold and Unsold_Tejelevia C_Dec 24.pdf17 Jan 2025
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate_Tejelevia C.pdf14 Dec 2024
Details of encumbrances concerned to LegalFile: Encumbrance Certificate_Tejelevia C.pdf14 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- CA certificate_Sept 2024_TELBC_compressed.pdf2 Dec 2024
Disclosure of sold/ booked inventoryFile: Tej Elevia C Sold and Unsold_Sept 2024.pdf2 Dec 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate_Tejelevia C.pdf30 Nov 2024
Details of encumbrances concerned to LegalFile: Encumbrance Certificate_Tejelevia C.pdf30 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tej Elevia C_ Sept 24.pdf13 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 tej elevia building C_Sept 24.pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf21 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_Tej Elevia C WING_2023-24_compressed.pdf21 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf4 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Mar 24 C.pdf29 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - June 23.pdf28 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sept 23.pdf28 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Dec 23.pdf28 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf28 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 23.pdf28 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sept 23.pdf28 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Dec 23.pdf28 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf28 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sold Unsold Dec 23.pdf28 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold June 23.pdf28 Jun 2024

How this compares with Pune

93%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep TEJELEVIA BUILDING C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Baner13,700+ in Pune

2 kmTEJELEVIA BUILDING CCompleted 160Lapsed / revoked 60Other 165Dot size: filed unitsN

Filed coordinates, straight-line distance. 385 registered projects within 2 km.

Builder: TEJRAJ REALTORS LLP

TEJRAJ REALTORS LLP has 3 registrations on MahaRERA, including TEJELEVIA BUILDING - A,B and TEJELEVIA BUILDING C. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if TEJELEVIA BUILDING C is delayed beyond 24 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TEJELEVIA BUILDING C?

The registered promoter entity is TEJRAJ REALTORS LLP, a partnership as per the filing. Its GSTIN 27AAUFM7114K1ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TEJELEVIA BUILDING C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for TEJELEVIA BUILDING C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TEJELEVIA BUILDING C?

The professionals named in the filing: Architect: Deepali S Agarwal; Engineer: Suresh Fulari; Engineer: Yuvraj Kamble; Engineer: Ganesh Pillay; Chartered Accountant: Ritesh Chandrakant Gujar; Chartered Accountant: DRP & CO LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TEJELEVIA BUILDING C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TEJELEVIA BUILDING C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TEJELEVIA BUILDING C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.