Registered No litigation declared Commercial project

TEJ ONE MODEL COLONY

By SUMMIT PROPERTY VENTURES LLP

RG-MH-19203 · RERA P52100078271 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Stilt Floor, 70%
10 of 10Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

TEJ ONE MODEL COLONY is a Commercial project by SUMMIT PROPERTY VENTURES LLP in Pune, Maharashtra, registered with MahaRERA as P52100078271 on 4 Dec 2024. Possession is promised by 24 Dec 2027. 0 of the 10 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameTEJ ONE MODEL COLONY
  • TypeCommercial
  • Location
    • PLOT NO 422(P) CTS 1072 B BHAMBURDA SHIVAJI NAGAR PUNE
    • BHAMBURDA SHIVAJI NAGAR PUNE
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411016
  • Pincode411016
  • RERA no.P52100078271
  • ReraGenie IDRG-MH-19203

Builder

  • NameSUMMIT PROPERTY VENTURES LLP
  • Entity typeOthers
  • PartnersTEJRAJ GANPATRAO PATIL Patil, VIJAYKUMAR JANARDAN MUNDHE MUNDHE, ABHIJEET VASANT SHENDE SHENDE, YOGESH RAMESH SHENDE SHENDE, NILESH VASANT SHENDE SHENDE, SWAPNEEL SHASHIKANT SHENDE SHENDE
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredDec 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Dec 2024
  • Promised completion24 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed75 files

Current status

0%0 of 10 units booked
22.6%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TEJ ONE MODEL COLONYNA7401010

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 70%.

TEJ ONE MODEL COLONY: 25% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor70%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed27

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots27
Closed/Covered27

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area923 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Oct 2025

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI8423.0
Proposed, not sanctioned2,159 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Tain Square, Near Reliance Mart, Fatima Nagar, Pune, Maharashtra.411040
Estimated costRs 17.22 cr
Cost incurredRs 3.88 cr
Work done22.55%
BuildingWingEstimatedIncurred
TEJ ONE MODEL COLONYNARs 14.76 crRs 3.41 cr
-NARs 2.46 crRs 47.49 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA Design Studio
ArchitectCmetrica Designers LLP
EngineerSuresh Fulari
EngineerYuvraj Kamble
Chartered AccountantDRP & Co LLP Chartered Accountants
Chartered AccountantRitesh Chandrakant Gujar
Chartered AccountantV.S. POTDAR & CO.
PartnerRole in project
SUMMIT PROPERTY VENTURES LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 24 Dec 2027

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1 Tej One_Model Colony_Form_01 (1).pdf20 Apr 2026
Withdrawal Update Form 2File: Form-2 TejOne Model Colony_RERA Form 02_.pdf20 Apr 2026
Withdrawal Update Form 3File: Form3 Tej one Model Colony_compressed.pdf20 Apr 2026
Withdrawal Update Form 1File: Tej One_Model Colony_RERA Form_01.pdf17 Jan 2026
Withdrawal Update Form 2File: Tej One Model Colony Form 2.pdf17 Jan 2026
Withdrawal Update Form 3File: Tej One Model Colony-Form 3-Dec-25.pdf17 Jan 2026
Form 2A (FY 2024-2025)File: FORM -2A TEJ ONE MC_2024-25.pdf1 Dec 2025
Withdrawal Update Form 1File: Form 1_Tej One Model Colony_Sept 25.pdf17 Oct 2025
Withdrawal Update Form 2File: Form 2_Tej One Model Colony_Sept 25.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3_Tej One Model Colony_Sept 25.pdf17 Oct 2025
Withdrawal Update Form 1File: Form 1_Tej One Model Colony_June 25.pdf16 Oct 2025
Withdrawal Update Form 2File: FORM -2 TEJ ONE MC_June 25.pdf16 Oct 2025
Withdrawal Update Form 3File: Form 3_June 25_Tej One Model Colony.pdf16 Oct 2025
Form 1File: Form 1_Tej One Model Colony_Dec 24.pdf15 Oct 2025
Form 2File: Form 2_Tej One Model Colony_Dec 24.pdf15 Oct 2025
Form 3File: Form 3_Tejonemodelcolony_Dec 2024.pdf15 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold and Unsold_Dec 2024.pdf15 Oct 2025
Form 1File: Form 1_Tej One Model Colony_March 25.pdf15 Oct 2025
Form 2File: Form 2_Tej One Model Colony_March 25.pdf15 Oct 2025
Form 3File: Form 3_March 25_Tejonemodelcolony_Compressed.pdf15 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold_Tej One MC_March 25.pdf15 Oct 2025
Withdrawal Update Form 1File: Form 1_Tej One Model Colony_June 25.pdf15 Oct 2025
Withdrawal Update Form 2File: FORM -2 TEJ ONE MC_June 25.pdf15 Oct 2025
Withdrawal Update Form 3File: Form 3_June 25_Tej One Model Colony.pdf15 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Tej One Model Colony_March 25.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_CA Cert_Tej One Model Colony_March 25.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Tej One Model Colony_March 25.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold_Tej One Model Colony_March 25.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1_Tej One Model Colony_Dec 24.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_TejOneModelColony_Dec 2024.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_TejOneModelcolony_Dec 2024.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Tejonemodelcolony_Dec 2024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Tej One Model Colony_Dec 24.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold and Unsold_TejOneModelColony_Dec 2024.pdf20 Jan 2025
Other - TechnicalFile: Declaration_ tejonemodelcolony.pdf29 Nov 2024
Proforma of Agreement for saleFile: AFS_29-11-24.pdf29 Nov 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report_Tej One Model colony_28-11-24.pdf28 Nov 2024
Other - TechnicalFile: CC Validation.pdf21 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Abhijeet Shende.pdf18 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Nilesh Shende.pdf18 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Swapnil Shende.pdf18 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Tejraj Patil.pdf18 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Vijaykumar munde.pdf18 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Yogesh Shende.pdf18 Nov 2024
Other - TechnicalFile: Declaration_Cum_Undertaking_Tejone Model Colony.pdf13 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B- Bank declaration as per order 56_Tejonemodelcolony.pdf13 Nov 2024
Copy of the legal title reportFile: Revised Search report_Tejone Model Colony.pdf9 Nov 2024
Building plan approvalFile: Building Plan_Tejone_Model_Colony.pdf7 Nov 2024
Layout approvalFile: Layout_Tejone_Model_Colony.pdf7 Nov 2024
Copy of Layout Approval (in case of layout)File: Layout_Tejone_Model_Colony.pdf7 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_Tejone_Model_Colony.pdf7 Nov 2024
Details of encumbrances concerned to FinanceFile: Revised No Encumbrance Finance.pdf4 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: 1_scan114_compressed.pdf4 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: 2_scan113_compressed.pdf4 Nov 2024
Details of encumbrances concerned to LegalFile: Revised No Encumbrance Finance.pdf4 Nov 2024
Declaration in FORM BFile: Revised Form B- Affidavit.pdf26 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Cert -Tej one model colony.pdf26 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA certificate_0001_compressed.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer certificate.pdf26 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Tej One_model colony_CC.pdf26 Oct 2024
Declaration about Commencement CertificateFile: Format D- Commencement Declaration-Tej One Model Colony.pdf26 Oct 2024
CERSAI detailsFile: Revised Cersai declaration.pdf26 Oct 2024
Other - LegalFile: SALE DEED- SUMEET PROPERTY-73-92_5_11zon.pdf16 Oct 2024
Other - LegalFile: SALE DEED- SUMEET PROPERTY-1-23_2_11zon.pdf16 Oct 2024
Other - LegalFile: SALE DEED- SUMEET PROPERTY-24-47_3_11zon.pdf16 Oct 2024
Other - LegalFile: SALE DEED- SUMEET PROPERTY-48-72_4_11zon.pdf16 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - Bank declaration as per order 56_Revised.pdf16 Oct 2024
Copy of the legal title reportFile: Search Title Report 28 12 23 compressed.pdf13 Aug 2024
Copy of the legal title reportFile: Title Search 2018_compressed.pdf13 Aug 2024
Details of encumbrances concerned to FinanceFile: No Legal encumbrances_0001.pdf13 Aug 2024
Proforma of Allotment letterFile: Allotment Letter - Tej one model colony_11-07-24.pdf13 Aug 2024
Deviation Report with respect to Allotment letterFile: Allotment - Deviation_0001.pdf13 Aug 2024
Details of encumbrances concerned to LegalFile: No Legal encumbrances_0001.pdf13 Aug 2024
Disclosure for secured/unsecured finance availed for the projectFile: Secured unsecured letter as per order 56_0001.pdf13 Aug 2024
PAN CardFile: PAN CARD.pdf15 Apr 2024

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep TEJ ONE MODEL COLONY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHAMBURDA SHIVAJI NAGAR PUNE13,700+ in Pune

Builder: SUMMIT PROPERTY VENTURES LLP

Summit Property Ventures LLP has 2 registrations on MahaRERA, including Signature Tower II and TEJ ONE MODEL COLONY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if TEJ ONE MODEL COLONY is delayed beyond 24 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TEJ ONE MODEL COLONY?

The registered promoter entity is SUMMIT PROPERTY VENTURES LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TEJ ONE MODEL COLONY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for TEJ ONE MODEL COLONY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TEJ ONE MODEL COLONY?

The professionals named in the filing: Architect: A Design Studio; Architect: Cmetrica Designers LLP; Engineer: Suresh Fulari; Engineer: Yuvraj Kamble; Chartered Accountant: DRP & Co LLP Chartered Accountants; Chartered Accountant: Ritesh Chandrakant Gujar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TEJ ONE MODEL COLONY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TEJ ONE MODEL COLONY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TEJ ONE MODEL COLONY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.