TECHOPS PARK
RG-MH-03605 · RERA P50500029328 · Last updated on MahaRERA portal: 20 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 21 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
TECHOPS PARK is a Plotted project by SUNRISE DREAMLAND PVT LTD in Nagpur, Maharashtra, registered with MahaRERA as P50500029328 on 18 May 2021. Possession is promised by 31 Dec 2027. The completion date has moved by 21 months from the original filing. 293 of the 341 units on this registration are recorded sold or booked.
At a glance
Project
- NameTECHOPS PARK
- TypePlotted
- Location
- UMRED ROAD
- KALAMNA
- Kalamana
- Nagpur (Rural)
- Nagpur
- 441204
- Pincode441204
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500029328
- ReraGenie IDRG-MH-03605
Builder
- NameSUNRISE DREAMLAND PVT LTD
- Entity typeCompany
- DirectorsVILAS MAHADEORAO HARDE, ANIL MADHUKARRAO KALE, RAJENDRA VISHWESHWARRAO NAKADE, JEEVAN GULABRAO GHIME, NARENDRA TEJRAMJI DAKHALE
- DirectorISHAN BARAI
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on18 May 2021
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 1 Mar 2026)
- BuildingsNot stated in filing
- Documents filed195 files
Current status
Figures as on 20 Aug 2026, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 20 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 35% |
| Water Supply | Yes | 15% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 60% |
| Storm Water Drains | Yes | 65% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 55% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 10.50 cr | Rs 6.90 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | C D GIRIPUNJE |
| Architect | AVINASH HAJARE |
| Engineer | AVINASH HAJARE |
| Chartered Accountant | SUMIT AGRAWAL |
| Chartered Accountant | AS DIVECHA & ASSOCIATES |
| Chartered Accountant | SN DIVECHA & ASSOCIATES |
| Partner | Role in project |
|---|---|
| SUNRISE DREAMLAND PVT LTD | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterTo The Maharashtra Real Estate Regulatory Authority (MahaRERA) Subject: Explanation for Delay and Request for Extension under Section 7(3) Respected Sir/Madam, We would like to submit this explanation regarding the delay in completion of our project registered under MahaRERA, which is due to expire on 1st March 2026. The delay has occurred solely due to unforeseen natural calamities that were entirely beyond our control, and we therefore request an extension under Section 7(3) of the Real Estate (Regulation and Development) Act, 2016. The city of Nagpur, where our project is located, experienc
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 May 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Apr 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Mar 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Mar 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed195
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 195 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: arc june 26.pdf | 20 Aug 2026 |
| Withdrawal Update Form 2File: eng june 26.pdf | 20 Aug 2026 |
| Withdrawal Update Form 3File: FORM 3 june 26.pdf | 20 Aug 2026 |
| Form 2A (FY 2025-2026)File: FORM 2A SIGNED MAR 26.pdf | 4 Jun 2026 |
| Withdrawal Update Form 1File: Architect cer mar 26.pdf | 3 Jun 2026 |
| Withdrawal Update Form 2File: ENGINEER CER MAR 26.pdf | 3 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 3 Jun 2026 |
| Layout approvalFile: TECHOPS PARK LAYOUT MAP WITH HIGHLIGHT AND SIGNATURES OF NMRDA_compressed.pdf | 8 Apr 2026 |
| Withdrawal Update Form 1File: Architect cer dec 25.pdf | 29 Jan 2026 |
| Withdrawal Update Form 2File: ENG CER DEC 25.pdf | 29 Jan 2026 |
| Withdrawal Update Form 3File: CA CERTIFICATE DEC25.pdf | 29 Jan 2026 |
| Form 2A (FY 2022-2023)File: mar 23.pdf | 1 Dec 2025 |
| Form 2A (FY 2021-2022)File: mar 22.pdf | 1 Dec 2025 |
| Form 2A (FY 2023-2024)File: mar 24.pdf | 1 Dec 2025 |
| Form 1File: june 24 arch cert techops park.pdf | 29 Nov 2025 |
| Form 2File: ENGINEERS CERTIFICATE JUN-24.pdf | 29 Nov 2025 |
| Form 3File: CA CERTIFICATE JUN-24.pdf | 29 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold jun 24.pdf | 29 Nov 2025 |
| Form 1File: sep 24 arh cer techops park.pdf | 29 Nov 2025 |
| Form 2File: ENGINEERS CERTIFICATE SEP-24.pdf | 29 Nov 2025 |
| Form 3File: CA CERTIFICATE SEPT-24.pdf | 29 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold sep 24.pdf | 29 Nov 2025 |
| Form 1File: dec 24 arc cer techops park.pdf | 29 Nov 2025 |
| Form 2File: ENGINEERS CERTIFICATE DEC-24.pdf | 29 Nov 2025 |
| Form 3File: CA CERTIFICATE DEC-24.pdf | 29 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: rera sold unsold dec 24.pdf | 29 Nov 2025 |
| Form 2A (FY 2024-2025)File: 2A TECHOPS PARK MAR 25.pdf | 29 Nov 2025 |
| Form 1File: ARCHITECT’S CER june 21.pdf | 28 Nov 2025 |
| Form 2File: engg certificate 30 jun 21.pdf | 28 Nov 2025 |
| Form 3File: c a certificate 30 jun 21.pdf | 28 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: booked 30 jun 2021 final.pdf | 28 Nov 2025 |
| Form 1File: ARCHITECT’S CERTIFICATE sep 21.pdf | 28 Nov 2025 |
| Form 2File: engi certificate 30 sep 21.pdf | 28 Nov 2025 |
| Form 3File: c a certificate 30 sep 21.pdf | 28 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: booked 30 sep 2021.pdf | 28 Nov 2025 |
| Form 1File: ARCHITECT’S CER Dec 21.pdf | 28 Nov 2025 |
| Form 2File: engi certificate 31 dec 21.pdf | 28 Nov 2025 |
| Form 3File: c a certificate 31 dec 21.pdf | 28 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: booked 30 dec 2021_compressed.pdf | 28 Nov 2025 |
| Form 1File: ARCHITECT’S CERTIFICATE Mar 22.pdf | 28 Nov 2025 |
| Form 2File: engi certificate 31 mar 22.pdf | 28 Nov 2025 |
| Form 3File: c a certificate 31 mar 22.pdf | 28 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: srd d of sold 31 MAR 22.pdf | 28 Nov 2025 |
| Form 1File: ARCHITECT’S CERTIFICATE June 22.pdf | 28 Nov 2025 |
| Form 2File: booked 30 june 2022_compressed.pdf | 28 Nov 2025 |
| Form 3File: c a certificate 30 jun 22.pdf | 28 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: c a certificate 30 jun 22.pdf | 28 Nov 2025 |
| Form 1File: ARCHITECT’S CERTIFICATE Sep 22.pdf | 28 Nov 2025 |
| Form 2File: engi certificate 30 sep 22.pdf | 28 Nov 2025 |
| Form 3File: c a certificate 30 sep 22.pdf | 28 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: booked 30 sep 2022_compressed.pdf | 28 Nov 2025 |
| Form 1File: ARCHITECT’S CERTIFICATE Sep 22.pdf | 28 Nov 2025 |
| Form 2File: engi certificate 30 sep 22.pdf | 28 Nov 2025 |
| Form 3File: c a certificate 30 sep 22.pdf | 28 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: booked 30 sep 2022_compressed.pdf | 28 Nov 2025 |
| Form 1File: ARCHITECT’S CERTIFICATE Mar 23.pdf | 28 Nov 2025 |
| Form 2File: engi certificate 31 mar 23.pdf | 28 Nov 2025 |
| Form 3File: c a certificate 31 mar 23.pdf | 28 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: booked 31 march 2023_compressed.pdf | 28 Nov 2025 |
| Form 1File: june 23 arch cer.pdf | 28 Nov 2025 |
| Form 2File: Engineer Certificate June 2023_compressed (1).pdf | 28 Nov 2025 |
| Form 3File: CA CERT JUNE 23.pdf | 28 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold june 23.pdf | 28 Nov 2025 |
| Form 1File: sept 23 architect cer.pdf | 28 Nov 2025 |
| Form 2File: Engineer Certificate September 2023_compressed.pdf | 28 Nov 2025 |
| Form 3File: CA CERT SEPT 23.pdf | 28 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold sep 23.pdf | 28 Nov 2025 |
| Form 1File: dec 23 architect cer.pdf | 28 Nov 2025 |
| Form 2File: Engineer Certificate December 2023_compressed.pdf | 28 Nov 2025 |
| Form 3File: CA CERTIFICATE DEC 23.pdf | 28 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold dec 23.pdf | 28 Nov 2025 |
| Form 1File: march 24 arch cer.pdf | 28 Nov 2025 |
| Form 2File: Engineer Certificate March 2024_compressed.pdf | 28 Nov 2025 |
| Form 3File: CA CER MARCH 24.pdf | 28 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold march 24.pdf | 28 Nov 2025 |
| Withdrawal Update Form 1File: ARCH CER SYS SEP25.pdf | 24 Nov 2025 |
| Withdrawal Update Form 2File: ENG CER SYS GEN SEP 25.pdf | 24 Nov 2025 |
| Withdrawal Update Form 3File: CA CERTIFICATE sep 25 sys gen.pdf | 24 Nov 2025 |
| Withdrawal Update Form 1File: june 25 arc cert techops park.pdf | 10 Nov 2025 |
| Withdrawal Update Form 1File: june 25 arc cert techops park.pdf | 10 Nov 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 195 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep TECHOPS PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KALAMNA2,800+ in Nagpur
Filed coordinates, straight-line distance. 12 registered projects within 2 km.
ARS SAMRUDHI
SHREE VENKATESHWARA INNFRA DEVELOPERS
Sai Nagri 13
Saidham Builders and Infratech
METRO HOMES
LISHA YOGESH GANGWANI
HANUMAN NAGAR
RAJESH GYANDEORAO TIDKE
AYODHYA BHUMI
Ayodhya Niwas LLP
MAHALAXMI NAGAR 30 AND VISION CITY 2
VISION INFRA
See every Nagpur project, with the district possession charts
Builder: SUNRISE DREAMLAND PVT LTD
SUNRISE DREAMLAND PVT LTD has 1 registration on MahaRERA, including TECHOPS PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if TECHOPS PARK is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of TECHOPS PARK?
The registered promoter entity is SUNRISE DREAMLAND PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in TECHOPS PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for TECHOPS PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at TECHOPS PARK?
The professionals named in the filing: Architect: C D GIRIPUNJE; Architect: AVINASH HAJARE; Engineer: AVINASH HAJARE; Chartered Accountant: SUMIT AGRAWAL; Chartered Accountant: AS DIVECHA & ASSOCIATES; Chartered Accountant: SN DIVECHA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in TECHOPS PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback