Home / Browse projects / Nagpur, Maharashtra / MAHALAXMI NAGAR 30 AND VISION CITY 2

Registered No litigation declared Plotted project

MAHALAXMI NAGAR 30 AND VISION CITY 2

By VISION INFRA

RG-MH-89849 · RERA P50500053716 · Last updated on MahaRERA portal: 14 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Aug 2028Possession promisedno revision filed
133 of 268Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 93 documents Report an error

MAHALAXMI NAGAR 30 AND VISION CITY 2 is a Plotted project by VISION INFRA in Nagpur, Maharashtra, registered with MahaRERA as P50500053716 on 22 Nov 2023. Possession is promised by 14 Aug 2028. 135 of the 268 units on this registration are recorded sold or booked.

At a glance

Project

  • NameMAHALAXMI NAGAR 30 AND VISION CITY 2
  • TypePlotted
  • Location
    • UMRED ROAD
    • TAKLI
    • Nagpur (Rural)
    • Nagpur
    • 441204
  • Pincode441204
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500053716
  • ReraGenie IDRG-MH-89849

Builder

  • NameVISION INFRA
  • Entity typePartnership
  • PartnersGIRISH YADAORAO SAKHARKAR, VIJAY RAJKUMAR JAIN, BIRENDRA KUMAR ONKARMAL YADUKA, KISHORI VIJAY ZALKE, PANKAJ HEMCHAND JAIN
  • Other registrations8 more →
  • Completed1 of 9
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredNov 2023PromisedAug 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Nov 2023
  • Promised completion14 Aug 2028
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed93 files

Current status

50%135 of 268 units booked

Figures as on 14 Jul 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities16

As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes90%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes90%
Open ParkingNoNot applicable
Water PipelineYes20%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area34,951 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNAGPUR METROPOLITIAN REGION DEVELOPMENT AUTHORITY

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNMC HOUSE 3285, KIRTI NAGAR, NARSALA ROAD, NAGPUR - 440034

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPAWAN RAVIPRASAD GUPTA
ArchitectPAWAN GUPTA
EngineerKAUSTUBH BHUMRAO NIMBARTE
EngineerMADHUKAR RAMJI SHELOTE
EngineerMR MRUTUNJAY MANGULI KHAMARI
Chartered AccountantMUTAZA HUSSAIN
Chartered AccountantHUZAIFA S SANAWADWALA
Chartered AccountantSHARMA AND BAJAJ
PartnerRole in project
VISION INFRA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 14 Aug 2028

Documents filed93

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1.pdf14 Jul 2026
Form 2File: FORM 2.pdf14 Jul 2026
Form 3File: FORM 3.pdf14 Jul 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE.pdf14 Jul 2026
Form 1File: FORM 1.pdf18 Apr 2026
Form 2File: FORM 2.pdf18 Apr 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE.pdf18 Apr 2026
Form 3File: FORM 3_11zon.pdf18 Apr 2026
Form 1File: FORM 1 OCT-DEC 26.pdf9 Jan 2026
Form 2File: FORM 2 OCT-DEC 26.pdf9 Jan 2026
Form 3File: FORM 3 OCT-DEC 26.pdf9 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OCT-DEC 26.pdf9 Jan 2026
Form 1File: form 1 architect form.pdf19 Dec 2025
Form 2File: form 2 engg.pdf19 Dec 2025
Form 3File: form 3.pdf19 Dec 2025
Disclosure of Sold and Booked InventoryFile: disclosure.pdf19 Dec 2025
Form 1File: form 1 architect form.pdf19 Dec 2025
Form 2File: form 2 engg.pdf19 Dec 2025
Form 3File: FORM_3_MARCH_11zon.pdf19 Dec 2025
Disclosure of Sold and Booked InventoryFile: disclosure.pdf19 Dec 2025
Form 1File: ARCHITECT_CERTIFICATE.pdf19 Dec 2025
Form 2File: ENGINEER_CERTIFICATE.pdf19 Dec 2025
Form 3File: FORM_3.pdf19 Dec 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE.pdf19 Dec 2025
Form 1File: ARCHITECT_CERTIFICATE.pdf19 Dec 2025
Form 2File: ENGINEER_CERTIFICATE.pdf19 Dec 2025
Form 3File: FORM_3_CA_11zon.pdf19 Dec 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE.pdf19 Dec 2025
Form 1File: ARCHITECT_CERTIFICATE.pdf19 Dec 2025
Form 2File: ENGINEER_CERTIFICATE.pdf19 Dec 2025
Form 3File: Form 3.pdf19 Dec 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE.pdf19 Dec 2025
Form 1File: Architect Cert.pdf19 Dec 2025
Form 2File: FORM 2 ENGG.pdf19 Dec 2025
Form 3File: Form 3_11zon.pdf19 Dec 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE.pdf19 Dec 2025
Form 1File: Architect.pdf19 Dec 2025
Form 2File: FORM 2 ENGG.pdf19 Dec 2025
Form 3File: Form 3.pdf19 Dec 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE.pdf19 Dec 2025
Form 1File: Architect_Certificate_0924.pdf19 Dec 2025
Form 2File: Engineer_Certificate_0924.pdf19 Dec 2025
Form 3File: FORM_3.pdf19 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold.pdf19 Dec 2025
Form 5 (FY 2023-2024)File: Form 5 01_04_24 to 31_03_25.pdf19 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 01_04_24 to 31_03_25.pdf19 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT_CERTIFICATE.pdf8 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM_3_CA_11zon.pdf8 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER_CERTIFICATE.pdf8 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM_3.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect_Certificate_0924.pdf2 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_Certificate_0924.pdf2 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT_CERTIFICATE.pdf19 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM_3.pdf19 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER_CERTIFICATE.pdf19 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM_3_MARCH_11zon.pdf6 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM- 2 (31-03-2024).pdf7 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Quaterly com (31-03-2024).pdf23 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Quaterly com (31-03-2024).pdf23 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (31-03-2024).pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: INVENTORY LIST 31-03-2024.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE 31-12-2023.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 31-12-2023.pdf29 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 (31-12-2023).pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Quarterly Compliance 10-02-2024.pdf11 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Quarterly Compliance 10-02-2024.pdf11 Feb 2024
Disclosure of sold/ booked inventoryFile: M -30 SOLD UNSOLD (31-12-2023).pdf11 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Quarterly Compliance 10-02-2024.pdf11 Feb 2024
Copy of the legal title reportFile: SEARCH REPORT.pdf8 Aug 2023
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE CERTIFICATE.pdf8 Aug 2023
Details of encumbrances concerned to FinanceFile: DETAIL OF ENCUMBRANCE CONCERNED TO LEGAL.pdf8 Aug 2023
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE CERTIFICATE.pdf8 Aug 2023
Details of encumbrances concerned to LegalFile: DETAIL OF ENCUMBRANCE CONCERNED TO LEGAL.pdf8 Aug 2023
Declaration about Commencement CertificateFile: DECLARATION OF COMMENCEMENT CERTIFICATE.pdf8 Aug 2023
Declaration in FORM BFile: AFFIDAVIT CUM DECLARATION.pdf8 Aug 2023
CERSAI detailsFile: CERSAI.pdf8 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf8 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: GIRISH.pdf8 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: VIJAY JAIN.pdf8 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: BIRENDRA.pdf8 Aug 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
VISION INFRAP50500032991Kh. No. 95/A/1, Mouza Vihirgaon, Nagpur133Feb 2022Certificate SignedOct 2023Registered original: Oct 2022Oct 2023

How this compares with Nagpur

50%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MAHALAXMI NAGAR 30 AND VISION CITY 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TAKLI2,800+ in Nagpur

2 kmMAHALAXMI NAGAR 30 AND VOther 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: VISION INFRA

VISION INFRA has 9 registrations on MahaRERA, including VISION INDRAMEGH and VISION INFRA. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if MAHALAXMI NAGAR 30 AND VISION CITY 2 is delayed beyond 14 Aug 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAHALAXMI NAGAR 30 AND VISION CITY 2?

The registered promoter entity is VISION INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAHALAXMI NAGAR 30 AND VISION CITY 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MAHALAXMI NAGAR 30 AND VISION CITY 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAHALAXMI NAGAR 30 AND VISION CITY 2?

The professionals named in the filing: Architect: PAWAN RAVIPRASAD GUPTA; Architect: PAWAN GUPTA; Engineer: KAUSTUBH BHUMRAO NIMBARTE; Engineer: MADHUKAR RAMJI SHELOTE; Engineer: MR MRUTUNJAY MANGULI KHAMARI; Chartered Accountant: MUTAZA HUSSAIN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAHALAXMI NAGAR 30 AND VISION CITY 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAHALAXMI NAGAR 30 AND VISION CITY 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAHALAXMI NAGAR 30 AND VISION CITY 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.