Completed No litigation declared Others project

Tanishq Wisteria

By Aakaar Tanishq Nirmaan J. V.

RG-MH-25540 · RERA P51900006567 · Last updated on MahaRERA portal: 19 Dec 2022

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 37 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Sep 2022Possession promisedregistration recorded completed
14 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 80%
1Complaints at MahaRERAon this registration
Jump to the 36 documents Report an error

Tanishq Wisteria is a Others project by Aakaar Tanishq Nirmaan J. V. in Elphistone, 400015, registered with MahaRERA as P51900006567 on 14 Aug 2017. The registration is recorded completed; possession was promised by 30 Sep 2022. The completion date has moved by 37 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameTanishq Wisteria
  • TypeOthers
  • Location
    • Fitwalla Road
    • Elphistone
    • 400015
  • Pincode400015
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900006567
  • ReraGenie IDRG-MH-25540

Builder

  • NameAakaar Tanishq Nirmaan J. V.
  • Entity typeOthers
  • Named personsTanishq Nirmaan, Aakaar Nirmaan Properties Private Limited

Key dates

this monthRegisteredAug 2017First promiseAug 2019Revised toSep 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Aug 2017
  • Promised completion30 Sep 2022
  • Revised completionRevised to 30 Sep 2022 (originally 31 Aug 2019)
  • Buildings2 building records
  • Documents filed36 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WingNA80000
WING BNA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 19 Dec 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 80%.

A Wing91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING B63%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 19 Dec 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes70%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed36

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots36
Closed/Covered36

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,114 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4262.0
Proposed, not sanctioned3,704 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMatunga , Maheshwari Udyan Branch Mumbai - 400 019

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYOGESH AROTE
PartnerRole in project
Aakaar Tanishq Nirmaan J. V.-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900009376Aug 2019 → Mar 2022

Reason as filed by the promoterplans amendment

EXT51900002398Aug 2019 → Aug 2020

Reason as filed by the promoterTHE PROJECT IS UNDER CONSTRUCTION. THE REHAB COMPONENT HAS BEEN COMPLETED AND THE SALE COMPONENT IS UNDER CONSTRUCTION. THE WORK SHALL BE COMPLETED WITHIN A YEAR.

Litigation declared2

CaseCourtStatus
100677/2012/2012CITY CIVIL COURT AT MUMBAIPENDING
104896/2012/2012CITY CIVIL COURT AT MUMBAIPENDING

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000023938Umesh Chandrakant SurveChetan Diensh Patel29/03/2018

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Dec 2022

Documents filed36

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate.pdf19 Dec 2022
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf19 Dec 2022
Architect’s Certificate on Completion of Project (Form 4)File: Form - 4.pdf6 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 architect's certificate ATNJV.pdf2 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 architect's certificate ATNJV.pdf2 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 architect's certificate ATNJV.pdf2 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 architect's certificate ATNJV.pdf2 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 architect's certificate ATNJV.pdf2 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 architect's certificate ATNJV.pdf1 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 architect's certificate ATNJV.pdf1 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 architect's certificate ATNJV.pdf1 Apr 2019
Certificates of CA (Form 5)File: Aakar Tanishq Nirmaan JV_Form-5.pdf30 Nov 2018
Building plan approvalFile: NEW IOD.pdf30 Jul 2017
Building plan approvalFile: OLD IOD.pdf30 Jul 2017
Building plan approvalFile: PLAN 4.pdf30 Jul 2017
Building plan approvalFile: PLAN 3.pdf30 Jul 2017
Building plan approvalFile: PLAN 2.pdf30 Jul 2017
Building plan approvalFile: PLAN 1.pdf30 Jul 2017
Layout approvalFile: Letter for Layout.pdf30 Jul 2017
PAN CardFile: Aakar Tanishq Nirmaan JV Pan Card.pdf30 Jul 2017
Copy of the legal title reportFile: Tital Certificate.pdf30 Jul 2017
Details of encumbrancesFile: No Encumbrance.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: Letter for Layout.pdf30 Jul 2017
Building Plan Approval (IOD)File: OLD IOD.pdf30 Jul 2017
Building Plan Approval (IOD)File: NEW IOD.pdf30 Jul 2017
Building Plan Approval (IOD)File: PLAN 1.pdf30 Jul 2017
Building Plan Approval (IOD)File: PLAN 2.pdf30 Jul 2017
Building Plan Approval (IOD)File: PLAN 3.pdf30 Jul 2017
Building Plan Approval (IOD)File: PLAN 4.pdf30 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: New CC.pdf30 Jul 2017
Declaration in FORM BFile: Affidavit Aakaar Tanishq Nirmaan JV.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEER CERTIFICATE JV-min.pdf30 Jul 2017
Certificates of CA (Form 3)File: FORM 3 CA CERTIFICATE JV.pdf30 Jul 2017
Proforma of Allotment letterFile: Allotment letter Format of Aakaar Tanishq Nirmaan JV.pdf30 Jul 2017
Proforma of Allotment letterFile: Letter For Agreement.pdf30 Jul 2017

Keep Tanishq Wisteria on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Elphistone

2 kmTanishq WisteriaLapsed / revoked 2Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 3 registered projects within 2 km.

Builder: Aakaar Tanishq Nirmaan J. V.

Aakaar Tanishq Nirmaan J. V. has 1 registration on MahaRERA, including Tanishq Wisteria. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if Tanishq Wisteria is delayed beyond 30 Sep 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Tanishq Wisteria?

The registered promoter entity is Aakaar Tanishq Nirmaan J. V., an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Tanishq Wisteria?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Tanishq Wisteria?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Tanishq Wisteria?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Tanishq Wisteria?

The professionals named in the filing: Architect: YOGESH AROTE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Tanishq Wisteria?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Tanishq Wisteria. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Tanishq Wisteria to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.