Home / Browse projects / Thane, Maharashtra / TAKSHILA RESIDENCY
TAKSHILA RESIDENCY
RG-MH-80467 · RERA P51700017260 · Last updated on MahaRERA portal: 23 Feb 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 16 months past the filed date
- Completion date moved by 18 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
TAKSHILA RESIDENCY is a Residential / Group Housing project by DELUX ASSOCIATES in Thane, Maharashtra, registered with MahaRERA as P51700017260 on 26 Jul 2018. Possession was promised by 30 Jun 2025 and is now 16 months past that date. The completion date has moved by 18 months from the original filing.
At a glance
Project
- NameTAKSHILA RESIDENCY
- TypeResidential / Group Housing
- Location
- BHIWANDI
- TEMGHAR
- Bhiwandi (M Corp.)
- Thane
- 421302
- Pincode421302
- RERA no.P51700017260
- ReraGenie IDRG-MH-80467
Builder
- NameDELUX ASSOCIATES
- Entity typePartnership
- PartnersMOHAMMED USAMA MOHAMMED IQBAL BANEGAR, ABDUL REHMAN MOHAMMED HUSSAIN BANEGAR, MOHAMMED KHALID MOHAMMED HUSSAIN BANEGAR, MUSAB MOHAMMAD HUSSAIN BANEGAR, GULAM DASTGIR ABDUL REHMAN BANEGAR
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on26 Jul 2018
- Promised completion30 Jun 2025
- Revised completionRevised to 30 Jun 2025 (originally 30 Dec 2023)
- Buildings1 building record
- Documents filed67 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TAKSHILA RESIDENCY | NA | 11 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.
TAKSHILA RESIDENCY: 85% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities15
As on 23 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 80% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 95% |
| Storm Water Drains | Yes | 85% |
| Landscaping & Tree Planting | Yes | 70% |
| Street Lighting | Yes | 75% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 80% |
| Electrical meter room, sub-station, receiving station | Yes | 80% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| MAHENDRA CHIRANJILAL JAIN | Bhiwandi (M Corp.) | Thane |
| BASANTILAL RAMAMIR GUPTA | Bhiwandi (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | R R CONSULTING ENGINEERS |
| Architect | R.R.CONSULTING ENGINEERS |
| Engineer | MR MAJID DHOKLE |
| Engineer | R.R.ASSOCIATES |
| Chartered Accountant | Ketan Baldevdas MIstry |
| Chartered Accountant | SANTOSH H BARNWAL |
| Partner | Role in project |
|---|---|
| DELUX ASSOCIATES | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterPROJECT EXTENSION DATE 30/06/2024 Proposed Extension date
Reason as filed by the promoterWe had taken 1st Extension till 30/06/2024. However, we have not yet received the Fire N.O.C. from the Fire Department of the Government. Our Fire consultant has issued “Letter of Deferment” Dt 18/07/2024 that Fire N.O.C. will be received in short time. We are therefore not able to obtain O.C. of the project. The Buyer(s) of the flats could not obtain housing loan from the bank as Bank insist that either produce RERA extension or final O.C. of the project. Hence, we need 2nd Extension of 6 months so as enable to obtain Fire N.O.C. and with this extension the Finance Bank would grant housing lo
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Jul 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Jul 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Jul 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Jul 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed67
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM1.pdf | 23 Feb 2026 |
| Withdrawal Update Form 1File: FORM1.pdf | 23 Feb 2026 |
| Withdrawal Update Form 2File: FORM2.pdf | 23 Feb 2026 |
| Withdrawal Update Form 2File: FORM2.pdf | 23 Feb 2026 |
| Withdrawal Update Form 3File: FORM3_JUN2024.pdf | 23 Feb 2026 |
| Withdrawal Update Form 3File: FORM3_JUN2024.pdf | 23 Feb 2026 |
| Disclosure of sold/ booked inventoryFile: Formet_B.pdf | 4 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold_flat_list.pdf | 4 Dec 2024 |
| Declaration in FORM BFile: affidavit.pdf | 9 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificates of Architect.pdf | 9 Nov 2024 |
| Certificates of CA (Form 3)File: FORM3 July_2024_Sep_2024.pdf | 9 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificates of Engineer.pdf | 9 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: FormetB.pdf | 9 Nov 2024 |
| Declaration about Commencement CertificateFile: form-D.pdf | 9 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engg_Cartificet_2A.pdf | 9 Nov 2024 |
| Declaration in FORM BFile: declaration_FormB.pdf | 10 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arct_Cert_Jun_2024.pdf | 10 Oct 2024 |
| Certificates of CA (Form 3)File: FORM3 April_2024_Jun_2024-compressed.pdf | 10 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engr_cert_Jun_2024.pdf | 10 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: sold_unsold_list.pdf | 10 Oct 2024 |
| CERSAI detailsFile: Membership Certificate.pdf | 10 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form_5_2023_24.pdf | 10 Oct 2024 |
| Declaration in FORM BFile: Affidavit_Delux.pdf | 24 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Flat Details.pdf | 24 Feb 2024 |
| Declaration in FORM BFile: Affidavit Cum Declaration_new.pdf | 22 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate.pdf | 22 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Site supervisor certificate_2A.pdf | 22 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Flat Details.pdf | 22 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1_ARCHITECT.pdf | 13 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1_ARCHITECT.pdf | 13 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1_ARCHITECT.pdf | 13 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1_ARCHITECT.pdf | 13 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1_ARCHITECT.pdf | 13 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM2_ENGINEERS.pdf | 13 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM2_ENGINEERS.pdf | 13 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM2_ENGINEERS.pdf | 13 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM2_ENGINEERS.pdf | 13 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM2_ENGINEERS.pdf | 13 Jul 2023 |
| Certificates of CA (Form 3)File: CA CERTIFICATE_2018_2019.pdf | 13 Jul 2023 |
| Certificates of CA (Form 3)File: CA CERTIFICATE_2019-20.pdf | 13 Jul 2023 |
| Certificates of CA (Form 3)File: CA CERTIFICATE_2020-21.pdf | 13 Jul 2023 |
| Certificates of CA (Form 3)File: FORM3 April_2021_MARCH_2022.pdf | 13 Jul 2023 |
| Certificates of CA (Form 3)File: FORM3 April_2022_JUN_2022.pdf | 13 Jul 2023 |
| Certificates of CA (Form 3)File: FORM3 July_2022_SEP_2022.pdf | 13 Jul 2023 |
| Certificates of CA (Form 3)File: FORM3 OCT_2022_DEC_2022.pdf | 13 Jul 2023 |
| Certificates of CA (Form 3)File: FORM3 JAN_2023_March_2023.pdf | 13 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM5_2018-19.pdf | 13 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM5_2018-19.pdf | 13 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM5_2019-20_.pdf | 13 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM5_2020-2021.pdf | 13 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM5_2021-2022.pdf | 13 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM5_2022-2023.pdf | 13 Jul 2023 |
| Building plan approvalFile: PLAN_1.pdf | 24 Jul 2018 |
| Building plan approvalFile: PLAN_2.pdf | 24 Jul 2018 |
| Layout approvalFile: LAYOUT.pdf | 24 Jul 2018 |
| PAN CardFile: PAN CARD.pdf | 24 Jul 2018 |
| Copy of the legal title reportFile: TITLE REPORT.pdf | 24 Jul 2018 |
| Details of encumbrancesFile: Encumbarance_Certificate.pdf | 24 Jul 2018 |
| Copy of Layout Approval (in case of layout)File: LAYOUT.pdf | 24 Jul 2018 |
| Building Plan Approval (IOD)File: PLAN_1.pdf | 24 Jul 2018 |
| Building Plan Approval (IOD)File: PLAN_2.pdf | 24 Jul 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 24 Jul 2018 |
| Declaration in FORM BFile: DECLARATION_PROMOTER.pdf | 24 Jul 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate.pdf | 24 Jul 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate.pdf | 24 Jul 2018 |
| Certificates of CA (Form 3)File: CA_Certificate_Form3.pdf | 24 Jul 2018 |
| Proforma of Allotment letterFile: Declaration_Agmt.pdf | 24 Jul 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- All 67 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep TAKSHILA RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near TEMGHAR7,600+ in Thane
GODREJ UPAVAN
PRAKHHYAT DWELLINGS LLP
DGT - Sector 3A - Cluster 2 - Phase 1
ADRIKA DEVELOPERS PRIVATE LIMITED
DOSTI GREATER THANE - PHASE 1
ADRIKA DEVELOPERS PRIVATE LIMITED
Dosti Greater Thane - Sector 3A - Cluster 1B -
ADRIKA DEVELOPERS PRIVATE LIMITED
USHA RESIDENCY
SHREE BUDHDEV INFRA
NARAYANI DHAM BUILDING NO 2A AND 2B
MAYA DEVELOPER
See every Thane project, with the district possession charts
Builder: DELUX ASSOCIATES
DELUX ASSOCIATES has 1 registration on MahaRERA, including TAKSHILA RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that TAKSHILA RESIDENCY shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if TAKSHILA RESIDENCY is delayed beyond 30 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of TAKSHILA RESIDENCY?
The registered promoter entity is DELUX ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in TAKSHILA RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for TAKSHILA RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at TAKSHILA RESIDENCY?
The professionals named in the filing: Architect: R R CONSULTING ENGINEERS; Architect: R.R.CONSULTING ENGINEERS; Engineer: MR MAJID DHOKLE; Engineer: R.R.ASSOCIATES; Chartered Accountant: Ketan Baldevdas MIstry; Chartered Accountant: SANTOSH H BARNWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in TAKSHILA RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback