ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / T2 Raheja Jade City

Registered Litigation declared Residential / Group Housing project

T2 Raheja Jade City

By NEWFOUND PROPERTIES AND LEASING PRIVATE LIMITED

RG-MH-32535 · RERA P51700080352 · Last updated on MahaRERA portal: 12 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • 2 complaints at MahaRERA

Clear

  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jul 2031Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 16%
43 of 208Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

T2 Raheja Jade City is a Residential / Group Housing project by NEWFOUND PROPERTIES AND LEASING PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700080352 on 26 May 2025. Possession is promised by 31 Jul 2031. 165 of the 208 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameT2 Raheja Jade City
  • TypeResidential / Group Housing
  • Location
    • MIDC Service Road
    • Juinagar
    • Turbhe MIDC Juinagar
    • Navi Mumbai (M Corp.)
    • Thane
    • 400706
  • Pincode400706
  • RERA no.P51700080352
  • ReraGenie IDRG-MH-32535

Builder

  • NameNEWFOUND PROPERTIES AND LEASING PRIVATE LIMITED
  • Entity typeCompany
  • CINU70101MH2004PTC146227
  • GSTIN27AABCN9253E1ZF
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsArvind Digamber Prabhu, Vinod Nandlal Rohira
  • Other registrations4 more →

Key dates

this monthRegisteredMay 2025PromisedJul 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 May 2025
  • Promised completion31 Jul 2031
  • Revised completionNone
  • Buildings1 building record
  • Documents filed76 files

Current status

79%165 of 208 units booked
19.8%Work done, per cost certificate

Figures as on 12 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 2 - Building 10NA30302080208

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 16%.

Tower 2 - Building 10: 38% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure16%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises1%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed229

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots229
Closed/Covered229

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,935 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Jun 2025

Approvals and building plan

Sanctioning authorityMIDC
Permissible FSI19286.11
Proposed, not sanctioned11,418 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., ICICI Bank Towers, Bandra Kurla Complex, Bandra East, Mumbai.400051, Maharashtra
Estimated costRs 114.24 cr
Cost incurredRs 22.65 cr
Work done19.82%
BuildingWingEstimatedIncurred
Tower 2 - Building 10NARs 87.35 crRs 21.05 cr
-NARs 26.90 crRs 1.59 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSumit Save
ArchitectSatyanarayan C
EngineerManish Kothari
EngineerSantosh Gupte
Chartered AccountantS. N. Doshi & Associates
PartnerRole in project
NEWFOUND PROPERTIES AND LEASING PRIVATE LIMITED-

Litigation declared1

CaseCourtStatus
680/2024Bombay High CourtOngoing

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12503400Parag PalsapureNEWFOUND PROPERTIES AND LEASING PRIVATE LIMITED23/09/2025
SM12600038Bhakti AchrekarNEWFOUND PROPERTIES AND LEASING PRIVATE LIMITED10/01/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Mar 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 May 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jul 2031

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: 2A T2-RJC Quality Assurance Certificate FYE26 UPLOAD.pdf12 Jun 2026
Withdrawal Update Form 1File: 1 T2-RJC Architect Certificate 2026-04-15 Mar2026 Plan 14082023 UPLOAD.pdf14 May 2026
Withdrawal Update Form 2File: 2 T2-RJC Engineer Certificate 2026-04-06 Mar2026 Plan 14082023 UPLOAD.pdf14 May 2026
Withdrawal Update Form 3File: 3 T2-RJC CA Certificate 2026-05-11 Mar2026 Plan 14082023 UPLOAD.pdf14 May 2026
Withdrawal Update Form 1File: 1 T2-RJC Architect Certificate 2026-03-26 Jan2026 Plan14082023 UPLOAD.pdf30 Mar 2026
Withdrawal Update Form 2File: 2 T2-RJC Engineer Certificate 2026-02-24 Jan2026 Plan 14082023 UPLOAD.pdf30 Mar 2026
Withdrawal Update Form 3File: 3 T2-RJC CA Certificate 2026-03-26 Jan2026 Plan 14082023 UPLOAD.pdf30 Mar 2026
Withdrawal Update Form 1File: 1 T2-RJC Architect Certificate 2026-01-08 Dec2025 Plan 14082023 UPLOAD.pdf16 Jan 2026
Withdrawal Update Form 2File: 2 T2-RJC Engineer Certificate 2026-01-13 Dec2025 Plan 14082023 UPLOAD.pdf16 Jan 2026
Withdrawal Update Form 3File: 3 T2-RJC CA Certificate 2026-01-15 Dec2025 Plan 14082023 UPLOAD.pdf16 Jan 2026
Withdrawal Update Form 1File: 1 T2-RJC Architect Certificate 2025-10-14 Sept2025 Plan 14082023 UPLOAD.pdf19 Oct 2025
Withdrawal Update Form 1File: 1 T2-RJC Architect Certificate 2025-10-14 Sept2025 Plan 14082023 UPLOAD.pdf19 Oct 2025
Withdrawal Update Form 1File: 1 T2-RJC Architect Certificate 2025-10-14 Sept2025 Plan 14082023 UPLOAD.pdf19 Oct 2025
Withdrawal Update Form 2File: 2 T2-RJC Engineer Certificate 2025-10-14 Sept2025 Plan 14082023 UPLOAD.pdf19 Oct 2025
Withdrawal Update Form 2File: 2 T2-RJC Engineer Certificate 2025-10-14 Sept2025 Plan 14082023 UPLOAD.pdf19 Oct 2025
Withdrawal Update Form 2File: 2 T2-RJC Engineer Certificate 2025-10-14 Sept2025 Plan 14082023 UPLOAD.pdf19 Oct 2025
Withdrawal Update Form 3File: 3 T2 Raheja Jade City CA Certificate 2025-10-17 Sept2025 Plan 14082023 UPLOAD.pdf19 Oct 2025
Withdrawal Update Form 3File: 3 T2 Raheja Jade City CA Certificate 2025-10-17 Sept2025 Plan 14082023 UPLOAD.pdf19 Oct 2025
Withdrawal Update Form 3File: 3 T2 Raheja Jade City CA Certificate 2025-10-17 Sept2025 Plan 14082023 UPLOAD.pdf19 Oct 2025
Commencement certificateFile: 2025-05-29 RJC Resi Plans Ph-1 (T2-T11) Letter Commencement Certificate UPLOAD.pdf17 Jul 2025
Withdrawal Update Form 1File: 1 T2 Raheja Jade City Architect Certificate 2025-06-02 Apr2025 Plan 14082023 UPLOAD.pdf10 Jun 2025
Withdrawal Update Form 2File: 2 T2 Raheja Jade City Engineer Certificate 2025-06-06 Apr2025 Plan 14082023 UPLOAD.pdf10 Jun 2025
Withdrawal Update Form 3File: 3 T2 Raheja Jade City CA Certificate 2025-06-10 Apr2024 Plan 14082023 UPLOAD.pdf10 Jun 2025
Other - TechnicalFile: T2 RJC Regn Fees Receipt with Cover Letter and DD Copy UPLOAD.pdf20 May 2025
Other - TechnicalFile: Plot area Declaration T2 RJC 2025-05-20 UPLOAD.pdf13 May 2025
Layout approvalFile: 2023-08-14 RJC Ph-1 Summary Extracted from layout plan UPLOAD.pdf9 May 2025
Copy of Layout Approval (in case of layout)File: 2023-08-14 RJC Ph-1 Summary Extracted from layout plan UPLOAD.pdf9 May 2025
Commencement Certificates / NA Order for plotted developmentFile: 2025-04-03 RJC Plinth Completion Arch Certificate ackn by MIDC UPLOAD.pdf5 May 2025
CERSAI detailsFile: CERSAI Declaration T2 RJC 2025-04-23 UPLOAD.pdf24 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Director Disclosure VNR 2025-04-23 UPLOAD.pdf23 Apr 2025
Other - LegalFile: Deed of Assignment SI Group-Assignor and NFPLPL-Assignee 2007-09-14 Part1of2 UPLOAD.pdf22 Apr 2025
Other - LegalFile: Deed of Assignment SI Group-Assignor and NFPLPL-Assignee 2007-09-14 Part2of2 UPLOAD.pdf22 Apr 2025
Other - LegalFile: PR Card 2022-07-04 UPLOAD.pdf22 Apr 2025
Other - TechnicalFile: Order 50 Declaration T2 RJC 2025-03-18 UPLOAD.pdf22 Apr 2025
Details of encumbrances concerned to FinanceFile: Legal Encumbrance Declaration.pdf21 Mar 2025
Details of encumbrances concerned to FinanceFile: Encumbrance Finance Declaration.pdf21 Mar 2025
Proforma of Allotment letterFile: Allotment Letter compressed T2.pdf21 Mar 2025
Declaration in FORM BFile: T2 Form B compressed.pdf21 Mar 2025
Other - LegalFile: Plot Area Declaration.pdf21 Mar 2025
Other - LegalFile: Order 50 Declaration.pdf21 Mar 2025
Declaration about Commencement CertificateFile: CC Declaration T2 RJC 2025-05-07 UPLOAD.pdf21 Mar 2025
CERSAI detailsFile: Declaration along with Annexure A and Annexure B.pdf21 Mar 2025
CERSAI detailsFile: CERSAI Report 1.pdf21 Mar 2025
CERSAI detailsFile: CERSAI Report 2.pdf21 Mar 2025
CERSAI detailsFile: CERSAI Report 3.pdf21 Mar 2025
CERSAI detailsFile: CERSAI Report 4.pdf21 Mar 2025
CERSAI detailsFile: CERSAI Report 5.pdf21 Mar 2025
Deviation Report with respect to Allotment letterFile: Deviation of Allotment with Annexure.pdf21 Mar 2025
Details of encumbrances concerned to LegalFile: Legal Encumbrance Declaration.pdf21 Mar 2025
Details of encumbrances concerned to LegalFile: Encumbrance Finance Declaration.pdf21 Mar 2025
Deviation Report with respect to model copy of AgreementFile: ATSL T2 RJC 2025-03-17 Deviation SET UPLOAD.pdf21 Mar 2025
Proforma of Agreement for saleFile: ATSL T2 RJC 2025-04-24 final UPLOAD.pdf21 Mar 2025
Copy of the legal title reportFile: Raheja Jade City Title Report 2025-03-13 UPLOAD.pdf17 Mar 2025
Other - LegalFile: T2 RJC Board Resolution 2024-11-28 UPLOAD.pdf17 Mar 2025
CERSAI detailsFile: T2 Raheja Jade City CERSAI Asset Based Search Report 2025-03-13 UPLOAD.pdf17 Mar 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: T2 NPLPL Declaration Format A 2025-03-13 UPLOAD.pdf17 Mar 2025
Other - FinanceFile: T2 RJC Board Resolution 2024-11-28 UPLOAD.pdf17 Mar 2025
Other - TechnicalFile: T2 RJC Board Resolution 2024-11-28 UPLOAD.pdf17 Mar 2025
Disclosure for secured/unsecured finance availed for the projectFile: T2 Raheja Jade City Borrowing Declaration 2025-03-17 UPLOAD.pdf17 Mar 2025
Layout approvalFile: 2023-08-14 Raheja Jade City Resi Plans Ph-1 Drawings HL T2 Part1 UPLOAD.pdf16 Mar 2025
Building plan approvalFile: 2023-08-14 Raheja Jade City Resi Plans Ph-1 Letter HL T2 UPLOAD.pdf16 Mar 2025
Building plan approvalFile: 2023-08-14 Raheja Jade City Resi Plans Ph-1 Drawings HL T2 Part1 UPLOAD.pdf16 Mar 2025
Building plan approvalFile: 2023-08-14 Raheja Jade City Resi Plans Ph-1 Drawings HL T2 Part2 UPLOAD.pdf16 Mar 2025
Building plan approvalFile: 2023-08-14 Raheja Jade City Resi Plans Ph-1 Drawings HL T2 Part3 UPLOAD.pdf16 Mar 2025
Copy of Layout Approval (in case of layout)File: 2023-08-14 Raheja Jade City Resi Plans Ph-1 Drawings HL T2 Part1 UPLOAD.pdf16 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 T2 Raheja Jade City Architect Certificate 2025-05-08 Apr2025 Plan 14082023 UPLOAD.pdf16 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 T2 Raheja Jade City CA Certificate 2025-04-23 Dec2024 Plan 14082023 UPLOAD.pdf16 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 T2 Raheja Jade City Engineer Certificate 2025-02-03 Dec2024 Plan 14082023 UPLOAD.pdf16 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: 2023-08-14 Raheja Jade City Resi Plans Ph-1 Letter Commencement Certificate all pages UPLO16 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 2023-08-14 Raheja Jade City Resi Plans Ph-1 Letter HL T2 UPLOAD.pdf16 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 2023-08-14 Raheja Jade City Resi Plans Ph-1 Drawings HL T2 Part3 UPLOAD.pdf16 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 2023-08-14 Raheja Jade City Resi Plans Ph-1 Drawings HL T2 Part2 UPLOAD.pdf16 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 2023-08-14 Raheja Jade City Resi Plans Ph-1 Drawings HL T2 Part1 UPLOAD.pdf16 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Director Disclosure ADP 2024-11-15 UPLOAD.pdf16 Mar 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: T2 Bank Declaration Format B 2025-03-11 UPLOAD.pdf16 Mar 2025
PAN CardFile: Newfound PAN Card UPLOAD.pdf13 Mar 2025

How this compares with Thane

79%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep T2 Raheja Jade City on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Turbhe MIDC Juinagar7,600+ in Thane

Builder: NEWFOUND PROPERTIES AND LEASING PRIVATE LIMITED

NEWFOUND PROPERTIES AND LEASING PRIVATE LIMITED has 5 registrations on MahaRERA, including T11 Raheja Jade City and T2 Raheja Jade City. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if T2 Raheja Jade City is delayed beyond 31 Jul 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of T2 Raheja Jade City?

The registered promoter entity is NEWFOUND PROPERTIES AND LEASING PRIVATE LIMITED, a company as per the filing. Its CIN U70101MH2004PTC146227 and GSTIN 27AABCN9253E1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in T2 Raheja Jade City?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against T2 Raheja Jade City?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for T2 Raheja Jade City?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at T2 Raheja Jade City?

The professionals named in the filing: Architect: Sumit Save; Architect: Satyanarayan C; Engineer: Manish Kothari; Engineer: Santosh Gupte; Chartered Accountant: S. N. Doshi & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in T2 Raheja Jade City?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About T2 Raheja Jade City. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save T2 Raheja Jade City to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.