Home / Browse projects / Thane, Maharashtra / T2 Raheja Jade City
T2 Raheja Jade City
By NEWFOUND PROPERTIES AND LEASING PRIVATE LIMITED
RG-MH-32535 · RERA P51700080352 · Last updated on MahaRERA portal: 12 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 1 case
- 2 complaints at MahaRERA
Clear
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
T2 Raheja Jade City is a Residential / Group Housing project by NEWFOUND PROPERTIES AND LEASING PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700080352 on 26 May 2025. Possession is promised by 31 Jul 2031. 165 of the 208 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.
At a glance
Project
- NameT2 Raheja Jade City
- TypeResidential / Group Housing
- Location
- MIDC Service Road
- Juinagar
- Turbhe MIDC Juinagar
- Navi Mumbai (M Corp.)
- Thane
- 400706
- Pincode400706
- RERA no.P51700080352
- ReraGenie IDRG-MH-32535
Builder
- NameNEWFOUND PROPERTIES AND LEASING PRIVATE LIMITED
- Entity typeCompany
- CINU70101MH2004PTC146227
- GSTIN27AABCN9253E1ZF
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- DirectorsArvind Digamber Prabhu, Vinod Nandlal Rohira
- Other registrations4 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on26 May 2025
- Promised completion31 Jul 2031
- Revised completionNone
- Buildings1 building record
- Documents filed76 files
Current status
Figures as on 12 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower 2 - Building 10 | NA | 30 | 30 | 208 | 0 | 208 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 12 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 16%.
Tower 2 - Building 10: 38% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 16% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 1% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 12 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed229
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Tower 2 - Building 10 | NA | Rs 87.35 cr | Rs 21.05 cr |
| - | NA | Rs 26.90 cr | Rs 1.59 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sumit Save |
| Architect | Satyanarayan C |
| Engineer | Manish Kothari |
| Engineer | Santosh Gupte |
| Chartered Accountant | S. N. Doshi & Associates |
| Partner | Role in project |
|---|---|
| NEWFOUND PROPERTIES AND LEASING PRIVATE LIMITED | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 680/2024 | Bombay High Court | Ongoing |
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12503400 | Parag Palsapure | NEWFOUND PROPERTIES AND LEASING PRIVATE LIMITED | 23/09/2025 |
| SM12600038 | Bhakti Achrekar | NEWFOUND PROPERTIES AND LEASING PRIVATE LIMITED | 10/01/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Mar 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 May 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Mar 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Jul 2031
Documents filed76
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: 2A T2-RJC Quality Assurance Certificate FYE26 UPLOAD.pdf | 12 Jun 2026 |
| Withdrawal Update Form 1File: 1 T2-RJC Architect Certificate 2026-04-15 Mar2026 Plan 14082023 UPLOAD.pdf | 14 May 2026 |
| Withdrawal Update Form 2File: 2 T2-RJC Engineer Certificate 2026-04-06 Mar2026 Plan 14082023 UPLOAD.pdf | 14 May 2026 |
| Withdrawal Update Form 3File: 3 T2-RJC CA Certificate 2026-05-11 Mar2026 Plan 14082023 UPLOAD.pdf | 14 May 2026 |
| Withdrawal Update Form 1File: 1 T2-RJC Architect Certificate 2026-03-26 Jan2026 Plan14082023 UPLOAD.pdf | 30 Mar 2026 |
| Withdrawal Update Form 2File: 2 T2-RJC Engineer Certificate 2026-02-24 Jan2026 Plan 14082023 UPLOAD.pdf | 30 Mar 2026 |
| Withdrawal Update Form 3File: 3 T2-RJC CA Certificate 2026-03-26 Jan2026 Plan 14082023 UPLOAD.pdf | 30 Mar 2026 |
| Withdrawal Update Form 1File: 1 T2-RJC Architect Certificate 2026-01-08 Dec2025 Plan 14082023 UPLOAD.pdf | 16 Jan 2026 |
| Withdrawal Update Form 2File: 2 T2-RJC Engineer Certificate 2026-01-13 Dec2025 Plan 14082023 UPLOAD.pdf | 16 Jan 2026 |
| Withdrawal Update Form 3File: 3 T2-RJC CA Certificate 2026-01-15 Dec2025 Plan 14082023 UPLOAD.pdf | 16 Jan 2026 |
| Withdrawal Update Form 1File: 1 T2-RJC Architect Certificate 2025-10-14 Sept2025 Plan 14082023 UPLOAD.pdf | 19 Oct 2025 |
| Withdrawal Update Form 1File: 1 T2-RJC Architect Certificate 2025-10-14 Sept2025 Plan 14082023 UPLOAD.pdf | 19 Oct 2025 |
| Withdrawal Update Form 1File: 1 T2-RJC Architect Certificate 2025-10-14 Sept2025 Plan 14082023 UPLOAD.pdf | 19 Oct 2025 |
| Withdrawal Update Form 2File: 2 T2-RJC Engineer Certificate 2025-10-14 Sept2025 Plan 14082023 UPLOAD.pdf | 19 Oct 2025 |
| Withdrawal Update Form 2File: 2 T2-RJC Engineer Certificate 2025-10-14 Sept2025 Plan 14082023 UPLOAD.pdf | 19 Oct 2025 |
| Withdrawal Update Form 2File: 2 T2-RJC Engineer Certificate 2025-10-14 Sept2025 Plan 14082023 UPLOAD.pdf | 19 Oct 2025 |
| Withdrawal Update Form 3File: 3 T2 Raheja Jade City CA Certificate 2025-10-17 Sept2025 Plan 14082023 UPLOAD.pdf | 19 Oct 2025 |
| Withdrawal Update Form 3File: 3 T2 Raheja Jade City CA Certificate 2025-10-17 Sept2025 Plan 14082023 UPLOAD.pdf | 19 Oct 2025 |
| Withdrawal Update Form 3File: 3 T2 Raheja Jade City CA Certificate 2025-10-17 Sept2025 Plan 14082023 UPLOAD.pdf | 19 Oct 2025 |
| Commencement certificateFile: 2025-05-29 RJC Resi Plans Ph-1 (T2-T11) Letter Commencement Certificate UPLOAD.pdf | 17 Jul 2025 |
| Withdrawal Update Form 1File: 1 T2 Raheja Jade City Architect Certificate 2025-06-02 Apr2025 Plan 14082023 UPLOAD.pdf | 10 Jun 2025 |
| Withdrawal Update Form 2File: 2 T2 Raheja Jade City Engineer Certificate 2025-06-06 Apr2025 Plan 14082023 UPLOAD.pdf | 10 Jun 2025 |
| Withdrawal Update Form 3File: 3 T2 Raheja Jade City CA Certificate 2025-06-10 Apr2024 Plan 14082023 UPLOAD.pdf | 10 Jun 2025 |
| Other - TechnicalFile: T2 RJC Regn Fees Receipt with Cover Letter and DD Copy UPLOAD.pdf | 20 May 2025 |
| Other - TechnicalFile: Plot area Declaration T2 RJC 2025-05-20 UPLOAD.pdf | 13 May 2025 |
| Layout approvalFile: 2023-08-14 RJC Ph-1 Summary Extracted from layout plan UPLOAD.pdf | 9 May 2025 |
| Copy of Layout Approval (in case of layout)File: 2023-08-14 RJC Ph-1 Summary Extracted from layout plan UPLOAD.pdf | 9 May 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: 2025-04-03 RJC Plinth Completion Arch Certificate ackn by MIDC UPLOAD.pdf | 5 May 2025 |
| CERSAI detailsFile: CERSAI Declaration T2 RJC 2025-04-23 UPLOAD.pdf | 24 Apr 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Director Disclosure VNR 2025-04-23 UPLOAD.pdf | 23 Apr 2025 |
| Other - LegalFile: Deed of Assignment SI Group-Assignor and NFPLPL-Assignee 2007-09-14 Part1of2 UPLOAD.pdf | 22 Apr 2025 |
| Other - LegalFile: Deed of Assignment SI Group-Assignor and NFPLPL-Assignee 2007-09-14 Part2of2 UPLOAD.pdf | 22 Apr 2025 |
| Other - LegalFile: PR Card 2022-07-04 UPLOAD.pdf | 22 Apr 2025 |
| Other - TechnicalFile: Order 50 Declaration T2 RJC 2025-03-18 UPLOAD.pdf | 22 Apr 2025 |
| Details of encumbrances concerned to FinanceFile: Legal Encumbrance Declaration.pdf | 21 Mar 2025 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Finance Declaration.pdf | 21 Mar 2025 |
| Proforma of Allotment letterFile: Allotment Letter compressed T2.pdf | 21 Mar 2025 |
| Declaration in FORM BFile: T2 Form B compressed.pdf | 21 Mar 2025 |
| Other - LegalFile: Plot Area Declaration.pdf | 21 Mar 2025 |
| Other - LegalFile: Order 50 Declaration.pdf | 21 Mar 2025 |
| Declaration about Commencement CertificateFile: CC Declaration T2 RJC 2025-05-07 UPLOAD.pdf | 21 Mar 2025 |
| CERSAI detailsFile: Declaration along with Annexure A and Annexure B.pdf | 21 Mar 2025 |
| CERSAI detailsFile: CERSAI Report 1.pdf | 21 Mar 2025 |
| CERSAI detailsFile: CERSAI Report 2.pdf | 21 Mar 2025 |
| CERSAI detailsFile: CERSAI Report 3.pdf | 21 Mar 2025 |
| CERSAI detailsFile: CERSAI Report 4.pdf | 21 Mar 2025 |
| CERSAI detailsFile: CERSAI Report 5.pdf | 21 Mar 2025 |
| Deviation Report with respect to Allotment letterFile: Deviation of Allotment with Annexure.pdf | 21 Mar 2025 |
| Details of encumbrances concerned to LegalFile: Legal Encumbrance Declaration.pdf | 21 Mar 2025 |
| Details of encumbrances concerned to LegalFile: Encumbrance Finance Declaration.pdf | 21 Mar 2025 |
| Deviation Report with respect to model copy of AgreementFile: ATSL T2 RJC 2025-03-17 Deviation SET UPLOAD.pdf | 21 Mar 2025 |
| Proforma of Agreement for saleFile: ATSL T2 RJC 2025-04-24 final UPLOAD.pdf | 21 Mar 2025 |
| Copy of the legal title reportFile: Raheja Jade City Title Report 2025-03-13 UPLOAD.pdf | 17 Mar 2025 |
| Other - LegalFile: T2 RJC Board Resolution 2024-11-28 UPLOAD.pdf | 17 Mar 2025 |
| CERSAI detailsFile: T2 Raheja Jade City CERSAI Asset Based Search Report 2025-03-13 UPLOAD.pdf | 17 Mar 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: T2 NPLPL Declaration Format A 2025-03-13 UPLOAD.pdf | 17 Mar 2025 |
| Other - FinanceFile: T2 RJC Board Resolution 2024-11-28 UPLOAD.pdf | 17 Mar 2025 |
| Other - TechnicalFile: T2 RJC Board Resolution 2024-11-28 UPLOAD.pdf | 17 Mar 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: T2 Raheja Jade City Borrowing Declaration 2025-03-17 UPLOAD.pdf | 17 Mar 2025 |
| Layout approvalFile: 2023-08-14 Raheja Jade City Resi Plans Ph-1 Drawings HL T2 Part1 UPLOAD.pdf | 16 Mar 2025 |
| Building plan approvalFile: 2023-08-14 Raheja Jade City Resi Plans Ph-1 Letter HL T2 UPLOAD.pdf | 16 Mar 2025 |
| Building plan approvalFile: 2023-08-14 Raheja Jade City Resi Plans Ph-1 Drawings HL T2 Part1 UPLOAD.pdf | 16 Mar 2025 |
| Building plan approvalFile: 2023-08-14 Raheja Jade City Resi Plans Ph-1 Drawings HL T2 Part2 UPLOAD.pdf | 16 Mar 2025 |
| Building plan approvalFile: 2023-08-14 Raheja Jade City Resi Plans Ph-1 Drawings HL T2 Part3 UPLOAD.pdf | 16 Mar 2025 |
| Copy of Layout Approval (in case of layout)File: 2023-08-14 Raheja Jade City Resi Plans Ph-1 Drawings HL T2 Part1 UPLOAD.pdf | 16 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 T2 Raheja Jade City Architect Certificate 2025-05-08 Apr2025 Plan 14082023 UPLOAD.pdf | 16 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 T2 Raheja Jade City CA Certificate 2025-04-23 Dec2024 Plan 14082023 UPLOAD.pdf | 16 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 T2 Raheja Jade City Engineer Certificate 2025-02-03 Dec2024 Plan 14082023 UPLOAD.pdf | 16 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: 2023-08-14 Raheja Jade City Resi Plans Ph-1 Letter Commencement Certificate all pages UPLO | 16 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 2023-08-14 Raheja Jade City Resi Plans Ph-1 Letter HL T2 UPLOAD.pdf | 16 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 2023-08-14 Raheja Jade City Resi Plans Ph-1 Drawings HL T2 Part3 UPLOAD.pdf | 16 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 2023-08-14 Raheja Jade City Resi Plans Ph-1 Drawings HL T2 Part2 UPLOAD.pdf | 16 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 2023-08-14 Raheja Jade City Resi Plans Ph-1 Drawings HL T2 Part1 UPLOAD.pdf | 16 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Director Disclosure ADP 2024-11-15 UPLOAD.pdf | 16 Mar 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: T2 Bank Declaration Format B 2025-03-11 UPLOAD.pdf | 16 Mar 2025 |
| PAN CardFile: Newfound PAN Card UPLOAD.pdf | 13 Mar 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations, which the RERA portal never shows together
- All 76 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep T2 Raheja Jade City on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Turbhe MIDC Juinagar7,600+ in Thane
NMS Gami Palm Amore
VISION INFRA LLP
DELTA PALMBEACH
BALAJI CORPORATION
Cyber Square - 1
GREENSCAPE IT PARK LLP
Shreeji Destiny NX
Kasturi Hotels Private Limited
24 HIGH
DREAM APEX REALTIES LIMITED
DELTA STELLAR
NOBLE ORGANICS PVT. LTD.
See every Thane project, with the district possession charts
Builder: NEWFOUND PROPERTIES AND LEASING PRIVATE LIMITED
NEWFOUND PROPERTIES AND LEASING PRIVATE LIMITED has 5 registrations on MahaRERA, including T11 Raheja Jade City and T2 Raheja Jade City. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if T2 Raheja Jade City is delayed beyond 31 Jul 2031?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of T2 Raheja Jade City?
The registered promoter entity is NEWFOUND PROPERTIES AND LEASING PRIVATE LIMITED, a company as per the filing. Its CIN U70101MH2004PTC146227 and GSTIN 27AABCN9253E1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in T2 Raheja Jade City?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against T2 Raheja Jade City?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for T2 Raheja Jade City?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at T2 Raheja Jade City?
The professionals named in the filing: Architect: Sumit Save; Architect: Satyanarayan C; Engineer: Manish Kothari; Engineer: Santosh Gupte; Chartered Accountant: S. N. Doshi & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in T2 Raheja Jade City?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback