ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / DELTA STELLAR

Registered No litigation declared Others project

DELTA STELLAR

By NOBLE ORGANICS PVT. LTD.

RG-MH-76739 · RERA P51700049320 · Last updated on MahaRERA portal: 22 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Apr 2029Possession promisedmoved 4 months from the original
13 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 85%
526 of 620Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 109 documents Report an error

DELTA STELLAR is a Others project by NOBLE ORGANICS PVT. LTD. in Thane, Maharashtra, registered with MahaRERA as P51700049320 on 7 Feb 2023. Possession is promised by 30 Apr 2029. The completion date has moved by 4 months from the original filing. 94 of the 620 units on this registration are recorded sold or booked, and 13 of 22 construction stages are filed complete.

At a glance

Project

  • NameDELTA STELLAR
  • TypeOthers
  • Location
    • PLOT NO. D-43/3 AND D-43/4 TTC INDUSTRIAL AREA SHIRAVNE
    • TTC INDUSTRIAL AREA
    • SHIRAVNE NERUL MIDC NAVI MUMBAI
    • Navi Mumbai (M Corp.)
    • Thane
    • 400706
  • Pincode400706
  • RERA no.P51700049320
  • ReraGenie IDRG-MH-76739

Builder

  • NameNOBLE ORGANICS PVT. LTD.
  • Entity typeCompany
  • CINU45100MH1980PTC022546
  • GSTIN27AAACN1844N1Z8
  • DirectorPRASHANT BABUBHAI GAJIPARA

Key dates

this monthRegisteredFeb 2023First promiseDec 2028Revised toApr 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Feb 2023
  • Promised completion30 Apr 2029
  • Revised completionRevised to 30 Apr 2029 (originally 31 Dec 2028)
  • Buildings2 building records
  • Documents filed109 files

Current status

15%94 of 620 units booked
45.8%Work done, per cost certificate

Figures as on 22 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
COMMERCIAL PARKNA37320170170
IT PARKNA37320450450

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 22 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

13 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 85%.

COMMERCIAL PARK91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
IT PARK73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Progress on shared amenities15

As on 22 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes20%
Landscaping & Tree PlantingYes10%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes30%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed194

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots194
Closed/Covered149
Open Space45
BuildingClosed/CoveredOpen SpaceTotal
COMMERCIAL PARK491564
IT PARK10030130

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area11,571 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 May 2026

Approvals and building plan

Sanctioning authorityMAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION
Permissible FSI34713.0
Proposed, not sanctioned11,363 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSECTOR 15 CBD BELAPUR NAVI MUMBAI 400614
Estimated costRs 237.50 cr
Cost incurredRs 108.76 cr
Work done45.79%
BuildingWingEstimatedIncurred
COMMERCIAL PARKNARs 112.81 crRs 53.87 cr
IT PARKNARs 112.81 crRs 53.87 cr
-NARs 11.88 crRs 1.02 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHOEB MOHAMMED
EngineerANISH KUMAR YADAV
EngineerAkshay Barkade
Chartered AccountantNAINA JAIN
Chartered AccountantSamarpit Pingale
Chartered AccountantVALLABH VIJAY JOSHI JOSHI
PartnerRole in project
NOBLE ORGANICS PVT. LTD.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P51700049320/WarDec 2028 → Apr 2029

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2029

Documents filed109

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 109 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A_FY-2025-26- Stellar.pdf22 Sep 2026
Withdrawal Update Form 1File: Form 2 - Delta Stellar as on June 2026.pdf26 Aug 2026
Withdrawal Update Form 2File: Form 2 - Delta Stellar as on June 2026.pdf26 Aug 2026
Withdrawal Update Form 3File: Final Form-3 Delta Stellar June 2026.pdf26 Aug 2026
Withdrawal Update Form 1File: Form 2 - Delta Stellar as on June 2026.pdf25 Aug 2026
Withdrawal Update Form 2File: Form 2 - Delta Stellar as on June 2026.pdf25 Aug 2026
Withdrawal Update Form 3File: Form 3 - Delta Stellar as on June 2026.pdf25 Aug 2026
Withdrawal Update Form 1File: Delta Stellar.pdf5 May 2026
Withdrawal Update Form 1File: form 1.pdf5 May 2026
Withdrawal Update Form 1File: Form 1.pdf5 May 2026
Withdrawal Update Form 1File: Form 1.pdf5 May 2026
Withdrawal Update Form 1File: Form 1.pdf5 May 2026
Withdrawal Update Form 2File: form 2.pdf5 May 2026
Withdrawal Update Form 2File: form 2.pdf5 May 2026
Withdrawal Update Form 2File: Form-2 Dec 25.pdf5 May 2026
Withdrawal Update Form 2File: Form-2 Dec 25.pdf5 May 2026
Withdrawal Update Form 2File: Form-2 Dec 25.pdf5 May 2026
Withdrawal Update Form 3File: RERA Form 3.pdf5 May 2026
Withdrawal Update Form 3File: RERA Form 3.pdf5 May 2026
Withdrawal Update Form 3File: RERA Form 3.pdf5 May 2026
Withdrawal Update Form 3File: RERA Form 3.pdf5 May 2026
Withdrawal Update Form 3File: RERA Form 3.pdf5 May 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Delta Setllar.pdf21 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: f3.pdf21 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 3 Delta Stellar.pdf21 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Delta Stellar- Form-1.pdf18 Apr 2025
Building plan approvalFile: 1-5.pdf29 Mar 2025
Building plan approvalFile: 6-10.pdf29 Mar 2025
Building plan approvalFile: 11-15.pdf29 Mar 2025
Building plan approvalFile: 16-21.pdf29 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: Full CC Delta Stellar.pdf29 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 1-5.pdf29 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 6-10.pdf29 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 11-15.pdf29 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 16-21.pdf29 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DELTA STELLAR signed.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Stellar Form-1 28-02-2025.pdf6 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Stellar.pdf6 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: CC copy for Plot D 43.pdf8 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC copy for Plot D 43.pdf8 Oct 2024
Form 5 (FY 2023-2024)File: Noble Form 5.pdf30 Sep 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Delta Stellar (Q1) FY 24-25.pdf26 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: D sTELLAR- Form No 2 Eng Certificate.pdf19 Jul 2024
Proforma of Agreement for saleFile: DRAFT OF AGREEMENT - DELTA STELLAR 7-6-24.pdf7 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1 2024 Form 1 D Stellar.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1 2024 D Stellar Form No 2 Eng Certificate below 1mb.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1 2024 Form 3 D Stellar below 1 mb.pdf20 Apr 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Stellar.pdf16 Apr 2024
Details of encumbrances concerned to LegalFile: Encumbrance Stellar.pdf16 Apr 2024
Proforma of Agreement for saleFile: DRAFT OF AGREEMENT - DELTA STELLAR with Mortgage clause.pdf16 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Delta Staller - Form 3 -.pdf22 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-A-180124.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed Q4 2023 D Stellar Form No 2 Eng Certificate.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Delta Stellar_compressed.pdf21 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate_compressed.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_compressed.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed.pdf28 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 01_Form A.pdf16 Sep 2023
Proforma of Allotment letterFile: RERA Allotment Letter_Noble.pdf4 Feb 2023
Deviation Report with respect to Allotment letterFile: Deviation Report - Allotment Letter -Noble (1).pdf4 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Dicslosure of Interest in other real estate organisation NBG.pdf24 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Dicslosure of Interest in other real estate organisation - PBG.pdf24 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Dicslosure of Interest in other real estate organisation - GDP.pdf24 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Dicslosure of Interest in other real estate organisation - JVP.pdf24 Jan 2023
Building plan approvalFile: Approved Plan-1.pdf17 Jan 2023
Building plan approvalFile: Approved Plan-2.pdf17 Jan 2023
Building plan approvalFile: Approved Plan-3.pdf17 Jan 2023
Building plan approvalFile: Approved Plan-4.pdf17 Jan 2023
Building plan approvalFile: Approved Plan-5.pdf17 Jan 2023
Building plan approvalFile: Approved Plan-6.pdf17 Jan 2023
Building plan approvalFile: Approved Plan-7.pdf17 Jan 2023
Building plan approvalFile: Approved Plan-8.pdf17 Jan 2023
Building plan approvalFile: Approved Plan-9.pdf17 Jan 2023
Copy of the legal title reportFile: Legal Report.pdf17 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Approved Plan-1.pdf17 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Approved Plan-2.pdf17 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Approved Plan-3.pdf17 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Approved Plan-4.pdf17 Jan 2023

How this compares with Thane

15%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 4 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DELTA STELLAR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TTC INDUSTRIAL AREA, SHIRAVNE NERUL MIDC NAVI MUMBAI7,600+ in Thane

Builder: NOBLE ORGANICS PVT. LTD.

NOBLE ORGANICS PVT. LTD. has 1 registration on MahaRERA, including DELTA STELLAR. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if DELTA STELLAR is delayed beyond 30 Apr 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DELTA STELLAR?

The registered promoter entity is NOBLE ORGANICS PVT. LTD., a company as per the filing. Its CIN U45100MH1980PTC022546 and GSTIN 27AAACN1844N1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DELTA STELLAR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DELTA STELLAR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DELTA STELLAR?

The professionals named in the filing: Architect: SHOEB MOHAMMED; Engineer: ANISH KUMAR YADAV; Engineer: Akshay Barkade; Chartered Accountant: NAINA JAIN; Chartered Accountant: Samarpit Pingale; Chartered Accountant: VALLABH VIJAY JOSHI JOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DELTA STELLAR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DELTA STELLAR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DELTA STELLAR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.