SYMPHONY
RG-MH-99638 · RERA P50500052682 · Last updated on MahaRERA portal: 14 Oct 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SYMPHONY is a Residential / Group Housing project by MAHESH WAMANRAO CHUTE in Nagpur, Maharashtra, registered with MahaRERA as P50500052682 on 20 Sep 2023. Possession is promised by 1 Aug 2027.
At a glance
Project
- NameSYMPHONY
- TypeResidential / Group Housing
- Location
- Dabha
- Nagpur (M Corp.)
- Nagpur (Urban)
- Nagpur
- 440023
- Pincode440023
- RERA no.P50500052682
- ReraGenie IDRG-MH-99638
Builder
- NameMAHESH WAMANRAO CHUTE
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on20 Sep 2023
- Promised completion1 Aug 2027
- Revised completionNone
- Buildings1 building record
- Documents filed102 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SYMPHONY | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 14 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.
SYMPHONY: 79% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 75% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 14 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed27
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| NANDA TULRAM MENDHE | Ramtek | Nagpur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | YASHWANT POCHALWAR |
| Engineer | KARTIK TEKCHAND SAHARE |
| Engineer | Yash Associates |
| Chartered Accountant | CA Huzaifa Sanawadwala |
| Chartered Accountant | M.Hussain & Co. |
| Chartered Accountant | DANISH ARIF AKBANI |
| Partner | Role in project |
|---|---|
| MAHESH WAMANRAO CHUTE | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Aug 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Aug 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Aug 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 1 Aug 2027
Documents filed102
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Architect Certificate.pdf | 14 Oct 2025 |
| Form 2File: Engineer Certificate.pdf | 14 Oct 2025 |
| Form 3File: Form 3 - CA.pdf | 14 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventry 10-Oct-2025 16-54-07.pdf | 14 Oct 2025 |
| Self-declaration of Quarterly ProgressFile: SELF DECLARATION.pdf | 14 Oct 2025 |
| Form 1File: FORM-1 ARCH.pdf | 14 Jul 2025 |
| Form 2File: FORM-2 ENGG.pdf | 14 Jul 2025 |
| Form 3File: FORM-3 CA.pdf | 14 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY.pdf | 14 Jul 2025 |
| Self-declaration of Quarterly ProgressFile: SELF DECLARATION.pdf | 14 Jul 2025 |
| Form 1File: Architect Certificate(1) 14-Oct-2023 13-31-03.pdf | 31 May 2025 |
| Form 2File: Form 2 1410 14-Oct-2023 13-17-48.pdf | 31 May 2025 |
| Form 3File: FORM 3.pdf | 31 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory 141023 14-Oct-2023 13-39-33.pdf | 31 May 2025 |
| Form 1File: FORM 1 ARCHITECT.pdf | 31 May 2025 |
| Form 2File: FORM 2 ENGG.pdf | 31 May 2025 |
| Form 3File: FORM 3-CA.pdf | 31 May 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf | 31 May 2025 |
| Form 1File: ARC FORM-1.pdf | 31 May 2025 |
| Form 2File: ENGG FORM-2.pdf | 31 May 2025 |
| Form 3File: FORM 3 SYMPHONY.pdf | 31 May 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY.pdf | 31 May 2025 |
| OthersFile: FORM-2A.pdf | 31 May 2025 |
| Form 1File: FORM-1 ARCH.pdf | 31 May 2025 |
| Form 2File: FORM-2 ENGG.pdf | 31 May 2025 |
| Form 3File: FORM-3 SYMPHONY.pdf | 31 May 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY.pdf | 31 May 2025 |
| Form 1File: ARCHH FORM-1.pdf | 31 May 2025 |
| Form 2File: ENGG FORM-2 (1).pdf | 31 May 2025 |
| Form 3File: Form 3 - CA.pdf | 31 May 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY.pdf | 31 May 2025 |
| Form 1File: FORM1 ARCH.pdf | 31 May 2025 |
| Form 2File: FORM-2 ENGG.pdf | 31 May 2025 |
| Form 3File: Form 3 - CA.pdf | 31 May 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY.pdf | 31 May 2025 |
| Form 1File: FORM-1 ARCH.pdf | 31 May 2025 |
| Form 2File: FORM-2 ENGG.pdf | 31 May 2025 |
| Form 3File: FORM-3 CA.pdf | 31 May 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY.pdf | 31 May 2025 |
| Form 2A (FY 2023-2024)File: FORM-2A.pdf | 31 May 2025 |
| Form 2A (FY 2024-2025)File: FORM-2A.pdf | 31 May 2025 |
| Form 5 (FY 2023-2024)File: Form 5 - CA (2023-24).pdf | 31 May 2025 |
| Form 5 (FY 2024-2025)File: Form 5 - CA (2024-25).pdf | 31 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ARCH.pdf | 14 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 CA.pdf | 14 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ENGG.pdf | 14 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: INVENTORY.pdf | 14 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - CA.pdf | 14 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 ARCH.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ENGG.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: INVENTORY.pdf | 20 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A ENGG.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHH FORM-1.pdf | 26 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA.pdf | 26 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG FORM-2 (1).pdf | 26 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: INVENTORY.pdf | 26 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ARCH.pdf | 3 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ENGG.pdf | 3 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A ENGG QUALITY ASSURANCE.pdf | 3 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: INVENTORY.pdf | 3 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 SYMPHONY.pdf | 3 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SYMPHONY.pdf | 4 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC FORM-1.pdf | 17 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG FORM-2.pdf | 17 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2A.pdf | 17 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: INVENTORY.pdf | 17 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT.pdf | 22 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG.pdf | 22 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf | 22 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-CA.pdf | 22 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_11zon.pdf | 19 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect.pdf | 17 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 17 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2A.pdf | 17 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Inventroy.pdf | 17 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Inventroy.pdf | 17 Oct 2023 |
| Other - TechnicalFile: Clarification On Verification of CC.pdf | 13 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: organized (8).pdf | 24 Aug 2023 |
| Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement (7) (1).pdf | 24 Aug 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 102 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SYMPHONY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DABHA2,800+ in Nagpur
PREMIER HERITAGE WADDHAMNA -182
PREMIER HERITAGE
PREMIER HERITAGE WADDHAMNA -181
PREMIER HERITAGE
SHREE RAM EMPIRE
SANJAY PAIDLEWAR, NITISH CHORDIA AND SHISH
SDPL Aashray Dabha II
SANDEEP DWELLERS PVT. LTD.
PREMIER HERITAGE WADDHAMNA -183
PREMIER HERITAGE
SDPL Suvarnabhumi
SANDEEP DWELLERS PVT. LTD.
See every Nagpur project, with the district possession charts
Builder: MAHESH WAMANRAO CHUTE
MAHESH WAMANRAO CHUTE has 1 registration on MahaRERA, including SYMPHONY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if SYMPHONY is delayed beyond 1 Aug 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SYMPHONY?
The registered promoter entity is MAHESH WAMANRAO CHUTE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SYMPHONY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SYMPHONY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SYMPHONY?
The professionals named in the filing: Architect: YASHWANT POCHALWAR; Engineer: KARTIK TEKCHAND SAHARE; Engineer: Yash Associates; Chartered Accountant: CA Huzaifa Sanawadwala; Chartered Accountant: M.Hussain & Co.; Chartered Accountant: DANISH ARIF AKBANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SYMPHONY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback