Registered No litigation declared Residential / Group Housing project

SWEET HOME CO-OPERATIVE HOUSING SOCIETY

By ASHWAMEDH SPACES PRIVATE LIMITED

RG-MH-07450 · RERA P52100076987 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 11 other registrations.

See what the report covers Free either way: .
Mar 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 80%
25 of 30Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 61 documents Report an error

SWEET HOME CO-OPERATIVE HOUSING SOCIETY is a Residential / Group Housing project by ASHWAMEDH SPACES PRIVATE LIMITED in Erandwane, 411004, registered with MahaRERA as P52100076987 on 10 Jul 2024. Possession is promised by 31 Mar 2027. 5 of the 30 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSWEET HOME CO-OPERATIVE HOUSING SOCIETY
  • TypeResidential / Group Housing
  • Location
    • Pandurang Colony
    • Erandwane
    • 411004
  • Pincode411004
  • RERA no.P52100076987
  • ReraGenie IDRG-MH-07450

Builder

  • NameASHWAMEDH SPACES PRIVATE LIMITED
  • Entity typeCompany
  • CINU45200PN2013PTC146453
  • GSTIN27AALCA4065D1ZS
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorDhawal Anil Vidwans
  • Other registrations11 more →
  • Completed9 of 12
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2024PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Jul 2024
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed61 files

Current status

17%5 of 30 units booked
44.3%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SWEET HOME CO-OPERATIVE HOUSING SOCIETYNA7030030

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 80%.

SWEET HOME CO-OPERATIVE HOUSING SOCIETY: 47% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed22

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots22
Closed/Covered22

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,027 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Sweethome Co-Operative Housing Society-Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI2798.56
Proposed, not sanctioned2,299 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 9 S NO 11 A WING KENT EXCLUSIVE SHIVAKAR ROAD WANAWADI PUNE 411 040
Estimated costRs 13.29 cr
Cost incurredRs 5.88 cr
Work done44.28%
BuildingWingEstimatedIncurred
SWEET HOME CO-OPERATIVE HOUSING SOCIETYNARs 13.29 crRs 5.88 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGohad Architects
EngineerMr Akash Tarde
EngineerRANJIT WANKHEDE
EngineerAkash Tarde
EngineerViren Rathod
Chartered AccountantPhule Wagh & Associates LLP
Chartered AccountantSAAI & Co
Chartered AccountantANUJA RAHUL LIMAYE
Chartered AccountantKRISHA KUKREJA
PartnerRole in project
ASHWAMEDH SPACES PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed61

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Sweet Home.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1 Sweet Home.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 Sweet Home.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 Sweet Home.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 Sweet Home.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 Sweet Home.pdf20 Apr 2026
Withdrawal Update Form 1File: RERA FORM 1 SWEET HOME 19012026.pdf19 Jan 2026
Withdrawal Update Form 2File: Sweethome Form 2 QPR Q3FY26 (1).pdf19 Jan 2026
Withdrawal Update Form 3File: RERA FORM 3 SWEET HOME 18012026.pdf19 Jan 2026
Withdrawal Update Form 1File: Sweethome Form1 300925.pdf20 Oct 2025
Withdrawal Update Form 2File: Form 2 Swt Hm 201025.pdf20 Oct 2025
Withdrawal Update Form 3File: FORM 3- Sweethome 201025.pdf20 Oct 2025
Withdrawal Update Form 1File: Sweet home-architect certificate-30-06-2025.pdf15 Jul 2025
Withdrawal Update Form 1File: Sweet home-architect certificate-30-06-2025.pdf15 Jul 2025
Withdrawal Update Form 1File: Sweet home-architect certificate-30-06-2025.pdf15 Jul 2025
Withdrawal Update Form 2File: SWEET HOME-engineer certificate-30-06-2025.pdf15 Jul 2025
Withdrawal Update Form 2File: SWEET HOME-engineer certificate-30-06-2025.pdf15 Jul 2025
Withdrawal Update Form 2File: SWEET HOME-engineer certificate-30-06-2025.pdf15 Jul 2025
Withdrawal Update Form 3File: RERA FORM 3 SWEET HOME Q2Rev.pdf15 Jul 2025
Withdrawal Update Form 3File: RERA FORM 3 SWEET HOME Q2Rev.pdf15 Jul 2025
Withdrawal Update Form 3File: RERA FORM 3 SWEET HOME Q2Rev.pdf15 Jul 2025
Form 1File: Form 1 Sweethome Q4FY25.pdf12 Jun 2025
Form 2File: Form 2 Sweethome Q4FY25.pdf12 Jun 2025
Form 3File: Form 3 Sweethome Q4FY25.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Sweethome Q4FY25.pdf12 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration Sweethome Q4FY25.pdf12 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sweet Home CA certificate-26-12-2024.pdf27 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SWEET HOME-engineer certificate-26-12-2024.pdf27 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architectec CR Sweet home.pdf26 Dec 2024
Disclosure of sold/ booked inventoryFile: sold unsold sweet home.pdf26 Dec 2024
Copy of the legal title reportFile: Search upload.pdf18 Jun 2024
Copy of the legal title reportFile: Flow of Title.pdf18 Jun 2024
Proforma of Agreement for saleFile: AFS Sweet Home.pdf18 Jun 2024
Proforma of Agreement for saleFile: AFS Sweet Home.pdf18 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about seperate bank account as per order 34 PENDING.pdf17 Jun 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report - Agreement for sale Sweet Home.pdf17 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SHCHSL FORM 3 Chartered Accountant Certificate 03062024[1].pdf7 Jun 2024
Layout approvalFile: SHEET1.pdf30 May 2024
Building plan approvalFile: SHEET2.pdf30 May 2024
Building plan approvalFile: SHEET3.pdf30 May 2024
Building plan approvalFile: SHEET4.pdf30 May 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Finance.pdf30 May 2024
Details of encumbrances concerned to FinanceFile: Declaration regarding Encumbrance legal.pdf30 May 2024
Details of encumbrances concerned to LegalFile: Encumbrance Finance.pdf30 May 2024
Details of encumbrances concerned to LegalFile: Declaration regarding Encumbrance legal.pdf30 May 2024
Copy of Layout Approval (in case of layout)File: SHEET1.pdf30 May 2024
Building Plan Approval / NA Order for plotted developmentFile: SHEET2.pdf30 May 2024
Building Plan Approval / NA Order for plotted developmentFile: SHEET3.pdf30 May 2024
Building Plan Approval / NA Order for plotted developmentFile: SHEET4.pdf30 May 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf30 May 2024
Declaration about Commencement CertificateFile: Declaration CC.pdf30 May 2024
Declaration in FORM BFile: Ashwamedh Affidavit.pdf30 May 2024
CERSAI detailsFile: Undertaking regarding creation of security interest.pdf30 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other real estate organisation DAV.pdf30 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosur of interest joshi.pdf30 May 2024
Proforma of Allotment letterFile: Allotment Letter.pdf30 May 2024
Deviation Report with respect to Allotment letterFile: Devaition report Allotment.pdf30 May 2024
Other - LegalFile: Authority letter.pdf30 May 2024
Other - FinanceFile: Authority letter.pdf30 May 2024
Other - TechnicalFile: order 50.pdf30 May 2024
PAN CardFile: PAN Card ASPL.pdf29 May 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
ASHWAMEDH DIGNITYBaner Pune7CompletedJul 2016Jul 2016

Keep SWEET HOME CO-OPERATIVE HOUSING SOCIETY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Erandwane

Builder: ASHWAMEDH SPACES PRIVATE LIMITED

ASHWAMEDH SPACES PRIVATE LIMITED has 12 registrations on MahaRERA, including Ashwamedh Commercia and ASHWAMEDH INTEGRA. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if SWEET HOME CO-OPERATIVE HOUSING SOCIETY is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SWEET HOME CO-OPERATIVE HOUSING SOCIETY?

The registered promoter entity is ASHWAMEDH SPACES PRIVATE LIMITED, a company as per the filing. Its CIN U45200PN2013PTC146453 and GSTIN 27AALCA4065D1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SWEET HOME CO-OPERATIVE HOUSING SOCIETY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SWEET HOME CO-OPERATIVE HOUSING SOCIETY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SWEET HOME CO-OPERATIVE HOUSING SOCIETY?

The professionals named in the filing: Architect: Gohad Architects; Engineer: Mr Akash Tarde; Engineer: RANJIT WANKHEDE; Engineer: Akash Tarde; Engineer: Viren Rathod; Chartered Accountant: Phule Wagh & Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SWEET HOME CO-OPERATIVE HOUSING SOCIETY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SWEET HOME CO-OPERATIVE HOUSING SOCIETY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SWEET HOME CO-OPERATIVE HOUSING SOCIETY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.